|
---|
Category:Letter
MONTHYEARIR 05000361/20240052024-10-0404 October 2024 NRC Inspection Report 05000361/2024005 and 05000362/2024005 ML24240A1692024-09-18018 September 2024 Cy 2023 Summary of Decommissioning Trust Fund Status IR 07200041/20244012024-08-16016 August 2024 San Onofe Nuclear Generating Station, Security Baseline Inspection Report 07200041/2024401 IR 05000361/20240042024-08-0909 August 2024 NRC Inspection Report 05000361/2024004 and 05000362/2024004 ML24191A2472024-07-0202 July 2024 (Songs), Units 1, 2, and 3, and the Independent Spent Fuel Storage Installation - Revision to the ISFSI-Only Emergency Plan and Associated Changes to Emergency Plan Implementing Procedures ML24151A6482024-06-0303 June 2024 Changes in Reactor Decommissioning Branch Project Management Assignments for Some Decommissioning Facilities ML24141A0802024-05-15015 May 2024 (Songs), Units 1, 2 and 3 and Independent Spent Fuel Storage Installation - 2023 Annual Radiological Environmental Operating Report IR 05000361/20240022024-04-0101 April 2024 – NRC Inspection Report 050-00361/2024-002 and 050-00362/2024-002 ML24094A0642024-03-27027 March 2024 Independent Spent Fuel Storage Installation, Decommissioning Funding Status Report 2023 ML24065A0152024-02-28028 February 2024 Generation Station Units 1, 2 and 3, Annual Radioactive Effluent Release Report for Independent Spent Fuel Storage Installation 2023 ML24044A0812024-02-14014 February 2024 LTR-24-0008: NRC Response to Paul Blanch Email Safety of Spent Nuclear Fuel at SONGS ISFSI IR 05000361/20240012024-02-13013 February 2024 NRC Inspection Report 050-00361/2024-001 and 050-00362/2024-001 (1) ML24037A0542024-01-30030 January 2024 (Songs), Units 2 and 3, Submittal of Annual Corporate Financial Reports ML24022A1492024-01-17017 January 2024 Independent Spent Fuel Storage Installation, Revision 4 to the Physical Security Plan ML24017A2432024-01-15015 January 2024 LTR-24-0008 Paul Blanch, E-mails Request for Formal Response to Requests for Meeting to Discuss Safety Issues with NRC Staff IR 05000361/20230062023-11-29029 November 2023 NRC Inspection Report 05000361/2023-006 and 05000362/2023-006 ML23333A0682023-11-22022 November 2023 (SONGS) Units 1, 2, 3 and Independent Spent Fuel Storage Installation - Notification of Change in Nuclear Officer IR 05000361/20230052023-10-11011 October 2023 NRC Inspection Report 05000361/2023005 and 05000362/2023005 ML23276A5942023-09-28028 September 2023 And Independent Spent Fuel Storage Installation - Supplement to Decommissioning Funding Status Reports ML23268A0922023-09-20020 September 2023 Generation Station, Units 1, 2 and 3, and the Independent Spent Fuel Storage Facility (ISFSI) - Re-Registration of Dry Fuel Storage Casks for Amended Certificate of Compliance No. 1040 IR 05000361/20230012023-09-13013 September 2023 NRC Inspection Report 05000361 2023-001 and 05000362 2023-004 ML23240A5372023-08-18018 August 2023 Confirmatory Survey Activities Summary and Results for the Unit 2 and 3 Intake Structures at the San Onofre Nuclear Generating Station San Clemente CA ML23129A1802023-06-14014 June 2023 Cover Letter to State of CA on Draft EA Regarding San Onofre ISFSI Updated DFPs IR 05000361/20230032023-05-31031 May 2023 NRC Inspection Report 05000361/2023003 and 05000362/2023003 IR 05000361/20230022023-05-23023 May 2023 NRC Inspection Report 05000361/2023-002 and 05000362/2023-002 ML23137A1032023-05-11011 May 2023 (Songs), Units 1, 2 and 3, and Independent Spent Fuel Storage Installation - 2022 Annual Radiological Environmental Operating Report ML23123A0932023-04-28028 April 2023 (Songs), Units 1, 2 and 3, Submittal of Annual Radioactive Effluent Release Report - 2022 ML23230A0882023-04-10010 April 2023 Independent Spent Fuel Storage Installation - Decommissioning Quality Assurance Plan ML23094A1272023-03-29029 March 2023 Independent Spent Fuel Storage Installation - 10 CFR 50.82(a)(8)(v and VII) and 