UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 February 3, 2009 Mr. Larry Meyer Site Vice President FPLE Point Beach 6610 Nuclear Road Two Rivers, WI 54241-9516 SUB~IECT:
POINT BEACH NUCLEAR PLANT, UNITS 1 AND 2 - REQUEST FOR ADDITIONAL INFORMATION RELATED TO UNIT 2 STEAM GENERATOR TUBE INPECTION REPORT (TAC NO. MD9689)
Dear Mr. Meyer:
By letter dated September 16, 2008 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML082590073), FPL Energy Point Beach, LLC, submitted information pertaining to the 2008 steam generator tube inspections performed at Point Beach Nuclear Plant, Unit 2, during the spring 2008 refueling outage.
The Nuclear Regulatory Commission (NRC) staff is reviewing your submittal and has determined that additional information is required to complete the review. The specific information requested is addressed in the enclosure to this letter. During a discussion with your staff on January 23, 2009, it was agreed that you would provide a response within 30 days of the date of this letter.
The NRC staff considers that timely responses to requests for additional information help ensure sufficient time is available for staff review and contribute toward the NRC's goal of efficient and effective use of staff resources. If circumstances result in the need to revise the requested response date, please contact me at (301) 415-2048.
Sincerely, Justin C. Poole, Project Manager Plant Licensing Branch 111-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-301
Enclosure:
Request for Additional Information cc w/encl: Distribution via ListServ
REQUEST FOR ADDITIONAL INFORMATION POINT BEACH NUCLEAR POWER PLANT, UNIT 2 DOCKET NO. 50-301
- 1. For each refueling outage or steam generator (SG) tube inspection since installation of the SGs, please provide the cumulative effective full power months that the SGs have operated.
- 2. On page 1 of Enclosure 1 for the September 16, 2008, letter, it is stated that the tubes are on a 1.0687-inch triangular pitch. On page 1 of Enclosure 1 for the October 13, 2004, letter (ADAMS Accession No. ML042990532), it is stated that the tube pitch and pattern is 1.234" Triangular. Please clarify.
- 3. Please confirm that the only service induced indications detected were those listed.
- 4. Other than foreign object search and retrieval, please discuss the scope and results of any other secondary side inspections. In addition, please discuss the results of your 2006 inspection of the SG B steam drum, upper internals, feedrings, and integrated J-nozzles, as discussed in your February 19, 2007, letter (ADAMS Accession No. ML070590203).
- 5. In the area around Row 81, Column 42, a possible loose part was reported but this area could not be visually inspected. Please discuss how you assessed that tube integrity would be maintained at this location until the next inspection. In addition, please clarify whether any loose parts (other than those specifically mentioned in your report) were found in either SG.
- 6. In Section "c" you imply that 100 percent of the dings in the freespan that are greater than or equal to 5 volts were inspected with a +Point' probe. In addition, this section also implies that all dings/dents in the U-bend and at tube supports were inspected with a -Point' probe. Please confirm these inspections were performed since they were not reported in Section "a" of your report.
- 7. Wear indications at the anti-vibration bars and at the tube supports were reported for the first time during your 2008 inspections. Please discuss any insights on why these indications appeared to have initiated after -10 years of operation (e.g., any power uprates or changes in secondary flow conditions).
Enclosure
February 3, 2009 Mr. Larry Meyer Site Vice President FPLE Point Beach 6610 Nuclear Road Two Rivers, WI 54241-9516
SUBJECT:
POINT BEACH NUCLEAR PLANT, UNITS 1 AND 2 - REQUEST FOR ADDITIONAL INFORMATION RELATED TO UNIT 2 STEAM GENERATOR TUBE INPECTION REPORT (TAC NO. MD9689)
Dear Mr. Meyer:
By letter dated September 16, 2008 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML082590073), FPL Energy Point Beach, LLC, submitted information pertaining to the 2008 steam generator tube inspections performed at Point Beach Nuclear Plant, Unit 2, during the spring 2008 refueling outage.
The Nuclear Regulatory Commission (NRC) staff is reviewing your submittal and has determined that additional information is required to complete the review. The specific information requested is addressed in the enclosure to this letter. During a discussion with your staff on January 23, 2009, it was agreed that you would provide a response within 30 days of the date of this letter.
The NRC staff considers that timely responses to requests for additional information help ensure sufficient time is available for staff review and contribute toward the NRC's goal of efficient and effective use of staff resources. If circumstances result in the need to revise the requested response date, please contact me at (301) 415-2048.
Sincerely, IRAJ T. Wengert for Justin C. Poole, Project Manager Plant Licensing Branch 111-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-301
Enclosure:
Request for Additional Information cc w/encl: Distribution via ListServ DISTRIBUTION:
PUBLIC LPL3-1 rlf RidsNrrDorlLpl3-1 Resource A. Hiser, NRR RidsNrrPMPointBeachResource RidsNrrALATHarrisResource RidsOgcRpResource RidsAcrsAcnw_MailCTRResource RidsNrrDirsltsbResource W. Golumbfskie, NRR RidsRgn3MailCenterResource RidsNrrDorlDprResource ADAMS Accession Nurnber: ML090230617
- 'per Memo d t d 12/23/08 ae OFFICE LPL3-1/PM LPL3-1/LA NAME JPoole ITJW for THarris DATE 01/30109 01/30109 NRRISRXB AHiser*
12/23/08 LPL3-1/BC LJames 02/03/09 OFFICIAL RECORD COPY