October 22, 2008

Randall K. Edington, Executive

Vice President, Nuclear/CNO

Mail Station 7602

Arizona Public Service Company

P.O. Box 52034

Phoenix, AZ 85072-2034

SUBJECT:

PALO VERDE NUCLEAR GENERATING STATION - NOTIFICATION OF

INSPECTION (NRC INSPECTION REPORT 05000528/2008005;

05000529/2008005; 05000530/2008005) AND REQUEST FOR INFORMATION

Dear Mr. Edington:

From November 17-21 and December 1-5, 2008, Reactor Inspectors from the NRCs Region IV

office will perform the baseline inspection of changes, tests, or experiments, and permanent

plant modifications at Palo Verde Nuclear Generating Station, using NRC Inspection

Procedure 71111.17, Evaluations of Changes, Tests, or Experiments, and Permanent Plant

Modifications.

Experience has shown that this inspection is resource intensive both for the NRC inspectors

and your staff. In order to minimize the impact to your onsite resources and to ensure a

productive inspection, we have enclosed a request for documents needed for this inspection.

Upon review of these documents, the inspectors will select additional documentation for review

upon arrival. It is important that all of these documents are up to date and complete in order to

minimize the number of additional documents requested during the preparation and/or the

onsite portions of the inspection.

We have discussed the schedule for these inspection activities with your staff and understand

that our regulatory contact for this inspection will be Mr. Delbert Elkinton of your licensing

organization. If there are any questions about this inspection or the material requested, please

contact the lead inspector, Sam Graves at (817) 860-8102 (samuel.graves@nrc.gov).

UNITED STATES

NUCLEAR REGULATORY COMMISSION

RE GI O N IV

611 RYAN PLAZA DRIVE, SUITE 400

ARLINGTON, TEXAS 76011-4005

Arizona Public Service Company

- 2 -

In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its

enclosure will be available electronically for public inspection in the NRC Public Document

Room or from the Publicly Available Records (PARS) component of NRC's document system

(ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-

rm/adams.html (the Public Electronic Reading Room).

Sincerely,

/RA/

Russell L. Bywater, Chief

Engineering Branch 1

Division of Reactor Safety

Dockets: 50-528; 50-529; 50-530

Licenses: NPF-41; NPF-51; NPF-74

Enclosure:

Evaluations of Changes, Tests, or

Experiments and Permanent Plant

Modifications Document Request

cc: w/enclosure

Mr. Steve Olea

Arizona Corporation Commission

1200 W. Washington Street

Phoenix, AZ 85007

Mr. Douglas Kent Porter

Senior Counsel

Southern California Edison Company

Law Department, Generation Resources

P.O. Box 800

Rosemead, CA 91770

Chairman

Maricopa County Board of Supervisors

301 W. Jefferson, 10th Floor

Phoenix, AZ 85003

Mr. Aubrey V. Godwin, Director

Arizona Radiation Regulatory Agency

4814 South 40 Street

Phoenix, AZ 85040

Arizona Public Service Company

- 3 -

Mr. Scott Bauer, Director

Regulatory Affairs

Palo Verde Nuclear Generating Station

Mail Station 7636

P.O. Box 52034

Phoenix, AZ 85072-2034

Mr. Dwight C. Mims

Vice President

Regulatory Affairs and Plant Improvement

Palo Verde Nuclear Generating Station

Mail Station 7605

P.O. Box 52034

Phoenix, AZ 85072-2034

Mr. Jeffrey T. Weikert

Assistant General Counsel

El Paso Electric Company

Mail Location 167

123 W. Mills

El Paso, TX 79901

Mr. Eric Tharp

Los Angeles Department of Water & Power

Southern California Public Power Authority

P.O. Box 51111, Room 1255-C

Los Angeles, CA 90051-0100

Mr. James Ray

Public Service Company of New Mexico

2401 Aztec NE, MS Z110

Albuquerque, NM 87107-4224

Mr. Geoffrey M. Cook

Southern California Edison Company

5000 Pacific Coast Hwy. Bldg. D21

San Clemente, CA 92672

Mr. Robert Henry

Salt River Project

6504 East Thomas Road

Scottsdale, AZ 85251

Mr. Brian Almon

Public Utility Commission

William B. Travis Building

P.O. Box 13326

1701 North Congress Avenue

Austin, TX 78701-3326

Arizona Public Service Company

- 4 -

Ms. Karen O' Regan

Environmental Program Manager

City of Phoenix

Office of Environmental Programs

200 West Washington Street

Phoenix, AZ 85003

Mr. John C. Taylor

Director, Nuclear Generation

El Paso Electric Company

340 East Palm Lane, Suite 310

Phoenix, AZ 85004

Chief, Radiological Emergency Preparedness Section

National Preparedness Directorate

Technological Hazards Division

Department of Homeland Security

1111 Broadway, Suite 1200

Oakland, CA 94607-4052

Arizona Public Service Company

- 5 -

Electronic distribution by RIV:

Regional Administrator (Elmo.Collins@nrc.gov)

DRP Director (Dwight.Chamberlain@nrc.gov)

DRP Deputy Director (Anton.Vegel@nrc.gov)

DRS Director (Roy.Caniano@nrc.gov)

DRS Deputy Director (Troy.Pruett@nrc.gov)

Senior Resident Inspector (Ryan.Treadway@nrc.gov)

Resident Inspector (Michelle.Catts@nrc.gov)

Resident Inspector (Jim.Melfi@nrc.gov)

Resident Inspector (Joe.Bashore@nrc.gov)

Branch Chief, DRP/D (Michael.Hay@nrc.gov)

PV Site Secretary (Patricia.Coleman@nrc.gov)

Senior Project Engineer, DRP/D (Don Allen@nrc.gov)

Public Affairs Officer (Victor.Dricks@nrc.gov)

Team Leader, DRP/TSS (Chuck.Paulk@nrc.gov)

RITS Coordinator (Marisa.Herrera@nrc.gov)

Only inspection reports to the following:

DRS STA (Dale.Powers@nrc.gov)

Mark Cox, OEDO RIV Coordinator (Mark.Cox@nrc.gov)

ROP reports (ROP Reports)

SUNSI Review Completed:

ADAMS: 6 Yes

No Initials:

6 Publicly Available Non-Publicly Available Sensitive

6 Non-Sensitive

S:\\DRS\\REPORTS\\PV2008005lt-stg.doc

ML08

RI:EB1

RI:EB1

RI:EB1

C:EB1

SGraves

SMakor

JDrake

RLBywater

/RA/

/RA/

/RA/

/RA/

10/22/08

10/22/08

10/22/08

10/22/08

OFFICIAL RECORD COPY

T=Telephone E=E-mail F=Fax

- 1 -

Enclosure

Evaluations of Changes, Tests, or Experiments and Permanent Plant Modification

Inspection Dates:

November 17, 2008 - November 21, 2008

December 1, 2008 - December 5, 2008

Inspection Procedures:

IP 71111.17 Evaluation of Changes, Tests, or Experiments and

Permanent Plant Modifications

Inspectors:

S. Graves, Senior Reactor Inspector, Lead Inspector

J. Drake, Senior Reactor Inspector

S. Makor, Reactor Inspector

Information Requested for the In-Office Preparation Week

The following information should be sent to the Region IV office in hard copy or electronic

format (ims.certrec.com preferred) in care of S. Graves, by November 3, 2008, to facilitate the

selection of specific items that will be reviewed during the onsite inspection weeks. The

inspectors will select specific items from the information requested below and then request from

your staff additional documents needed during the onsite inspection weeks. We ask that the

specific items requested be available and ready for review on the first day of inspection. Also,

we request that you categorize the documents in your response with the numbered list below.

Please provide requested documentation electronically if possible. If requested documents are

large and only hard copy formats are available, please inform the inspector(s), and provide

subject documentation during the first day of the onsite inspection. If you have any questions

regarding this information request, please call the lead inspector as soon as possible.

1. A list with descriptions of all 10 CFR 50.59 screenings performed since June, 2006,

which did not result in an evaluation. Note: Description of screenings should be brief, but

of sufficient detail so that inspectors can determine the significance of the issue

2. A list with descriptions of all 10 CFR 50.59 evaluations performed which did not result in

an application for license amendment to NRC from June 2006 to the present. Note:

Description of evaluations should be brief but of sufficient detail so that inspectors can

determine the significance of the issue

3. Palo Verde Nuclear Generating Station procedure for conducting 10 CFR 50.59

screenings and evaluations

4. A list with descriptions of all Corrective Action documents related to 10 CFR 50.59

activities, including screenings and evaluations from June 2006 to the present

5. A list with descriptions of all permanent plant modifications dating from June 2006.

Include sufficient detail to enable the inspector to determine the significance of each

modification

- 2 -

Enclosure

6. Palo Verde Nuclear Generating Station procedure for implementing and controlling

permanent plant modifications

7. A list with descriptions of all Corrective Action documents related to your permanent

plant modification program and its implementation since June, 2006. Include sufficient

detail to enable the inspector to determine the significance of each modification

8. A listing of personnel qualified to prepare 10 CFR 50.59 screenings and evaluations,

including qualification dates

9. A listing of personnel qualified to review and approve 10 CFR 50.59 screenings and/or

evaluations, including qualification dates

Inspector Contact Information:

S. Graves

S. Makor

J. Drake

Senior Reactor Inspector

Reactor Inspector

Senior Reactor Inspector

817-860-8102

817-276-6507

817-276-6558

Samuel.Graves@nrc.gov

Shiattin.Makor@nrc.gov

James.Drake@nrc.gov

Mailing Address:

US NRC Region IV

Attn: S. Graves

612 E. Lamar Blvd., Suite 400

Arlington, TX 76011-4125