10 CFR 72.30(c) Decommissioning Funding Status Report 2021 ML23094A1332023-03-29029 March 2023 Nuclear Property Insurance ML23062A1172023-02-28028 February 2023 Generation Station Units 1, 2 and 3, Annual Radioactive Effluent Release Report for Independent Spent Fuel Storage Installation - 2022 ML22361A1022023-02-24024 February 2023 Reactor Decommissioning Branch Project Management Changes for Some Decommissioning Facilities and Establishment of Backup Project Manager for All Decommissioning Facilities ML23059A2812023-02-22022 February 2023 (Songs), Units 1, 2 and 3, 2022 Annual Turtle Incidental Take Report ML23046A3792023-02-22022 February 2023 NRC Inspection Report 050-00361/2023-001 and 050-00362/2023-001 ML23045A2022023-02-0909 February 2023 Submittal of Annual Corporate Financial Reports for San Onofre Nuclear Generating Station (SONGS) Units 2 and 3 for Fy Ending June 30, 2022 ML22287A1352023-01-0505 January 2023 Issuance of Exemption from Title 10 of the Code of Federal Regulations Part 72.106(B), Independent Spent Fuel Storage Installation Controlled Area Boundary (L-2021-LLE-0056) ML22348A0622023-01-0404 January 2023 NRC to SCE, Transmittal of the National Marine Fisheries Services December 12, 2022, Letter of Concurrence for Decommissioning of San Onofre Nuclear Generating Statiion, Units 2 and 3 IR 05000206/20220062022-12-15015 December 2022 NRC Inspection Report 05000206/2022006, 05000361/2022-006, and 05000362/2022-006 ML22347A2122022-12-12012 December 2022 NMFS to NRC, Endangered Species Act Section 7(a)(2) Concurrence Letter for Decommissioning of the San Onofre Nuclear Generating Station ML22340A6652022-12-0505 December 2022 Letter from John Fassell, Chief; Re., State of California Department of Public Health Review and Comments on SONGS Draft Environmental Assessment ML22333A8192022-11-21021 November 2022 Submittal of San Onofre Nuclear Generating Station, Units 2 and 3, Defueled Safety Analysis Report, Revised November 2022 IR 05000361/20220052022-11-17017 November 2022 – NRC Inspection Report 05000361/2022-005 and 05000362/2022-005 ML22301A1462022-10-20020 October 2022 Report of Violations of the National Pollutant Discharge Elimination System Permit San Onofre Nuclear Generating Station (Songs), Units 2 and 3 ML22277A0162022-09-29029 September 2022 Independent Spent Fuel Storage Installation Response to Request for Additional Information Regarding Request for Exemption from 10 CFR 72.106(b) IR 05000361/20220042022-09-26026 September 2022 NRC Inspection Report 05000361/2022-004 and 05000362/2022-004 ML22238A0552022-08-29029 August 2022 U.S. Nuclear Regulatory Commissions Analysis of Southern California Edisons Decommissioning Funding Status Report for San Onofre Nuclear Generating Station, Units 1, 2, and 3 ML22234A1602022-07-31031 July 2022 Final Report Per 10 CFR Part 21, Degraded Snubber SF1154 Hydraulic Fluid Batch No. 18CLVS431 ML22207B8612022-07-26026 July 2022 NRC (Public) Inspection Report 05000361/2022003; 05000362/2022003 IR 05000361/20220032022-07-26026 July 2022 NRC Inspection Report (Public) 05000361-2022003 and 05000362-2022003 (002) IR 05000361/20220022022-05-12012 May 2022 NRC Inspection Report 05000361/2022-002 and 05000362/2022-002 2024-09-18
[Table view] Category:Licensee Response to Notice of Violation
MONTHYEARML19116A0562019-04-23023 April 2019 ISFSI, Reply to a Notice of Violation, EA-18-155, and Statement of Method of Payment ML18362A1482018-12-26026 December 2018 Reply to a Notice of Violation, EA-18-155, San Onofre Nuclear Generating Station (Songs), Units 1, 2, 3, and ISFSI ML14024A3902014-01-22022 January 2014 Reply to a Notice of Violation; EA 13-083 ML14013A2602013-09-23023 September 2013 Reply to a Notice of Violation: EA 10-191, Revision I ML1117104842011-06-17017 June 2011 Response to Apparent Notice of Violation, IR 05000361-11-012 and 50000362-11-012, EA-11-083 ML1030205272010-10-29029 October 2010 