ML082460674

From kanterella
Jump to navigation Jump to search
Inspection/Activity Plan for 09/02/2008 - 12/31/2009
ML082460674
Person / Time
Site: North Anna  
Issue date: 09/02/2008
From:
NRC/RGN-II/DRP/RPB5
To:
References
Download: ML082460674 (2)


Text

North Anna Inspection / Activity Plan 09/02/2008 - 12/31/2009 Inspection Type Inspection Activity Planned Dates Start End No. of Staff on Site Title Unit Number Page 1 of 2 09/02/2008 09:22:36 Report 22 2

PSB1-RP

- RADIATION PROTECTION OCCUPATIONAL WK1 Baseline Inspections Access Control to Radiologically Significant Areas 09/15/2008 09/19/2008 1, 2 7112101 IP Baseline Inspections ALARA Planning and Controls 09/15/2008 09/19/2008 1, 2 7112102 IP Baseline Inspections Radioactive Material Processing and Transportation 09/15/2008 09/19/2008 1, 2 7112202 IP Baseline Inspections Occupational Exposure Control Effectiveness 09/15/2008 09/19/2008 1, 2 71151-OR01 IP Baseline Inspections RETS/ODCM Radiological Effluent 09/15/2008 09/19/2008 1

71151-PR01 IP 2

EB3-ISI

- UNIT 2 INSERVICE INSPECTION Baseline Inspections Inservice Inspection Activities - PWR 09/22/2008 09/26/2008 2

7111108P IP 2

PSB1-RP

- RADIATION PROTECTION OCCUPATIONAL WK2 Baseline Inspections Access Control to Radiologically Significant Areas 09/29/2008 10/03/2008 1, 2 7112101 IP Baseline Inspections ALARA Planning and Controls 09/29/2008 10/03/2008 1, 2 7112102 IP Baseline Inspections Radioactive Material Processing and Transportation 09/29/2008 10/03/2008 1, 2 7112202 IP Baseline Inspections Occupational Exposure Control Effectiveness 09/29/2008 10/03/2008 1, 2 71151-OR01 IP Baseline Inspections RETS/ODCM Radiological Effluent 09/29/2008 10/03/2008 2

71151-PR01 IP 1

EB3TI172

- TI-172 Generic Safety Inspection Reactor Coolant System Dissimiliar Metal Butt Welds 12/08/2008 12/12/2008 1, 2 2515/172 IP 3

TI-171

- B.5.B PHASE 2&3 Generic Safety Inspection Verification of Site Specific Implementation Of B.5.b Phase 2 & 3 Mitigating Strategies 12/08/2008 12/12/2008 1, 2 2515/171 IP 5

PI&R

- PROBLEM IDENTIFICATION AND RESOLUTION Baseline Inspections Identification and Resolution of Problems 01/12/2009 01/16/2009 1

71152B IP Baseline Inspections Identification and Resolution of Problems 02/02/2009 02/06/2009 1

71152B IP 2

EB3ISI

- UNIT 1 INSERVICE INSPECTION Baseline Inspections Inservice Inspection Activities - PWR 03/16/2009 03/20/2009 1

7111108P IP 2

EB3TI172

- TI-172 RCS DM BUTT WELD Generic Safety Inspection Reactor Coolant System Dissimiliar Metal Butt Welds 03/16/2009 03/20/2009 1

2515/172 IP 1

EB3SGISI

- UNIT 1 STEAM GENERATOR INSERVICE INSP Baseline Inspections Inservice Inspection Activities - PWR 03/23/2009 03/27/2009 1

7111108P IP 1

PSB1-RP

- TI2515/173 AND ISFSI Generic Safety Inspection Review of the Implementation of the Industry Ground Water Protection Voluntary Initiative 05/25/2009 05/29/2009 1, 2 2515/173 IP Other Routine Operation of an Independent Spent Fuel Storage Installation at Operating Plants 05/25/2009 05/29/2009 1, 2 60855.1 IP 3

PSB1-RP

- RADIATION PROTECTION PUBLIC BASELINE Baseline Inspections Radiation Monitoring Instrumentation and Protective Equipment 06/22/2009 06/26/2009 1, 2 7112103 IP Baseline Inspections Radioactive Gaseous and Liquid Effluent Treatment and Monitoring Systems 06/22/2009 06/26/2009 1, 2 7112201 IP Baseline Inspections Radiological Environmental Monitoring Program (REMP) And Radioactive Material Control Program 06/22/2009 06/26/2009 1, 2 7112203 IP Baseline Inspections Occupational Exposure Control Effectiveness 06/22/2009 06/26/2009 1, 2 71151-OR01 IP This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.

North Anna Inspection / Activity Plan 09/02/2008 - 12/31/2009 Inspection Type Inspection Activity Planned Dates Start End No. of Staff on Site Title Unit Number Page 2 of 2 09/02/2008 09:22:36 Report 22 3

PSB1-RP

- RADIATION PROTECTION PUBLIC BASELINE Baseline Inspections RETS/ODCM Radiological Effluent 06/22/2009 06/26/2009 1, 2 71151-PR01 IP 1

PSB1EP

- EMERGENCY PREPAREDNESS INSPECTION Baseline Inspections Emergency Response Organization, Drill/Exercise Performance Indicator, Program Review 07/06/2009 07/10/2009 1, 2 2515/175 IP EP Baseline Inspection Alert and Notification System Testing 07/06/2009 07/10/2009 1, 2 7111402 IP EP Baseline Inspection Emergency Response Organization Augmentation Testing 07/06/2009 07/10/2009 1, 2 7111403 IP EP Baseline Inspection Emergency Action Level and Emergency Plan Changes 07/06/2009 07/10/2009 1, 2 7111404 IP EP Baseline Inspection Correction of Emergency Preparedness Weaknesses and Deficiencies 07/06/2009 07/10/2009 1, 2 7111405 IP Baseline Inspections Performance Indicator Verification 07/06/2009 07/10/2009 1, 2 71151 IP 5

TFPI

- TRIENNIEL FIRE PROTECTION INSPECTION Baseline Inspections Fire Protection [Triennial]

08/03/2009 08/07/2009 1, 2 7111105T IP Baseline Inspections Fire Protection [Triennial]

08/17/2009 08/21/2009 1, 2 7111105T IP 6

EB1-CDBI

- COMPONENT DESIGN BASIS INSPECTION Baseline Inspections Component Design Bases Inspection 10/19/2009 10/23/2009 1, 2 7111121 IP Baseline Inspections Component Design Bases Inspection 11/02/2009 11/06/2009 1, 2 7111121 IP Baseline Inspections Component Design Bases Inspection 11/16/2009 11/20/2009 1, 2 7111121 IP Baseline Inspections Component Design Bases Inspection 12/07/2009 12/11/2009 1, 2 7111121 IP This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.