UNITED STATES NUCLEAR REGULATORY COMMISSION REGION III 2443 WARRENVILLE ROAD, SUITE 210 LISLE, IL 60532-4352 September 2, 2008 Mr. Jack M. Davis Senior Vice President and Chief Nuclear Officer Detroit Edison Company Fermi 2 - 210 NOC 6400 North Dixie Highway Newport, MI 48166
SUBJECT:
MID-CYCLE PERFORMANCE REVIEW AND INSPECTION PLAN -
FERMI POWER PLANT, UNIT 2
Dear Mr. Davis:
On August 14, 2008, the NRC staff completed its performance review of the Fermi Power Plant, Unit 2, for the first half of the calendar year 2008 assessment cycle. Our technical staff reviewed performance indicators (PIs) for the most recent quarter and inspection results over the previous 12 months. The purpose of this letter is to inform you of our assessment of your safety performance during this period and our plans for future inspections at your facility.
This performance review and enclosed inspection plan do not include security information. A separate letter designated and marked as "Official Use Only - Security Related Information" will include the Security Cornerstone review and resultant inspection plan.
Plant performance for the most recent quarter at Fermi Unit 2 was within the Licensee Response column of the NRC=s Action Matrix, based on all inspection findings being classified as having very low safety significance (Green) and all PIs indicating performance at a level requiring no additional NRC oversight (Green). Therefore, we plan to conduct reactor oversight process (ROP) baseline inspections at your facility.
In our 2007 end-of-cycle assessment letter, dated March 3, 2008, (ADAMS Ref. ML080600499) we advised you of a substantive cross-cutting issue in the area of Human Performance, based on the number of findings with a common cross-cutting aspect of procedural adequacy (H.2(c))
and procedural adherence (H.4(b)). During this period, the number of findings with the same cross-cutting aspects was not reduced and our substantive cross-cutting issue criteria in IMC 0305 were met. You have initiated actions to improve performance, however, the scope and progress of your efforts in addressing the cross-cutting performance deficiencies has not been sufficient to provide adequate confidence in your effectiveness in resolving this issue.
Therefore, this cross-cutting issue will remain open until the NRC gains confidence in your efforts and progress in addressing human performance errors. In addition, because you have a substantive cross-cutting issue in the area of Human Performance for two consecutive assessment cycles, we are requesting that you provide a written response to the issue to include a discussion of your actions undertaken, those actions planned to address the concern, and a current assessment of performance. This response should be sent to the NRC within
J. Davis 30 days of receipt of this letter. As an alternative to a written response, should you want to meet with us to discuss human performance at Fermi 2, a public meeting will be accommodated at an agreed upon time and location.
The enclosed inspection plan details the inspections, less those related to physical protection scheduled through December 31, 2009. The inspection plan is provided to allow for the resolution of any scheduling conflicts and personnel availability issues well in advance of inspector arrival onsite. Routine resident inspections are not listed due to their ongoing and continuous nature. The inspections in the last nine months of the inspection plan are tentative and may be revised at the end-of-cycle review.
In accordance with 10 CFR 2.390 of the NRC=s ARules of Practice,@ a copy of this letter and its enclosure will be made available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
If circumstances arise which cause us to change this inspection plan, we will contact you to discuss the change as soon as possible. Please contact Ross Telson at 630-829-9619 with any questions you may have regarding this letter or the inspection plan.