Reply to a Notice of Violation: EA 10-191 ML1024301132010-08-30030 August 2010 Reply to Notice of Violation EA-10-125 ML1022100952010-08-0909 August 2010 Response to Confirmatory Order EA 07-232 and Notice of Violation EA 07-141, Inspection Report Nos. 05000361-07-016, 05000362-07-016, 05000361-07-017, Anbd 05000362-07-017 ML0934503682009-12-0909 December 2009 Generation Station, Units 2 and 3 Reply to Notice of Violation Regarding Inspection Report 05000361-09-004 and 05000362-09-004 ML0903703592009-02-0606 February 2009 Response to Notice of Violation and NRC Inspection Report 05000361/200813; 05000362/2008013 ML0903505052009-01-19019 January 2009 Reply to Notice of Violation; EA-08-296, Inspection Report No. 05000361/2008013 and 05000362/2008013 IR 05000361/20080132009-01-19019 January 2009 Reply to Notice of Violation; EA-08-296, Inspection Report No. 05000361/2008013 and 05000362/2008013 ML0902100762009-01-14014 January 2009 Generation Station Response to Confirmatory Order EA 07-232 and Notice of Violation EA 07-141 IR 05000361/20070052008-03-24024 March 2008 Reply to Notice of Violation; EA-08-051, Inspection Report Nos. 05000361-07-005 and 05000362-07-005 ML0809100652008-03-24024 March 2008 Reply to Notice of Violation; EA-08-051, Inspection Report Nos. 05000361-07-005 and 05000362-07-005 ML0733106132007-11-20020 November 2007 Reply to a Notice of Violation; EA-07-141, Inspection Report No. 05000361-07-017 ML0711401702007-04-16016 April 2007 Reply to a Notice of Violation; EA-06-303, IR 05000361-07-402 and 05000362-07-402, (Cover Letter Only) ML0621903162006-08-0202 August 2006 Day Response to Inspection Report No. 50-206/2006-011 2019-04-23
[Table view] |
Text
Ross T. Ridenoure nEDDISON SOUTHERN CALIFORNIA Senior Vice President and CNO San Onofre Nuclear Generating Station An EDISON INTERNATIONAL& Company January 19, 2009 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D.C. 20555
Subject:
Docket Nos. 50-361 and 50-362 Reply to Notice of Violation; EA-08-296 Inspection Report No. 05000361/2008013 and 05000362/2008013 San Onofre Nuclear Generation Station, Units 2 and 3
References:
Letter from Mr. E. E. Collins (NRC) to Ross T. Ridenoure (SCE) dated December 19, 2008 and LER 2008-006, dated September 17, 2008
Dear Sir or Madam:
The reference letter transmitted the results of NRC Inspection Report No.
05000361/2008013 and 05000362/2008013 to Southern California Edison (SCE). The Special Inspection was conducted between August 4, 2008 and December 11, 2008 at San Onofre Nuclear Generating Station (SONGS), Units 2 and 3. The referenced report also transmitted a Notice of Violation (EA-08-296). The attachment to this letter provides the required response to the Notice of violation.
If you have any questions, please feel free to contact me or Mr. A. E. Scherer.
Sincerely,
Enclosure:
As stated cc: E. E. Collins, Regional Administrator, NRC Region IV G. Warnick, NRC Senior Resident Inspector, San Onofre Units 2 and 3 Mail Stop D45 P.O. Box 128 San Clemente, CA 92672 (949) 368-6255 PAX 86255 J~t~DI Fax: (949) 368-6183 Ross.Ridenoure@sce.com
ENCLOSURE REPLY TO A NOTICE OF VIOLATION The Enclosure to Mr. E. E. Collin's letter dated December 19, 2008, states in Part:
During an NRC inspection completed on December 11, 2008, a violation of NRC requirements was identified. In accordance with the NRC Enforcement Policy, the violation is listed below:
10 CFR Part 50, Appendix B, Criterion V, "Instructions, Procedures, and Drawings," states, in part, that activities affecting quality shall be prescribed by documented instructions, procedures, or drawings of a type appropriate to the circumstances and shall be accomplished in accordance with these instructions, procedures, or drawings. Instructions and procedures shall include appropriate quantitative or qualitative acceptance criteria for determining that important activities have been satisfactorily accomplished.
