(2)
Technical Specifications The Technical Specifications contained in Appendix A, as revised through Amendment No i".2a-,which are attached hereto, are hereby incorporated into this renewed operating license. Duke Energy Carolinas, LLC shall operate the facility in accordance with the Technical Specifications.
(3)
Updated Final Safety Analysis Report The Updated Final Safety Analysis Report supplement submitted pursuant to 10 CFR 54.21(d), as revised on December 16, 2002, describes certain future activities to be completed before the period of extended operation. Duke shall complete these activities no later than December 6, 2024, and shall notify the NRC in writing when implementation of these activities is complete and can be verified by NRC inspection.
The Updated Final Safety Analysis Report supplement as revised on December 16, 2002, described above, shall be included in the next scheduled update to the Updated Final Safety Analysis Report required by 10 CFR 50.71(e)(4), following issuance of this renewed operating license. Until that update is complete, Duke may make changes to the programs described in such supplement without prior Commission approval, provided that Duke evaluates each such change pursuant to the criteria set forth in 10 CFR 50.59 and otherwise complies with the requirements in that section.
(4)
Antitrust Conditions Duke Energy Carolinas, LLC shall comply with the antitrust conditions delineated in Appendix C to this renewed operating license.
(5)
Fire Protection Program (Section 9.5.1, SER, SSER #2, SSER #3, SSER #4, SSER #5)*
Duke Energy Carolinas, LLC shall implement and maintain in effect all provisions of the approved fire protection program as described in the Updated Final Safety Analysis Report, as amended, for the facility and as approved in the SER through Supplement 5, subject to the following provision:
The licensee may make changes to the approved fire protection program without prior approval of the Commission only if those changes would not adversely affect the ability to achieve and maintain safe shutdown in the event of a fire.
- The parenthetical notation following the title of this renewed operating license condition denotes the section of the Safety Evaluation Report and/or its supplement wherein this renewed license condition is discussed.
Renewed License No. NPF-35 Amendment No. 244--
(2)
Technical Specifications The Technical Specifications contained in Appendix A, as revised through Amendment No. 238 i which are-attached hereto, are hereby incorporated into this renewed operating license. Duke Energy Carolinas, LLC shall operate the facility in accordance with the.Technical Specifications.
(3)
Updated Final Safety.Analysis Report The Updated Final Safety Analysis Report supplement submitted pursuant to 10 CFR 54.21(d), as revised on December 16, 2002,. describes certain future activities to be completed before the period of extended operation. Duke shall complete these activities no later than February 24, 2026, and shall notify the NRC in writing when implementation of these activities is complete and can be
-verified by NRC inspection.
The Updated Final Safety Analysis.Report supplement as revised on December 16, 2002, described above, shall be included in the next scheduled update to the Updated Final Safety Analysis Report required by 10 CFR 50.71 (e)(4), following issuance of this renewed operating license.. Until that update is complete, Duke may make changes to the programs described in such supplement without prior Commission approval, provided that Duke. evaluates each such change pursuant to the criteria set forth in 10 CFR 50.59 and otherwise complies with the requirements in that section.
(4)
Antitrust Conditions Duke Energy Carolinas, LLC shall comply with the antitrust conditions delineated in Appendix C to this renewed operating license.
(5)
Fire.Protection Proqram (Section 9ý5.1, SER, SSER #2, SSER #3, SSER #4, SSER#5)*
Duke Energy Carolinas, LLC shall implement and maintain in effect all provisions of the approved fire protection program as described in the Updated Final.Safety.
Analysis Report, as amended, for the facility and as approved in the SER through Supplement 5, subject to the following provision:
The licensee may make changes to the approved fire protection program without prior approval of the Commission only if those changes would not adversely affect the ability to achieve and maintain safe shutdown in the event of a fire.
- The parenthetical notation following the title of this renewed operating license condition denotes the section of the Safety Evaluation Report and/or its supplements wherein this renewed license condition is discussed.
Renewed License No. NPF-52 Amendment No. f238
MSIVs 3.7.2 ACTIONS (continued)
CONDITION REQUIRED ACTION COMPLETION TIME D.
Required Action and D.1 Be in MODE 3.
6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> associated Completion Time of Condition C not AND met.
D.2 Be in MODE 4.
12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.7.2.1
NOTE Only required to be performed prior to entry into MODE 2.
Verify closure time of each MSIV is within limits on an In accordance with actual or simulated actuation signal.
the Inservice Testing Program Catawba Units 1 and 2 3.7.2-2 Amendment Nos.
244 and 238
MFIVs, MFCVs, Associated Bypass Valves and Tempering Valves 3.7.3 ACTIONS (continued)
CONDITION REQUIRED ACTION COMPLETION TIME C.
One or more MFIV or C.1 Close or isolate bypass 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> MFCV bypass valves valve..
AND C.2 Verify bypass valve is Once per closed or isolated.
7 days D.
Two valves in the same D.1 Isolate affected flow path.
8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> flow path or the tempering valve inoperable.
E.
Required Action and E.1 Be in MODE 3.
6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> associated Completion Time not met.
AND E.2 Be in MODE 4.
12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.7.3.1 Verify the closure time of each MFIV, MFCV, their In accordance with associated bypass valve, and the tempering valve is within the Inservice limits on an actual or simulated actuation signal.
Testing Program Catawba Units 1 and 2 3.7.3-2 Amendment Nos.
244 and 238