ML082460346

From kanterella
Jump to navigation Jump to search
9/2/08 D. C. Cook - Mid-cycle Performance Review and Inspection Plan - Units 1 & 2
ML082460346
Person / Time
Site: Cook  American Electric Power icon.png
Issue date: 09/02/2008
From: Ross Telson
Reactor Projects Region 3 Branch 4
To: Rencheck M
Indiana Michigan Power Co
References
Download: ML082460346 (6)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION III 2443 WARRENVILLE ROAD, SUITE 210 LISLE, IL 60532-4352 September 2, 2008 Mr. Michael W. Rencheck Senior Vice President and Chief Nuclear Officer Indiana Michigan Power Company Nuclear Generation Group One Cook Place Bridgman, MI 49106

SUBJECT:

MID-CYCLE PERFORMANCE REVIEW AND INSPECTION PLAN -

D. C. COOK NUCLEAR POWER PLANT, UNITS 1 AND 2

Dear Mr. Rencheck:

On August 14, 2008, the NRC staff completed its performance review of D.C. Cook Nuclear Power Plant, Units 1 and 2 for the first half of the calendar year 2008 assessment cycle. Our technical staff reviewed performance indicators (PIs) for the most recent quarter and inspection results over the previous 12 months. The purpose of this letter is to inform you of our assessment of your safety performance during this period and our plans for future inspections at your facility.

This performance review and enclosed inspection plan do not include security information. A separate letter designated and marked as "Official Use Only - Security Related Information" will include the security cornerstone review and resultant inspection plan.

Plant performance for the most recent quarter at D.C. Cook Nuclear Power Plant, Units 1 and 2 was within the Licensee Response column of the NRC=s Action Matrix, based on all inspection findings being classified as having very low safety significance (Green) and all PIs indicating performance at a level requiring no additional NRC oversight (Green). Therefore, we plan to conduct reactor oversight process (ROP) baseline inspections at your facility.

The enclosed inspection plan details the inspections, less those related to physical protection scheduled through December 31, 2009. The inspection schedule includes a fire protection inspection in the late August/early September 2009 time frame The inspection plan is provided to allow for the resolution of any scheduling conflicts and personnel availability issues well in advance of inspector arrival onsite. Routine resident inspections are not listed due to their ongoing and continuous nature. The inspections in the last nine months of the inspection plan are tentative and may be revised at the end-of-cycle review.

M. Rencheck In accordance with 10 CFR 2.390 of the NRC=s ARules of Practice,@ a copy of this letter and its enclosure will be made available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

If circumstances arise which cause us to change this inspection plan, we will contact you to discuss the change as soon as possible. Please contact me at 630-829-9619 with any questions you may have regarding this letter or the inspection plan.

Sincerely,

/RA/

Ross Telson, Chief Branch 4 Division of Reactor Projects Docket Nos. 50-315; 50-316 License Nos. DPR-58; DPR-74

Enclosure:

D.C. Cook Inspection/Activity Plan DISTRIBUTION:

See next page

Letter to M. Renchek from R. Telson dated September 2, 2008

SUBJECT:

MID-CYCLE PERFORMANCE REVIEW AND INSPECTION PLAN -

D. C. COOK NUCLEAR POWER PLANT, UNITS 1 AND 2 cc w/encl: L Weber, Site Vice President J. Gebbie, Plant Manager G. White, Michigan Public Service Commission L. Brandon, Michigan Department of Environmental Quality -

Waste and Hazardous Materials Division Emergency Management Division MI Department of State Police T. Strong, Chief, State Liaison Officer, State of Michigan Berrien County Board Chairman Berrien County Coordinator Berrien County Sheriff EMA Coordinator, Berrien County Emergency Management Agency Mayor of Benton Harbor City Manager of Benton Harbor Mayor of St. Joseph City Manager of St. Joseph Mayor of Bridgman City Manager of Bridgman Mayor of Buchanan City Manager of Buchanan President, Village of Stevensville President, Village of Berrien Springs President, Village of Shoreham G. Mortensen, INPO

M. Rencheck In accordance with 10 CFR 2.390 of the NRC=s ARules of Practice,@ a copy of this letter and its enclosure will be made available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

If circumstances arise which cause us to change this inspection plan, we will contact you to discuss the change as soon as possible. Please contact me at 630-829-9619 with any questions you may have regarding this letter or the inspection plan.

