September 25, 2008 Mr. David A. Christian President and Chief Nuclear Officer Dominion Energy Kewaunee, Inc.
Innsbrook Technical Center - 2SW 5000 Dominion Blvd Glen Allen, VA 23060-6711
SUBJECT:
DETERMINATION OF ACCEPTABILITY AND SUFFICIENCY FOR DOCKETING, PROPOSED REVIEW SCHEDULE, AND OPPORTUNITY FOR A HEARING REGARDING THE APPLICATION FROM DOMINION ENERGY KEWAUNEE, INC., FOR RENEWAL OF THE OPERATING LICENSE FOR THE KEWAUNEE POWER STATION
Dear Mr. Christian:
By letter dated August 14, 2008, the U.S. Nuclear Regulatory Commission (NRC) received the Dominion Energy Kewaunee, Inc.'s application for renewal of operating license DPR-43 for the Kewaunee Power Station (KPS). Notice of receipt of this application was published in the Federal Register on August 29, 2008 (73 FRN 51023). The purpose of this letter is to provide the results of the NRC staff's acceptance review of the license renewal application for KPS. The acceptance review determines whether the application contains sufficient information to allow the NRC staff to proceed with the safety and environmental review.
The NRC staff has reviewed your application following the guidance in NUREG-1800, Revision 1, Standard Review Plan for Review of License Renewal Applications for Nuclear Power Plants, and NUREG-1555, Standard Review Plans for Environmental Reviews for Nuclear Power Plants. As a result, the NRC staff has determined that the application is sufficiently complete and acceptable for docketing, in accordance with Title 10 of the Code of Federal Regulations (CFR) Sections 2.101, 54.19, 54.21, 54.22, 54.23, 51.45, and 51.53(c). However, the staffs determination does not preclude requests for additional information (RAIs) as the review proceeds.
This letter forwards the NRC staffs safety and environmental review schedule for the KPS application (Enclosure 1). The NRC staff will follow established review procedures and the enclosed schedule to complete the reviews required by 10 CFR Parts 54 and 51. This schedule has been established in accordance with a 30-month review plan, which includes time to conduct a hearing, should a hearing be requested and granted. Milestones for hearing activities are not included in the enclosed schedule because these dates are established by the Commission or the Atomic Safety and Licensing Board.
We would like to emphasize that the review of your LRA will be very detailed and thorough. The NRC staff will make every effort to meet the scheduled milestones; thus, your responses to the staff's RAIs, if needed, must be complete and provided in a timely manner. We request that you inform the NRC staff as early as possible should potential delays arise in your support of the schedule.
D. Christian Finally, we have also enclosed a copy of the notice related to your application that is being sent to the Office of the Federal Register for publication (Enclosure 2). This notice announces the opportunity to request a hearing and to file a petition for leave to intervene.
If you have any questions on this matter, please contact Mr. John Daily, Project Manager for the review of the KPS license renewal application, by telephone at 301-415-3873 or via e-mail at John.Daily@NRC.Gov.
Sincerely,
/RA/
Brian E. Holian, Director Division of License Renewal Office of Nuclear Reactor Regulation Docket No. 50-305
Enclosures:
- 1. Review Schedule
- 2. Federal Register Notice cc w/encls: See next page
D. Christian Finally, we have also enclosed a copy of the notice related to your application that is being sent to the Office of the Federal Register for publication (Enclosure 2). This notice announces the opportunity to request a hearing and to file a petition for leave to intervene.
If you have any questions on this matter, please contact Mr. John Daily, Project Manager for the review of the KPS license renewal application, by telephone at 301-415-3873 or via e-mail at John.Daily@NRC.Gov.