Contrary to the above, in March 2004, the licensee engaged in activities affecting quality that were not prescribed by documented instructions or procedures of the type appropriate to the circumstances. Specifically, maintenance and work control personnel failed to develop appropriate instructions or procedures, and failed to include quantitative or qualitative steps to ensure the maintenance activities on safety-related 125 Vdc station battery Breaker 2D201 had been satisfactorily completed. The work plan described in Maintenance Order 03100406000 was incomplete and lacked the steps necessary to ensure that-electrical connection fasteners on Breaker 2D201 upper stud to bus bar connections were properly installed. This failure resulted in the Unit 2 safety-related Battery 2B008 being inoperable between March 2004 and March 25, 2008.
This violation is associated with a White significance determination process finding.
SCE RESPONSE TO VIOLATION BACKGROUND AND EVENT
SUMMARY
On March 25, 2008, while performing a weekly surveillance of a 1 E battery, plant personnel discovered its voltage below the required value. SCE determined the low voltage was caused by loose bolts to the DC breaker connecting the battery to the source of the battery charging current, the 1 E 125 VDC bus. SCE determined that the degraded electrical connection to the DC breaker was due to an inadequate work plan and lack of checks during installation in March 2004. A report of the event was submitted on September 17, 2008 (LER 2008-013).
As discussed with the Nuclear Regulatory Commission during the Special Inspection Exit meeting on December 11, 2008, SCE does not contest the violation or the NRC's determination of its significance.
- 1. Reason for the Violation The SCE Root Cause Evaluation for the maintenance activity of the 2004 installation of the DC breaker identified two root causes leading to the deficient work. First, SCE concluded that the Work Order was not sufficient in detail to match the significance of the work activity. SCE planner personnel do not consistently perform to the same set of standards. In this case, the Maintenance Order Planner did not include critical steps in the work plan and did not provide adequate instruction to verify the tightness of the breaker bolts. The work plan was reliant on a single barrier (the electrician's performance) to ensure proper tightening of the bolts.
SCE concluded the event involved not only planners not meeting procedure expectations, but also electricians not meeting expectations for applying their skills/knowledge in the conduct of their work. In addition, the supervisor was not overseeing work and verifying critical steps were complete. Underlying these behaviors was a lack of accountability.
- 2. Corrective Actions Taken and Results Achieved
- a. On March 25, 2008, SCE tightened the loose connections for 2D201 which restored battery 2B008 to Operable status.
- b. On March 25-26, 2008, SCE inspected the bolt/connections for the seven similar breakers and verified that they were tight.
- c. SCE revised appropriate maintenance procedures to provide additional assurance that critical electrical connections, as defined by procedure, disturbed during maintenance activities are restored to their design condition. These changes include:
o Additional verifications of connection torque or tightness.
o Specification of torque values in procedure or work order instructions.
o Post maintenance verification testing to confirm the connection is restored to design condition.
- d. To assess the extent of condition, SCE reviewed over 1300 Maintenance Orders for the electrical portion of the Emergency Diesel systems, the Auxiliary Feedwater system and the 1 E electrical system. This review covered the previous 3 years and focused on identifying previously performed work in which the work plan lacked critical steps and verification.
- e. Based upon the review described in 2.d, SCE has initiated inspection of the limited set of connections based upon the work plans that lacked critical steps and verification. This effort is on-going.
- f. SCE has initiated independent reviews to find and correct deficiencies of previously planned Maintenance Order work plans prior to issuance to the field.
(This review includes the equipment whose failure may initiate (a) a plant trip, (b) a 5% reduction in load, (c) entry into a 72-hour or less Technical Specification required shutdown or (d) DG inoperability.)
- g. To initially address the issue of not meeting expectations, SCE has reviewed the lessons learned from this event with the planners, electricians and supervisors involved with the 2004 installation.
- 3. Corrective Actions That Will Be Taken
- a. SCE recognizes the importance of its responsibilities with respect to identifying and correcting significant degraded conditions, not meeting expectations and lack of accountability. Consequently, the RCE that addressed the causes of this event is being expanded and broadened. Additional Corrective Actions are anticipated that will further address the root causes and reduce the likelihood of a future safety significant equipment functional failure due to loose electrical connections.
- b. SCE is developing training modules to train planners in planning fundamentals.
These modules will address the use of newly revised planning procedures as well as other applicable division and site procedures. SCE anticipates the program will be implemented and training will begin in April 2009.
- 4. Date When Full Compliance Will Be Achieved Full compliance with the Technical Specifications was achieved with the maintenance performed on March 25, 2008 and Battery 2B008 restored to Operable status.
Full compliance with 10 CFR 50 Appendix B, Criterion V was achieved on December 31, 2008 when revised procedures (in 2.c) were issued.