4 Tennessee Valley Authority, Post Office Box 2000, Spring City, Tennessee 37381-2000 SEP 2 4 2008 U. S. Nuclear Regulatory Commission ATTN' Document Control Desk Washington, D.C. 20555-0001 Gentlemen:

In the Matter of

)

Docket Nos. 50-390 Tennessee Valley Authority

)

50-391 WATTS BAR NUCLEAR PLANT (WBN) - DAM SAFETY INSPECTION RESULTS AND FUTURE SCHEDULING UPDATE This letter supersedes TVA's letter, "Watts Bar Nuclear Plant (WBN)- Dam Safety Inspection Results and Future Scheduling," dated August 29, 2008. This letter resolves a date discrepancy included in the August 29, 2008 letter. On page E-2 of the enclosure, the date of the inspection should have been 07/18/2008 instead of 05/28/2004.

Enclosed is the corrected version of the inspection results.

As indicated in TVA's August 29, 2008 letter, future inspections of this dam are being tracked in the Enterprise Maintenance Planning and Control (EMPAC) system for intervals of 2.5 years and 5 years. TVA has reviewed the applicable criteria and determined that no structures at Sequoyah Nuclear Plant or Browns Ferry Nuclear Plant qualify as dams under the Federal Guidelines.

There are no regulatory commitments associated with this submittal. The correction of the inspection date was discussed with George Wilson of your staff. If you have any questions concerning this matter, please call Rusty Tompkins, Dam Safety Manager, at (423) 751-6111.

Sincerely, M. K. Brandon Manager, Site Licensing and Industry Affairs Enclosure cc: See Page 2 uikc(a

U.S. Nuclear Regulatory Commission Page 2 SEP 2 4 2008 Enclosures cc (Enclosures):

NRC Resident Inspector Watts Bar Nuclear Plant 1260 Nuclear Plant Road Spring City, Tennessee 37381 ATTN: Patrick D. Milano, Project Manager U.S. Nuclear Regulatory Commission Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation MS 0-8 H4 Washington, DC 20555-0001 U.S. Nuclear Regulatory Commission Region II Sam Nunn Atlanta Federal Center 61 Forsyth St., SW, Suite 23T85 Atlanta, Georgia 30303 ATTN: George A. Wilson U.S. Nuclear Regulatory Commission OWFN 9 E3 Washington, DC 20555-0001

ENCLOSURE Watts Bar Nuclear Plant Dam Safety Inspection Report E-I

Dam Safety Inspection Report - Class A File Number: 91-00 Watts Bar Hydro Plant EDMS Number: J22 080807 001 Special, Nuclear Yard Drainage Holding Pond UNID: WBH-00-INSP-333 -DAM Report ID: ROOWBHCLA082008 Date of Inspection: 07/18/08 Headwater: N/A Tailwater: N/A Inspection

Participants:

Dam Safety: Scott Kramer, Rusty Tompkins WBN Nuclear: Darrin Hutchison, Environmental Tech Support Manager Features Inspected:

Yard Drainage Holding Pond Spillway Dam Attachments to this Inspection Memorandum:

Exhibit 1: Recommendations Exhibit 2: Inspection Procedure, Checklist, Observations Exhibit 3: Photographs Exhibit 4: Drawing 10N225, 10N226, 10W227, 17W303-2 Summary:

A yard drainage holding pond is located at Watts Bar Nuclear plant, which is included in the National Inventory of Dams (NID). The size of the reservoir is such that an embankment dam located at the Southwest corner of the holding pond meets the definition of a dam per the Federal Guidelines for Dam Safety; therefore Dam Safety inspections of this dam are required. This was the first such inspection performed at this facility.

The dam is in satisfactory condition and only some minor maintenance is recommended in Exhibit 1.

Oriqinal signed by Scott Kramer, PE

.Principal Dam Safety Inspection Engineer Original signed by Lynn Petty, PE Manager, Civil Engineering Distribution: Senior Manager, RO Support Services, Gene Gibson; Senior Manager, River Scheduling, Charles Bach, Carol Eimers; Manager, Dam Safety, Russell Tompkins; Manager, Civil Engineering, Lynn Petty; WBN Nuclear, Darrin Hutchison; Facilities Management, Darrel Reed; Dam Safety, Kim Barrett; Chattanooga Dam Safety Files (Hard Copy), BSL (Diana Miles)

E-2

Exhibit 1, Recommendations Watts Bar Hydro Plant Special, Nuclear Yard Drainage Holding Pond Maintenance & Repair Items to be Handled by Other Orqanizations:

1. PM - Remove the trees located-on'the.upstream anddownstream sideof the small embankment dam and spillway. Include all trees within 20' of the toe and groin areas.

Responsible Organization: Facilities Maintenance, Darrel Reed Estimated Cost:

$4,000.00 Estimated Completion Date: 3/30/09

2.

PM - Fill the small hole that is undermining the left side of the spillway slab just downstream from the crest of the dam with small 1/2" washed stone.

Responsible Organization: Facilities Maintenance, Darrel Reed Estimated Cost:

$500.00 Estimated Completion Date: 3/30/09 Maintenance & Repair Items:

None Pending Projects:

None Follow-up Tasks:

None Exhibit 1, Page 1 E-3

Exhibit 2, Inspection Procedure and Checklist Watts Bar Hydro Plant Special, Nuclear Yard Drainage Holding Pond

1. Inspection Procedure:

1.1. See procedure:..\\..\\Inspection Procedures, Civil\\lP2.0 General, Intermediate Civil Inspections.doc 1.2. Equipment Requirements: PPE, Camera

2. Inspection Checklist:

2.1. Holding Pond Embankment Dam (Including Abutment):

2.1.1.Upstream Face:

2.1.1.1. Slope Protection 2.1.1.2. Erosion 2.1.1.3. Sinkholes, Depressions 2.1.1.4. Vegetation 2.1.1.5. Low Level Outlet Structure 2.1.2. Downstream Face (Including Abutment):

2.1.2.1. Slope Protection 2.1.2.2. Erosion 2.1.2.3. Sinkholes, Depressions 2.1.2.4: Vegetation 2.1.2.5. Seeps 2.2. Spillway Section:

2.2.1iCrest and Downstream Face:

2.2.1.1. Surface Condition of concrete 2.2.1.2. Cracks/ Spalls 2.2.1.3. Block Movement at Joints 2.2.1.4. Leakage 2.2.1.5. Erosion 2.2.1.6. Undermined Holes along Edges Exhibit 2, Page 1 E-4

Exhibit 2, Inspection Procedure and Checklist Watts Bar Hydro Plant Special, Nuclear Yard Drainage Holding Pond

3.

Inspection Observations:

A small yard holding pond of 190 acre-feet is located on the south side of the Watts Bar Nuclear plant, which collects discharge water from the cooling towers during periods of high river water temperatures. A small embankmentdam with a concrete overflow spillway is located at the southwest side of the pond. For an overall plan view of the-pond and dam, see the attached drawing 10N225. Details of he embankment dam and spillway can be found on drawing 10N226. Since the size of the reservoir is larger than the 50 acre-feet, this dam meets the definition of a dam per the Federal Guidelines for Dam Safety and Dam Safety inspections are required. This dam is classified as a low hazard.

An embankment crosses over the pond in front of the embankment dam, which creates a small pond in front of the actual dam. There are (5) 24" diameter pipes and (1) 24" pipe that directly connects the larger pond with the smaller pond, which acts as a skimmer between the main pond and the smaller pond. Details for the skimmer embankment are located on drawing 1OW227. This particular feature is not considered as a dam.

An additional embankment separates another small pond at the northwest end of the main pond. A pipe allows water to flow from the smaller pond to the larger pond, therefore this embankment is also not considered as a dam.

Two small aluminum sludge settling ponds are located on the north side of the main yard pond, but these are too small to be considered as dams.

Also see procedure:..\\.\\nspection Procedures, Civil\\IP1.5 Civil Post Inspection Activities.doc 3.1. Embankment Dam:

The embankment dam is estimated at 350' long and 19' high above natural ground elevation. A 25' wide uncontrolled concrete overflow spillway is located in the center section.

An inlet structure is located on the upstream left side of the embankment dam, from which a 48" diameter pipe is routed in the direction of the Tennessee River. This pipe tees into a 72" pipe that runs from the cooling towers downstream to an outlet structure on the river.

The embankment dam is in satisfactory condition. Numerous trees will require removal per Dam Safety requirements. See Exhibit 1 for recommendations.

3.2. Spillway Section:

The spillway section is in satisfactory condition. A small undermined area is located on the left side of the spillway slab, which allows water to flow underneath the slab. This hole should be filled with small 1/2" stone. See Exhibit 1 for recommendations.

Exhibit 2, Page 2 E-5

Exhibit 3, Inspection Photographs Watts Bar Hydro Plant Special, Nuclear Yard Drainage Holding Pond Fgurel1 View of main yard holding pond looking eastward towards the cooling towers.

Figure 2 View of main holding pond taken from same spot at Figure 1, looking towards the Southeast.

i? View of main holding pond looking towards the northwest and at the location of the photo taken in Figure 2.