Sincerely, Ross Telson, Chief Branch 4 Division of Reactor Projects Docket Nos. 50-315; 50-316 License Nos. DPR-58; DPR-74

Enclosure:

D.C. Cook Inspection/Activity Plan DISTRIBUTION:

See next page DOCUMENT NAME: G:\1-Secy\2008 Mid-cycle final letters\DC Cook MOC Letter.doc Publicly Available Non-Publicly Available Sensitive Non-Sensitive To receive a copy of this document, indicate in the concurrence box: "C" = Copy without attach/encl; "E" = Copy with attach/encl; "N" = No copy OFFICE RIII RIII NAME RLerch:cms RTelson DATE 8/26/08 8/27/08 OFFICIAL RECORD COPY

Letter to M. Renchek from R. Telson dated September 2, 2008

SUBJECT:

MID-CYCLE PERFORMANCE REVIEW AND INSPECTION PLAN -

D. C. COOK NUCLEAR POWER PLANT, UNITS 1 AND 2 DISTRIBUTION:

Terry Beltz Tamara Bloomer RidsNrrDirslpab Resource James Caldwell Mark Satorius Kenneth Obrien Allan Barker DRPIII DRSIII Patricia Buckley Tammy Tomczak ROPreports@nrc.gov (inspection reports, final SDP letters, any letter with an IR number)

D.C. Cook Inspection / Activity Plan 09/01/2008 - 12/31/2009 No. of Staff Planned Dates Inspection nspection Activity Title on Site Start End Type TI - TEMPORARY INSTRUCTION 2515/172 -U2 1 IP 2515/172 Reactor Coolant System Dissimiliar Metal Butt Welds 09/15/2008 09/19/2008 Generic Safety Inspectio BI ENG - ENGINEERING MODIFICATIONS / 50.59 INSP. 3 IP 7111117B Evaluations of Changes, Tests, or Experiments & Permanent Plant Modifications 10/06/2008 10/24/2008 Baseline Inspections BI RP - RADIATION PROTECTION BASELINE INSPECTION 1 IP 7112202 Radioactive Material Processing and Transportation 01/05/2009 01/09/2009 Baseline Inspections IP 71151-BI01 Reactor Coolant System Activity 01/05/2009 01/09/2009 Baseline Inspections IP 71151-OR01 Occupational Exposure Control Effectiveness 01/05/2009 01/09/2009 Baseline Inspections BI ENG - ENGINEERING INSERVICE INSPECTION 2 IP 7111108P Inservice Inspection Activities - PWR 03/23/2009 04/17/2009 Baseline Inspections BI RP - RADIATION PROTECTION BASELINE INSPECTION 1 IP 7112101 Access Control to Radiologically Significant Areas 04/06/2009 04/10/2009 Baseline Inspections IP 7112102 ALARA Planning and Controls 04/06/2009 04/10/2009 Baseline Inspections BI EP - EP EXERCISE INSPECTION / PI VERIFICATION 1 IP 7111401 Exercise Evaluation 06/01/2009 06/05/2009 EP Baseline Inspection IP 71151-EP01 Drill/Exercise Performance 06/01/2009 06/05/2009 Baseline Inspections IP 71151-EP02 ERO Drill Participation 06/01/2009 06/05/2009 Baseline Inspections IP 71151-EP03 Alert & Notification System 06/01/2009 06/05/2009 Baseline Inspections BI RP - RADIATION PROTECTION BASELINE INSPECTION 1 IP 7112203 Radiological Environmental Monitoring Program (REMP) And Radioactive Material Control Program 07/06/2009 07/10/2009 Baseline Inspections IP 71151-PR01 RETS/ODCM Radiological Effluent 07/06/2009 07/10/2009 Baseline Inspections BI RP - RADIATION PROTECTION BASELINE INSPECTION 1 IP 7112201 Radioactive Gaseous and Liquid Effluent Treatment and Monitoring Systems 07/13/2009 07/17/2009 Baseline Inspections BI ENG - TRIENNIAL FIRE PROTECTION INSPECTION 3 IP 7111105T Fire Protection [Triennial] 08/31/2009 09/18/2009 Baseline Inspections BI ENG - TRIENNIAL FIRE PROT. INFO GATHERING TRIP 3 IP 7111105T Fire Protection [Triennial] 08/17/2009 08/21/2009 Baseline Inspections BI ENG - ENGINEERING INSERVICE INSPECTION 2 IP 7111108P Inservice Inspection Activities - PWR 10/19/2009 11/07/2009 Baseline Inspections BI RP - RADIATION PROTECTION BASELINE INSPECTION 1 IP 7112101 Access Control to Radiologically Significant Areas 11/02/2009 11/06/2009 Baseline Inspections IP 7112102 ALARA Planning and Controls 11/02/2009 11/06/2009 Baseline Inspections