ML082550692

From kanterella
Jump to navigation Jump to search

Acceptance Review of Request for Relief VRR - ANO 2-2008 -1
ML082550692
Person / Time
Site: Arkansas Nuclear  Entergy icon.png
Issue date: 09/11/2008
From: Wang A
Plant Licensing Branch IV
To: David Bice, James D
Entergy Operations
Wang, A B, NRR/DORL/LPLIV, 415-1445
References
TAC MD9503
Download: ML082550692 (1)


Text

From: Alan Wang Sent: Thursday, September 11, 2008 9:21 AM To: Dale James; David Bice

Subject:

Acceptance Review of Request for Relief VRR-ANO2-2008-1 (MD9503)

ADAMSAccessionNumber: ml082550672 Dale and Dave, By letter dated August 21, 2008, Entergy Operations, Inc. (Entergy), proposed an alternative for the Inservice Testing Program. The proposed alternative is requested when using the requirements of ASME/ANSI OMa-1988, Part 10 (OM-10), pertaining to the frequency of the leak rate test for two service water boundary isolation valves at Arkansas Nuclear One, Unit 2 (ANO-2). OM-10, Section 4.2.2.3(a) requires that Category A valves, which perform a function other than containment isolation, shall be seat leakage tested to verify their leak-tight integrity and that the tests shall be conducted at least once every 2 years. The purpose of this letter is to provide the results of the U.S. Nuclear Regulatory Commission (NRC) staffs acceptance review of this relief request. The acceptance review was performed to determine if there is sufficient technical information in scope and depth to allow the NRC staff to complete its detailed technical review. The acceptance review is also intended to identify whether the application has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plant.

Pursuant to Sections 50.55a(a)(3)(i) and 50.55a(a)(3)(ii) of Title 10 of the Code of Federal Regulations (10 CFR), the applicant shall demonstrate that the proposed alternatives would provide an acceptable level of quality and safety, or that compliance with the specified requirements of Section 50.55a would result in hardship or unusual difficulty without a compensating increase in the level of quality or safety.

The NRC staff has reviewed your application and concluded that it does provide technical information in sufficient detail to enable the staff to proceed with its detailed technical review and make an independent assessment regarding the acceptability of the proposed amendment in terms of regulatory requirements and the protection of public health and safety and the environment. If additional information is needed for the staff to complete its technical review, you will be advised by separate correspondence.

If you have any questions, please contact me at (301) 415-1445.

Alan B. Wang, Project Manager Plant Licensing Branch IV Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation E-mail Properties

Mail Envelope Properties (419623E8C7444444BF132DA3AE69EDA2105EA954AD)

Subject:

Acceptance Review of Request for Relief VRR-ANO2-2008-1 (MD9503)

Sent Date: 9/11/2008 9:20:38 AM Received Date: 9/11/2008 9:20:00 AM From: Alan Wang Created By: Alan.Wang@nrc.gov Recipients:

DJAMES@entergy.com (Dale James)

Tracking Status: None DBICE@entergy.com (David Bice)

Tracking Status: None Post Office:

HQCLSTR02.nrc.gov Files Size Date & Time MESSAGE 9364 9/11/2008 Options Expiration Date:

Priority: olImportanceNormal ReplyRequested: False Return Notification: False Sensitivity: olNormal Recipients received: