ML090220315
| ML090220315 | |
| Person / Time | |
|---|---|
| Site: | Peach Bottom |
| Issue date: | 01/15/2009 |
| From: | Hansell S Operations Branch I |
| To: | Wasong A Exelon Generation Co |
| Hansell S | |
| Shared Package | |
| ML081060602 | List: |
| References | |
| TAC U01776 | |
| Download: ML090220315 (3) | |
Text
January 15, 2009 Mr. Tony Wasong Director, Nuclear Training Exelon Generation Company Peach Bottom Atomic Power Station 1848 Lay Road Delta, PA 17314
Subject:
NRC Operator Licensing Initial Exam Results Peach Bottom Atomic Power Station, Units 2 and 3 (Cover letter publicly available; enclosures withheld from public.)
Dear Mr. Wasong:
The purpose of this letter is to inform you of the individual examination results for your applicants on the initial written examination conducted on December 18, 2008, and the walk-through (overall) and/or simulator operating tests administered December 8 to December 16, 2008 at your facility. This meets the intent of Section E.1 of ES-501 of NUREG 1021, Operator Licensing Examination Standards for Power Reactors. This information is considered proprietary in accordance with 10 CFR 2.390 and it supplements the information contained in the related examination report for your facility which will be issued shortly.
As indicated in Enclosure 1, the completed ES-501-2, Power Plant Licensing Examination Results Summary, fifteen individuals who took the examination passed. However, we will not issue three licenses until you certify in writing that they have acquired all of the training and experience for which they were previously granted a waiver.
contains the individual results ES-303-1 and 303-2, Operator License Examination Report, for each of the applicants. Contained therein are the deficiencies noted for each applicant. In accordance with your Systems Approach to Training (SAT) Program, we expect that you will review these results and provide appropriate remedial training for the individual independent of the overall pass status. The applicants have authorized the release of this information to your facility by signing Block 19A of their license applications (i.e., NRC Form 398).
is a copy of the licenses.
Thank you for your cooperation in this matter. Please refer any questions you have to me at (610) 337-5046.
Sincerely,
/RA/
Samuel L. Hansell, Jr., Chief Operations Branch Division of Reactor Safety Docket Nos. 05000277, 05000278 License Nos. DPR-44, DPR-56
Enclosures:
- 1. ES-501-2, Power Plant Licensing Examination Results Summary
- 2. ES-303-1 and 303-2, Individual Examination Results
- 3. Licenses cc w/licenses:
Mr. William F. Maguire, Site Vice President
Thank you for your cooperation in this matter. Please refer any questions you have to me at (610) 337-5046.
Sincerely,
/RA/
Samuel L. Hansell, Jr., Chief Operations Branch Division of Reactor Safety Docket Nos. 05000277, 05000278 License Nos. DPR-44, DPR-56
Enclosures:
- 1. ES-501-2, Power Plant Licensing Examination Results Summary
- 2. ES-303-1 and 303-2, Individual Examination Results
- 3. Licenses cc w/licenses:
Mr. William F. Maguire, Site Vice President Distribution: w/o enclosures:
Master Exam File SUNSI Review Complete: SLH (Reviewer=s Initials)
ADAMS PKG NO.: ML081060602 DOCUMENT NAME: G:\\DRS\\Operations Branch\\FISH\\Exam 09-PB Dec08 (U01776)\\ExamNotificationLtr1.doc After declaring this document AAn Official Agency Record,@ it will be released to the Public.
OFFICE RI/DRS/OB RI/DRS/OB RI/DRS/OB NAME CJBixler/CJB THFish/SLH for SLHansell/SLH DATE 01/14/09 01/ 15 /09 01/ 15/09 OFFICIAL RECORD COPY