Exhibit 3, Page 1 E-6

Exhibit 3, Inspection Photographs Watts Bar Hydro Plant Special, Nuclear Yard Drainage Holding Pond Figure 4:

'View of upstream side of dam with the concrete spillway. Note numerous trees that will need to be removed.

Figure 5:

View of crest of dam and upstream edge of concrete spillway. A weir for measuring flow is located on the upstream end of the spillway.

Figure 6:

View of downstream slope of dam, with concrete spillway slab. Note trees located along the toe which will require removal.

Exhibit 3, Page 2 E-7

Exhibit 3, Inspection Photographs Watts Bar Hydro Plant Special, Nuclear Yard Drainage Holding Pond Figure 7:

View of concrete spillway slab on downstream slope.

Figure 8:

View of a small hole that has undermined the concrete spillway slab.

Figure 9:

View of small whirlpool above inlet structure for 48" outlet pipe.

Exhibit 3, Page 3 E-8

I 51/OJMAAl' OF QUJANTlTIE l5 "2"f2 9

2~p Ol i

/

.4/ft IiiI

  • -4z

~pio0\\

C~olwtorPm ~ao

~

cm

  • ,,r*

,4 II ~t$ *tD/1*7*

  • NT r O~t corcr

/***

f <"7-._

""iv

~

iS~it 000 84 A1Ai0ijy (1

iOu, i~~I "Li e

0*,

wI A/ISA, StE 225/ti iO

-iwo I

01011400

ý,:

r-M, IT

I 92zNOI IT i'lUl

.i¢/

-0U

/

SC-I

.,-p " F........

I

-=t

-2 i

~....

___________'0-'

F (1.7.00 LP*- P*4 3.

c7-c

  • 33

/XTr4IL C 5.430.10,Al I

I3/

11 -111 A rt*

  • r*

I Jý 11 H-P7 (cP DETAIL p-p 0A

.m Lil

- _7

.J!i~

tI

'NiP) CU ALLC4i' 03431370030 NC P70133.0 C'7.tAi3 LOA'.

LLAL8

~ 0-y/L'03'LWP)7/

011A PLL ACO. 2LP P0T,

-A53PLLC BtAACL f, 7PPL'O 1-M.

f,0/ ZZ,00ACA

0.

iC)'43 L

7-33C'CM4LP3ilP.3,LOA0iP30 c

3oC iCJP0040 irC h!P "AL-P A-A 0

'F OfrAIL A A'PN'3iL 8

,--,)

4 hi 0040 PVAA'OVC 033'..VICA3PA3',.Ne~VPrLcAL 070

'0 Li'.:.,'303L.. 047044 CAL.

o

~..L'.P..OP'0PPAAiLCi'PPC3PVL7A7APeP hA!'. COP, P7/P $..04L 0VP43ASLPO L.A

~P'APL 3"OPLP30A3"PYLA/

33373030 303A3A0 YARD YARD DRAINAGE HOLDING POND SHEET 2 WATTS BAR NUCLEAR PLANT TENNESSEE VALLEY AUJT7RITY

.....- Z..... 51s C I ION22&.,

IL J-.I.

Jl--iL POACALOL OLA/APN 10430.229.

i

-A-'.

IN

~

I

J

/~

8-8 C' -~

C'.

'~0'TLCC~~'

4

  • L'L"~~ C~L8

.LLL"oCL

~tLtC.CM T

A-A

/ I

/

/

/

I w

I I..

I>

7j J

l SA/0C000/'tO~CaDL/0C0w,.:/SICr/*GCC CCC

-. ~~

0CtC----

YARD YARD DRAkAGE Fi-LOING PCtD SKUER OTAIL-SHEET 3 WATTS BAR MJCL-AR PLANT

Ils

~*

as~i;'~?

I s~~flt A et ntErA Fe a tMEF.O e.sEA£rnAM cone tone9

-0a0t 83 1R)0A

ý775_Drr~t D~r~x G

ILI'aOmiB AB lST,£2,fe o

UNrT I ONLY one~r-Ato~,-,COOLING TOWER UNITS I A 2

-o~rPA l(Or

ý rEAiL RdMECHANICAL

&UU A2A

.e~B<.eA1COOLING TOWERS&

IU

'~ ~flm, 50 X iS

=1oa

  • -.4, WASTE DISQ-I PIPING & VALVES

'ho-t~'~

0WATTS BAR NUCLEAR PLANT I

ENNESSEE11 VAUE MJI A=RTy DE MAI ~

OT£c 00000 0-3 At MAMO S~tB ACoj~

M ~AM~e

~

ff#5tos Z

-J.

-~AS CONSTRUCTED