October 22, 2008 Mr. Britt T. McKinney Sr. Vice President and Chief Nuclear Officer PPL Susquehanna, LLC 769 Salem Blvd., NUCSB3 Berwick, PA 18603-0467
SUBJECT:
REQUEST FOR ADDITIONAL INFORMATION FOR THE REVIEW OF THE SUSQUEHANNA STEAM ELECTRIC STATION, UNITS 1 AND 2, LICENSE RENEWAL APPLICATION
Dear Mr. McKinney:
By letter dated September 13, 2006, PPL Susquehanna, LLC submitted an application pursuant to Title 10 of the Code of Federal Regulations Part 54 (10 CFR Part 54), to renew the operating licenses for Susquehanna Steam Electric Station, Units 1 and 2, for review by the U.S. Nuclear Regulatory Commission (NRC or the staff). The staff is reviewing the information contained in the license renewal application and has identified, in the enclosure, areas where additional information is needed to complete the review. Further requests for additional information may be issued in the future.
Items in the enclosure were discussed with Duane Filchner, and a mutually agreeable date for the response is within 30 days from the date of this letter. If you have any questions, please contact me at 301-415-4029 or by e-mail at evelyn.gettys@nrc.gov.
Sincerely,
\\RA\\
Evelyn Gettys, Project Manager Projects Branch 1 Division of License Renewal Office of Nuclear Reactor Regulation Docket Nos. 50-387 and 50-388
Enclosure:
As stated cc w/encl: See next page
ML082831712 OFFICE LA:DLR PM:RPB1:DLR BC:RER1 BC: RPB1:DLR NAME SFigueroa EGettys JDozier (JMedoff for)
DPelton DATE 10/14/08 10/22/08 10/22/08 10/22/08
SUSQUEHANNA STEAM ELECTRIC STATION, UNITS 1 AND 2 LICENSE RENEWAL APPLICATION REQUEST FOR ADDITIONAL INFORMATION RAI 4.3-8 Section 4.3.2 of the license renewal application (LRA) discusses the evaluation of the Reactor Pressure Vessel (RPV) internals. The LRA indicates that structural evaluations were performed to address the effects of operation under extended power uprate conditions and the extended period of operation to 60 years. Explain how the number of reactor design transient cycles for 60 years of plant operation was determined for the analysis of the RPV internals.
RAI 4.3-9 Section 4.3.3 of the LRA discusses the evaluation of the effects of the reactor coolant environment on the fatigue life of components and piping. Table 4.3-3 provides the 60-year environmental cumulative usage factor (CUF) for each component evaluated. Provide a summary of the environmental factor (Fen) calculation for each component analyzed; including the values of oxygen level, temperature and strain rate used in the calculations. Also provide the basis for oxygen level, temperature and strain rate values used in the Fen calculations.
RAI 4.3-10 Table 4.3-2 of the LRA provides the 60-year CUF projections for the RPV shell at the shroud support for both units. List the transients that are the most significant contributors to the CUFs of both units. Discuss the fatigue analyses that were performed for the shroud support locations. Also include a discussion of any conservative assumptions that may have been used in the analyses.
RAI 4.3-11 The August 1, 2008, response to RAI B.3.1-2 indicates the FatiguePro software is used for stress-based fatigue (SBF) monitoring of the feedwater nozzle forgings, feedwater nozzle safe ends, and the control rod drive penetrations. The response to RAI B.3.1-1 also indicates that the SBF monitoring methodology was benchmarked against the relevant design basis stress report for each component to ensure valid fatigue monitoring program fatigue results.
- a.
Describe the procedure used to benchmark the SBF monitoring locations against the relevant design reports. List all the transients used for the benchmarking and indicate the design fatigue usage associated with each transient pairing. Also, provide side-by-side comparison on stresses for each transient and each component used for the benchmarking.
- b.
Discuss how the SSES SBF monitoring addresses the concern raised in proposed Regulatory Information Summary (RIS), Fatigue Analysis of Nuclear Power Plant Components, May 1, 2008 (73 FR 24094). Indicate whether any additional benchmarking of the SSES SBF monitoring is planned.
ENCLOSURE
Letter to B. McKinney from E. Gettys, dated October 22, 2008 DISTRIBUTION:
SUBJECT:
REQUEST FOR ADDITIONAL INFORMATION FOR THE REVIEW OF THE SUSQUEHANNA STEAM ELECTRIC STATION, UNITS 1 AND 2, LICENSE RENEWAL APPLICATION HARD COPY:
DLR RF E-MAIL:
PUBLIC RidsNrrDlr RidsNrrDlrRlra RidsNrrDlrRlrb RidsNrrDlrRlrc RidsNrrDlrReba RidsNrrDlrRebb RidsNrrDciCvib RidsNrrDciCpnb RidsNrrDraAfpb RidsNrrDeEmcb RidsNrrDeEeeb RidsNrrDssSrxb RidsNrrDssSbpb RidsNrrDssScvb RidsOgcMailCenter EGettys FJaxheimer
Susquehanna Steam Electric Station, Units 1 and 2 cc:
Cornelius J. Gannon Vice President - Nuclear Operations PPL Susquehanna, LLC 769 Salem Blvd., NUCSB3 Berwick, PA 18603-0467 Robert M. Paley General Manager - Plant Support PPL Susquehanna, LLC 769 Salem Blvd., NUCSB2 Berwick, PA 18603-0467 Rocco R. Sgarro Manager - Nuclear Regulatory Affairs PPL Susquehanna, LLC Two North Ninth Street, GENPL4 Allentown, PA 18101-1179 Supervisor - Nuclear Regulatory Affairs PPL Susquehanna, LLC 769 Salem Blvd., NUCSA4 Berwick, PA 18603-0467 Michael H. Crowthers Supervisor - Nuclear Regulatory Affairs PPL Susquehanna, LLC Two North Ninth Street, GENPL4 Allentown, PA 18101-1179 Ronald E. Smith General Manager - Site Preparedness and Services PPL Susquehanna, LLC 769 Salem Blvd., NUCSA4 Berwick, PA 18603-0467 Michael H. Rose Manager - Quality Assurance PPL Susquehanna, LLC 769 Salem Blvd., NUCSB2 Berwick, PA 18603-0467 Joseph J. Scopelliti Community Relations Manager, Susquehanna PPL Susquehanna, LLC 634 Salem Blvd., SSO Berwick, PA 18603-0467 Bryan A. Snapp, Esq.
Associate General Counsel PPL Services Corporation Two North Ninth Street, GENTW3 Allentown, PA 18101-1179 Document Control Services PPL Susquehanna, LLC Two North Ninth Street, GENPL4 Allentown, PA 18101-1179 Richard W. Osborne Allegheny Electric Cooperative, Inc.
212 Locust Street P.O. Box 1266 Harrisburg, PA 17108-1266 Director, Bureau of Radiation Protection Pennsylvania Department of Environmental Protection Rachel Carson State Office Building P.O. Box 8469 Harrisburg, PA 17105-8469 Senior Resident Inspector U.S. Nuclear Regulatory Commission P.O. Box 35, NUCSA4 Berwick, PA 18603-0035 Regional Administrator, Region 1 U.S. Nuclear Regulatory Commission 475 Allendale Road King of Prussia, PA 19406
Susquehanna Steam Electric Station, Units 1 and 2 cc:
Board of Supervisors Salem Township P.O. Box 405 Berwick, PA 18603-0035 Dr. Judith Johnsrud National Energy Committee Sierra Club 443 Orlando Avenue State College, PA 16803