Sincerely,
/RA/
Cynthia D. Pederson, Director Division of Reactor Projects Docket No. 50-341 License No. NPF-43
Enclosure:
Fermi Inspection/Activity Plan DISTRIBUTION:
See next page
Letter to J. Davis from C. Pederson dated September 2, 2008
SUBJECT:
MID-CYCLE PERFORMANCE REVIEW AND INSPECTION PLAN -
FERMI POWER PLANT, UNIT 2 cc w/encl:
J. Plona, Vice President, Nuclear Generation K. Hlavaty, Plant Manager R. Gaston, Manager, Nuclear Licensing D. Pettinari, Legal Department Michigan Department of Environmental Quality M. Yudasz, Jr., Director, Monroe County Emergency Management Division Supervisor - Electric Operators T. Strong, Chief, State Liaison Officer, State of Michigan Wayne County Emergency Management Division Chair, Wayne County Board of Commissioners Wayne County Sheriff Director, Wayne County Emergency Management Agency Mayor of Flat Rock Mayor of Gibraltar City Administrator of Gibraltar Monroe County Board Chairman Monroe County Sheriff Director, Monroe County Emergency Management Agency Director, Monroe County Health Department Mayor of Monroe Monroe City Manager Carleton Village President Mayor of Rockwood Rockwood City Administrator Supervisor, Frenchtown Charter Township G. Mortensen, INPO
J. Davis 30 days of receipt of this letter. As an alternative to a written response, should you want to meet with us to discuss human performance at Fermi 2, a public meeting will be accommodated at an agreed upon time and location.
The enclosed inspection plan details the inspections, less those related to physical protection scheduled through December 31, 2009. The inspection plan is provided to allow for the resolution of any scheduling conflicts and personnel availability issues well in advance of inspector arrival onsite. Routine resident inspections are not listed due to their ongoing and continuous nature. The inspections in the last nine months of the inspection plan are tentative and may be revised at the end-of-cycle review.
In accordance with 10 CFR 2.390 of the NRC=s ARules of Practice,@ a copy of this letter and its enclosure will be made available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
If circumstances arise which cause us to change this inspection plan, we will contact you to discuss the change as soon as possible. Please contact Ross Telson at 630-829-9619 with any questions you may have regarding this letter or the inspection plan.
Sincerely, Cynthia D. Pederson, Director Division of Reactor Projects Docket No. 50-341 License No. NPF-43
Enclosure:
Fermi Inspection/Activity Plan DISTRIBUTION:
See next page DOCUMENT NAME: G:\\1-Secy\\2008 Mid-cycle final letters\\Fermi MOC Letter.doc Publicly Available Non-Publicly Available Sensitive Non-Sensitive To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copy OFFICE RIII RIII RIII NAME RLerch:dtp RTelson CPederson DATE 08/26/08 08/27/08 08/29/08 OFFICIAL RECORD COPY
Letter to J. Davis from C. Pederson dated September 2, 2008
SUBJECT:
MID-CYCLE PERFORMANCE REVIEW AND INSPECTION PLAN -
FERMI POWER PLANT, UNIT 2 DISTRIBUTION:
Tamara Bloomer RidsNrrDorlLpl3-1 RidsNrrPMFerm2 Resource RidsNrrDirsIpab Resource James Caldwell Mark Satorius Jared Heck Kenneth Obrien Allan Barker DRPIII DRSIII Patricia Buckley Tammy Tomczak ROPreports@nrc.gov (inspection reports, final SDP letters, any letter with an IR number)
Fermi Inspection / Activity Plan 09/01/2008 - 12/31/2009 Inspection Type Inspection Activity Planned Dates Start End No. of Staff on Site Title 1
BI RP
- RADIATION PROTECTION BASELINE INSPECTION Baseline Inspections Access Control to Radiologically Significant Areas 09/15/2008 09/19/2008 7112101 IP Baseline Inspections Reactor Coolant System Activity 09/15/2008 09/19/2008 71151-BI01 IP Baseline Inspections Occupational Exposure Control Effectiveness 09/15/2008 09/19/2008 71151-OR01 IP Baseline Inspections RETS/ODCM Radiological Effluent 09/15/2008 09/19/2008 71151-PR01 IP 1
