ML082700318
| ML082700318 | |
| Person / Time | |
|---|---|
| Site: | Seabrook |
| Issue date: | 09/26/2008 |
| From: | Hansell S Operations Branch I |
| To: | St.Pierre G Florida Power & Light Energy Seabrook |
| Shared Package | |
| ML081610632 | List: |
| References | |
| Download: ML082700318 (5) | |
Text
September 26, 2008 Mr. Gene St. Pierre Site Vice President FPL Energy Seabrook, LLC Seabrook Station PO Box 300 Seabrook, NH 03874
SUBJECT:
REQUALIFICATION PROGRAM INSPECTION - (SEABROOK STATION)
Dear Mr. St. Pierre:
In a telephone conversation on April 24, 2008, Mr. Ed Spader, Supervisor LLR Training Requalification, and Mr. Gil Johnson, Operations Engineer, made arrangements for the U. S.
Nuclear Regulatory Commission (NRC) to inspect the licensed operator requalification program at the Seabrook facility. The inspection is planned for the week of December 1, 2008, which coincides with your regularly scheduled requalification examination cycle. The staff at your facility should prepare and conduct the requalification examinations in accordance with your NRC-approved requalification program.
In accordance with 10 CFR 55.59(c), the NRC may request facility licensees to submit their biennial comprehensive requalification written examinations or annual operating tests as necessary to support the NRC's inspection program needs. In order for the NRC to adequately prepare for this inspection, please furnish: 1) an index or summary of condition reports written in the past two years in which licensed operator errors were determined to be the root or contributing cause; 2) an index or summary of condition reports written in the past two years on simulator performance problems; 3) an index or summary of simulator performance test results in the past two years; and 4) the examination schedule, sample plan, written examinations and operating test scheduled for the week of the inspection to the NRC by November 17, 2008. Mr.
Spader has been advised of this request and provided with the name and address of the NRC lead inspector assigned to this inspection.
This letter contains information collections that are subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). These information collections were approved by the Office of Management and Budget, approval number 3150-0018, which expires on June 30, 2009.
The public reporting burden for this collection of information is estimated to average 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> per response, including the time for reviewing instructions, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of these information collections, including suggestions for reducing the burden, to the Records and FOIA/Privacy Services Branch (T-5 F52), U.S.
Nuclear Regulatory Commission, Washington, D.C. 20555-0001, or by Internet electronic mail to INFOCOLLECTS@NRC.GOV; and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-0018), Office of Management and Budget, Washington, D.C.
20503.
G. St. Pierre 2
The NRC may not conduct or sponsor, and a person is not required to respond to, a collection of information unless it displays a currently valid OMB control number.
In accordance with 10 CFR 2.390 of the NRC=s ARules of Practice,@ a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of the NRC=s document system (ADAMS).
ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (The Public Electronic Reading Room).
Thank you for your cooperation in this matter. If you have any questions regarding this inspection, please contact Peter Presby at (610) 337-5392.
Sincerely,
/RA/
Samuel L. Hansell, Jr., Chief Operations Branch Division of Reactor Safety Docket No.
50-443 License No.
G. St. Pierre 2
The NRC may not conduct or sponsor, and a person is not required to respond to, a collection of information unless it displays a currently valid OMB control number.
In accordance with 10 CFR 2.390 of the NRC=s ARules of Practice,@ a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of the NRC=s document system (ADAMS).
ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (The Public Electronic Reading Room).
Thank you for your cooperation in this matter. If you have any questions regarding this inspection, please contact Peter Presby at (610) 337-5392.
Sincerely,
/RA/
Samuel L. Hansell, Jr., Chief Operations Branch Division of Reactor Safety Docket No.
50-443 License No.
NPF-86 SUNSI Review Complete: JC (Reviewer=s Initials)
ADAMS PKG: ML081610632 ADAMS ACC#ML082700318 DOCUMENT NAME: g:\\drs\\operations branch\\johnson\\requal fy09 SB Dec08\\60dayrpi.doc After declaring this document AAn Official Agency Record@ it will be released to the Public.
To receive a copy of this document, indicate in the box: "C" = Copy without attachment/enclosure "E" = Copy with attachment/enclosure "N" = No copy OFFICE RI/DRS/OB DI/DRS/OB RI/DRS/OB NAME CBixler/DS/CB GJohnson/JC for SHansell/SLH DATE 09/25/08 09/25/08 09/26/08 OFFICE NAME DATE OFFICIAL RECORD COPY
G. St. Pierre 3
cc w/encl:
J. A. Stall, FPL Senior Vice President, Nuclear & CNO M. Warner, Vice President, Nuclear Operations R. S. Kundalkar, FPL Vice President, Nuclear Technical Svcs M. Mashhadi, Senior Attorney, Florida Power & Light Company M. S. Ross, Managing Attorney, Florida Power & Light Company M. OKeefe, Manager, Regulatory Programs P. Freeman, Plant General Manager K. Wright, Manager, Nuclear Training, Seabrook Station S. Porell, FEMA, Region I Office of the Attorney General, Commonwealth of Mass K. Ayotte, Attorney General, State of NH O. Fitch, Deputy Attorney General, State of NH P. Brann, Assistant Attorney General, State of Maine R. Walker, Director, Radiation Control Program, Dept. of Public Health, Commonwealth of MA C. Pope, Director, Homeland Security & Emergency Management, State of NH J. Giarrusso, MEMA, Commonwealth of Mass D. O'Dowd, Administrator, Radiological Health Section, DPHS, DHHS, State of NH J. Roy, Director of Operations, Massachusetts Municipal Wholesale Electric Company T. Crimmins, Polestar Applied Technology R. Backus, Esquire, Backus, Meyer and Solomon, NH Town of Exeter, State of New Hampshire Board of Selectmen, Town of Amesbury S. Comley, Executive Director, We the People of the United States R. Shadis, New England Coalition Staff M. Metcalf, Seacoast Anti-Pollution League
G. St. Pierre 4
Distribution:
S. Collins, RA M. Dapas, DRA M. Gamberoni, DRS D. Roberts, DRS G. Johnson, DRS Examiner, DRS S. Hansell, DRS L. Vick, NRR/ADRO/DIRS/IOLB D. Lew, DRP J. Clifford, DRP A. Burritt, DRP L. Cline, DRP J. Bream, DRP W. Raymond, DRP, Sr. Resident Inspector J. Johnson, DRP, Resident Inspector E. Jacobs, DRP, Resident OA S. Williams, RI OEDO Distribution:
DRS Master Exam File (C. Bixler) (w/concurrences)
DRS File