Site Specific Implementation of B.5.b Phase 2 and 3 Mitigating Strategies Temporary Instruction Inspection (IR 05000361-08-007 and 05000362-08-007)
ML082770628
Person / Time
Site: San Onofre  Southern California Edison icon.png
Issue date: 10/03/2008
From: Ryan Lantz
NRC/RGN-IV/DNMS/OB
To: Ridenoure R
Southern California Edison Co
Lynn berger
References
IR-08-007
Download: ML082770628 (2)


See also: IR 05000361/2008007

Text

OFFICIAL USE ONLY - SECURITY- RELATED INFORMATION

UNITED STATES

NUC LE AR RE G UL AT O RY C O M M I S S I O N

R E GI ON I V

612 EAST LAMAR BLVD , SU I TE 400

AR LI N GTON , TEXAS 76011-4125

October 3, 2008

Mr. Ross T. Ridenoure

Senior Vice President and Chief Nuclear Officer

Southern California Edison Company

San Onofre Nuclear Generating Station

P.O. Box 128

San Clemente, CA 92674-0128

SUBJECT: SAN ONOFRE NUCLEAR GENERATING STATION, UNITS 2 AND 3 -

SITE-SPECIFIC IMPLEMENTATION OF B.5.B PHASE 2 AND 3 MITIGATING

STRATEGIES TEMPORARY INSTRUCTION INSPECTION (NRC INSPECTION

REPORT 05000361/2008007 AND 05000362/2008007)

Dear Mr. Ridenoure:

On August 22, 2008, the U.S. Nuclear Regulatory Commission (NRC) completed a site-specific

implementation of B.5.b, Phase 2 and 3, temporary instruction team inspection of your San

Onofre Nuclear Generating Station, Units 2 and 3. The enclosed report documents the teams

results, which were discussed on August 22, 2008, with Mr. A. Hochevar and other members of

your staff.

The inspection examined activities conducted under your license as they relate to the

implementation of B.5.b, Phase 2 and 3, mitigating strategies, your compliance with the

Commissions rules and regulations, and with the condition of your operating license. Within

these areas, the inspection involved examination of selected procedures and records,

observation of activities, and interviews with station personnel.

Based on the results of this inspection, no findings of significance were identified.

OFFICIAL USE ONLY - SECURITY- RELATED INFORMATION

OFFICIAL USE ONLY - SECURITY- RELATED INFORMATION

Southern California Edison Company -2-

In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be

available electronically for public inspection in the NRC Public Document Room or from the

Publicly Available Records component of NRCs document system (ADAMS). ADAMS is

accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public

Electronic Reading Room). However, because of the sensitive information contained in the

enclosure, and in accordance with 10 CFR 2.390, a copy of this letters enclosure will not be

available for public inspection.

Sincerely,

/RA/

Ryan E. Lantz, Chief

Operations Branch

Division of Reactor Safety

Dockets: 50-361; 50-362

Licenses: NPF-10; NPF-15

Nonpublic Enclosure:

Inspection Report 05000361/2008007; 05000362/2008007

w/Attachment: Supplemental Information

cc w/o enclosure:

Vice President and Site Manager

Southern California Edison Company

San Onofre Nuclear Generating Station

P.O. Box 128

San Clemente, CA 92674-0128

Mr. A. Edward Scherer

Director, Nuclear Regulatory Affairs

Southern California Edison Company

San Onofre Nuclear Generating Station

P.O. Box 128

San Clemente, CA 92674-0128

Mr. James T. Reilly

Southern California Edison Company

San Onofre Nuclear Generating Station

P.O. Box 128

San Clemente, CA 92674-0128

OFFICIAL USE ONLY - SECURITY- RELATED INFORMATION