- PAD CONSTRUCTION Other Routine Review of 10 CFR 72.212(b) Evaluations at Operating Plants 09/30/2008 12/31/2008 60856.1 IP 2
TI
- TEMPORARY INSTRUCTION 2515/171 Generic Safety Inspectio Verification of Site Specific Implementation Of B.5.b Phase 2 & 3 Mitigating Strategies 10/20/2008 10/24/2008 2515/171 IP 1
BI RP
- RADIATION PROTECTION BASELINE INSPECTION Generic Safety Inspectio Review of the Implementation of the Industry Ground Water Protection Voluntary Initiative 02/09/2009 02/20/2009 2515/173 IP Baseline Inspections Radioactive Gaseous and Liquid Effluent Treatment and Monitoring Systems 02/09/2009 02/20/2009 7112201 IP 1
BI EP
- EP ROUTINE INSPECTION / PI VERIFICATION EP Baseline Inspection Alert and Notification System Testing 02/09/2009 02/13/2009 7111402 IP EP Baseline Inspection Emergency Response Organization Augmentation Testing 02/09/2009 02/13/2009 7111403 IP EP Baseline Inspection Correction of Emergency Preparedness Weaknesses and Deficiencies 02/09/2009 02/13/2009 7111405 IP Baseline Inspections Drill/Exercise Performance 02/09/2009 02/13/2009 71151-EP01 IP Baseline Inspections ERO Drill Participation 02/09/2009 02/13/2009 71151-EP02 IP Baseline Inspections Alert & Notification System 02/09/2009 02/13/2009 71151-EP03 IP 3
FY 2009
- FERMI INITIAL PREP 02/2009 Not Applicable OL - INITIAL EXAM - MARCH 2009 - FERM 02/16/2009 02/20/2009 W90197 3
OL EXAM
- FERMI INITIAL LICENSE EXAMINATION Not Applicable OL - INITIAL EXAM - MARCH 2009 - FERM 03/09/2009 03/20/2009 W90197 2
BI ENG
- ENGINEERING INSERVICE INSPECTION Baseline Inspections Inservice Inspection Activities - BWR 04/06/2009 04/10/2009 7111108G IP 2
BI RP
- RADIATION PROTECTION BASELINE INSPECTION Baseline Inspections Access Control to Radiologically Significant Areas 04/06/2009 04/10/2009 7112101 IP Baseline Inspections ALARA Planning and Controls 04/06/2009 04/10/2009 7112102 IP 1
- ISFSI - DESIGN AND PAD CONSTRUCTION Other Routine On-Site Fabrication Of Components And Construction On An ISFSI 04/01/2009 09/30/2009 60853 IP Other Routine Review of 10 CFR 72.212(b) Evaluations 04/01/2009 09/30/2009 60856 IP 3
BI ENG
- ENGINEERING MODIFICATIONS / 50.59 INSP.
Baseline Inspections Evaluations of Changes, Tests, or Experiments & Permanent Plant Modifications 06/01/2009 06/19/2009 7111117B IP 1
BI ENG
- TRIENNIAL HEAT SINK INSPECTION Baseline Inspections Heat Sink Performance 07/13/2009 07/17/2009 7111107B IP
Fermi Inspection / Activity Plan 09/01/2008 - 12/31/2009 Inspection Type Inspection Activity Planned Dates Start End No. of Staff on Site Title 4
BI PI&R
- BIENNIAL PI&R INSPECTION Baseline Inspections Identification and Resolution of Problems 09/21/2009 10/09/2009 71152B IP 1
BI RP
- RADIATION PROTECTION BASELINE INSPECTION Baseline Inspections Access Control to Radiologically Significant Areas 09/14/2009 09/18/2009 7112101 IP Baseline Inspections ALARA Planning and Controls 09/14/2009 09/18/2009 7112102 IP Baseline Inspections Reactor Coolant System Activity 09/14/2009 09/18/2009 71151-BI01 IP Baseline Inspections Occupational Exposure Control Effectiveness 09/14/2009 09/18/2009 71151-OR01 IP Baseline Inspections RETS/ODCM Radiological Effluent 09/14/2009 09/18/2009 71151-PR01 IP 1
BI RP
- RADIATION PROTECTION BASELINE INSPECTION Baseline Inspections Radioactive Material Processing and Transportation 11/02/2009 11/06/2009 7112202 IP 2
BI OL
- BIENNIAL REQUAL. PROGRAM INSPECTION Baseline Inspections Licensed Operator Requalification Program 12/14/2009 12/18/2009 7111111B IP