Sincerely,
/RA/
Brian E. Holian, Director Division of License Renewal Office of Nuclear Reactor Regulation Docket No. 50-305
Enclosures:
- 1. Review Schedule
- 2. Federal Register Notice cc w/encls: See next page DISTRIBUTION: See next page ADAMS ACCESSION #
ML082610316 (package), ML082610303 (FRN), ML082610294 (letter)
OFFICE LA:DLR PM:RPB1:DLR OGC (NLO)
NAME YEdmonds JDaily SUttal w/changes DATE 9/25/08 9/22/08 9/5/08 OFFICE EPM:RPB1:DLR D:DLR NAME SLopas BHolian DATE 9/22/08 9/25/08 OFFICIAL RECORD COPY
KEWAUNEE POWER STATION LICENSE RENEWAL APPLICATION REVIEW SCHEDULE Milestone Scheduled Actual Receive license renewal application (LRA) 8/14/08 Publish Federal Register Notice (FRN) - LRA availability 8/26/08 Publish FRN - acceptance/rejection and opportunity for hearing 10/1/08 Publish FRN - intent to conduct environmental scoping 10/8/08 Public Meeting - license renewal overview / environmental scoping meeting 10/22/08 Audit - Scoping & Screening Methodology 10/27/08 Deadline for filing hearing requests and petitions for intervention 12/1/08 Environmental scoping period ends 12/8/08 Audit - Aging Management 12/8/08 Audit - Environmental 1/12/09 Issue draft Supplemental Environmental Impact Statement (SEIS) 8/17/09 Publish FRN - draft SEIS available for comments 8/21/09 Issue Safety Evaluation Report (SER) with open items 9/16/09 Public Meeting - draft SEIS meeting 9/23/09 End of draft SEIS comment period 11/4/09 Advisory Committee on Reactor Safeguards (ACRS) Subcommittee meeting 11/4/09 Issue final SER 2/12/10 Issue final SEIS 2/12/10 U.S. EPA FRN Published - availability of final SEIS 2/19/10 ACRS full committee meeting 4/8/10 Decision - Director NRR (22 months if no hearing) 6/15/10 Commission decision (30 months if hearing) 2/14/11 ENCLOSURE 1
Letter to Dominion from B. Holian dated September 25, 2008
SUBJECT:
DETERMINATION OF ACCEPTABILITY AND SUFFICIENCY FOR DOCKETING, PROPOSED REVIEW SCHEDULE, AND OPPORTUNITY FOR A HEARING REGARDING THE APPLICATION FROM DOMINION ENERGY KEWAUNEE, INC., FOR RENEWAL OF THE OPERATING LICENSE FOR THE KEWAUNEE POWER STATION DISTRIBUTION:
PUBLIC B. Holian / S. Lee (RidsNrrDlr)
T. Combs, OCA T. Madden, OCA R. Shane, OCA B. Keeling, OCA D. Pelton (RidsNrrDlrRpb1)
B. Pham (RidsNrrDlrRerb)
OPA (RidsOpaMail)
OGC (RidsOGCMailRoom)
J. Daily S. Lopas P. Tam M. Kunowski S. Burton P. Higgins D. McIntyre, OPA V. Mitlyng S. Uttal, OGC
Kewaunee Power Station cc:
Resident Inspectors Office U.S. Nuclear Regulatory Commission N490 Hwy 42 Kewaunee, WI 54216-9510 Mr. Chris L. Funderburk Director, Nuclear Licensing and Operations Support Dominion Resources Services, Inc.
Innsbrook Technical Center - 2SE 5000 Dominion Boulevard Glen Allen, VA 23060-6711 Mr. Thomas L. Breene Dominon Energy Kewaunee, Inc.
Kewaunee Power Station N490 Highway 42 Kewaunee, WI 54216 Mr. Michael J. Wilson, Director Nuclear Safety & Licensing Dominion Energy Kewaunee, Inc.
Kewaunee Power Station N490 Highway 42 Kewaunee, WI 54216 Mr. William R. Matthews Senior Vice President - Nuclear Operations Innsbrook Technical Center - 2SE 5000 Dominion Boulevard Glen Allen, VA 23060-6711 Mr. Alan J. Price Vice President - Nuclear Engineering Innsbrook Technical Center - 2SE 5000 Dominion Boulevard Glen Allen, VA 23060-6711 Mr. William D. Corbin Director - Nuclear Engineering Innsbrook Technical Center - 3NE 5000 Dominion Boulevard Glen Allen, VA 23060-6711 Mr. Paul C. Aitken Supervisor - License Renewal Project Innsbrook Technical Center - 3NE 5000 Dominion Boulevard Glen Allen, VA 23060-6711 Mr. David A. Sommers Supervisor - Nuclear Engineering Innsbrook Technical Center - 2SE 5000 Dominion Boulevard Glen Allen, VA 23060-6711 Ms. Lillian M. Cuoco, Esq.
Senior Counsel Dominion Resources Services, Inc.
120 Tredegar Street Riverside 2 Richmond, VA 23219 Mr. Stephen E. Scace Site Vice President Dominion Energy Kewaunee, Inc.
Kewaunee Power Station N490 Highway 42 Kewaunee, WI 54216 Mr. David R. Lewis Pillsbury Winthrop Shaw Pittman, LLP 2300 N Street, N.W.
Washington, DC 20037-1122 Mr. Ken Paplham E 4095 Sandy Bay Rd.
Kewaunee, WI 54216 Mr. Richard Gallagher Senior Scientist, License Renewal Dominion Resources Services, Inc.
Route 156, Rope Ferry Road Waterford, CT 06385