ML082260406
From kanterella
Jump to navigation
Jump to search
ML082260406 | |
Person / Time | |
---|---|
Site: | Peach Bottom ![]() |
Issue date: | 08/01/2008 |
From: | Exelon Generation Co, Exelon Nuclear |
To: | Office of Nuclear Reactor Regulation |
References | |
PM-1055, Rev 1 | |
Download: ML082260406 (576) | |
Similar Documents at Peach Bottom | |
---|---|
Category:Calculation
MONTHYEARML22003A0022021-12-20020 December 2021
[Table view]Proposed Relief Request Associated with Reactor Pressure Vessel N-16A Nozzle Repair ML15153A2362015-05-26026 May 2015 Calculation PM-1055, Revision 1, Calculation of Alternative Source Term (AST) Onsite and Offsite X/Q Values, Pp. 320 Through 938 ML15153A2372015-05-26026 May 2015 Calculation PM-1055, Revision 1, Calculation of Alternative Source Term (AST) Onsite and Offsite X/Q Values, Pp. 939 Through the End ML15153A2352015-05-26026 May 2015 Calculation PM-1055, Revision 1, Calculation of Alternative Source Term (AST) Onsite and Offsite X/Q Values, Pp. 1 Through 319 ML14247A5232014-09-0303 September 2014 Attachment 5, PBAPS Calculation PM-1168, Post-CRDA Release from RCS Sample Line, Revision 0 ML14211A0202014-07-12012 July 2014 Calculation PM-1059, Revision 5, Eab, LPZ, and CR Doses Due to Fuel Handling Accident (FHA) ML14211A0212014-06-13013 June 2014 Calculation PM-1170, Revision 0, PBAPS Atmospheric Dispersion Factors (X/Qs) for post-FHA Ground Hatch Releases ML12286A0182011-07-25025 July 2011 License Amendment Request - Extended Power Uprate, Enclosure 14a to Attachment 14, Setpoint Calculation for Average Power Range Monitor Simulated Thermal Power - High, PE-0251 ML1103904612011-02-0707 February 2011 County Station Analysis L-003388, Revision 0, LaSalle Irsf Shielding Calculations for Class B & C Waste, Attachment N (Page N17 of N29) Through Attachment P (Page P11 of P11) ML1103904602011-02-0707 February 2011 County Station Analysis L-003388, Revision 0, LaSalle Irsf Shielding Calculations for Class B & C Waste, Attachment N (Page N1 of N29) Through Attachment N (Page N16 of N29) MCNP Cases and Geometry: Analysis of 100 Filled HICs ML1103904572011-02-0707 February 2011 County Station Analysis L-003388, Revision 0, LaSalle Irsf Shielding Calculations for Class B & C Waste, Attachment K (Page K1 of K18) Through Attachment M (Page M147 of M147) Spreadsheet Used to Check MCNP Cases and Data Analysis ML1103904502011-02-0707 February 2011 County Station Analysis L-003388, Revision 0, LaSalle Irsf Shielding Calculations for Class B & C Waste, Attachment J (Page J1 of J18) Excel Spreadsheet Formulas ML1103904492011-02-0707 February 2011 County Station Analysis L-003388, Revision 0, LaSalle Irsf Shielding Calculations for Class B & C Waste, Attachment E (Page E1 of E246) Through Attachment I (Page I-17 of I-17) RS-11-016, County Station Analysis L-003388, Revision 0, LaSalle Irsf Shielding Calculations for Class B & C Waste, Attachment B (Page B1 of B485) Through Attachment D (Page D3 of D5) MCNP Cases and Geometry2011-02-0707 February 2011 County Station Analysis L-003388, Revision 0, LaSalle Irsf Shielding Calculations for Class B & C Waste, Attachment B (Page B1 of B485) Through Attachment D (Page D3 of D5) MCNP Cases and Geometry ML1012501442010-04-28028 April 2010 Offsite Dose Calculation Manual, Revision 13 ML1025700842009-11-19019 November 2009 Calculation CC-AA-309-1001, Rev. 5, to Establish Limiting Demand for N(2) for the CAD System & the Sgig System for Dual Unit Operation ML0918908312009-08-0303 August 2009 Enclosure 2: Thermal-Hydraulic Analysis to Support Update of Specific Success Criteria in the Standardized Plant Analysis Risk Model, Appendix a, Verson 2.0, Appendix a: Melcor Surry Plant System Models, Calculation Rev. 9 ML0918908452009-08-0303 August 2009 Enclosure 3: Thermal-Hydraulic Analysis to Support Update of Specific Success Criteria in the Standardized Plant Analysis Risk Model, Appendix B, Version 2.0, Appendix B: Melcor Peach Bottom Plannt System Models, Calculation Rev. 8 ML0912504372009-04-27027 April 2009 Offsite Dose Calculation Manual Revision 13 LR-N09-0074, Letter from Jeffrie Keenan of PSEG Nuclear L.L.C., NRC Decommissioning Funding Status Report for Salem, Hope Creek & Peach Bottom Generating Stations2009-03-31031 March 2009 Letter from Jeffrie Keenan of PSEG Nuclear L.L.C., NRC Decommissioning Funding Status Report for Salem, Hope Creek & Peach Bottom Generating Stations ML0822604122008-08-0707 August 2008 Calculation PM-1077, Rev. 1, Post-LOCA Eab, LPZ and CR Doses Using Alternative Source Term (Ast) ML0822604132008-08-0404 August 2008 Calculation PM-1059, Rev. 3, Re-Analysis of Fuel Handling Accident (FHA) Using Alternative Source Terms ML0822604142008-08-0404 August 2008 Calculation PM-1057, Rev. 2, Re-Analysis of Control Rod Drop Accident (CRDA) Using Alternative Source Terms ML0822604022008-08-0101 August 2008 Calculation PM-1055, Rev. 1, Calculation of Alternative Source Term (AST) Onsite and Offsite X/Q Values ML0822604062008-08-0101 August 2008 Calculation PM-1055, Rev. 1, Calculation of Alternative Source Term (AST) Onsite and Offsite X/Q Values, Attachment J, Pages 801 to End, and Attachment K and L ML0822604042008-08-0101 August 2008 Calculation PM-1055, Rev. 1, Calculation of Alternative Source Term (AST) Onsite and Offsite X/Q Values, Attachment J, Pages 401 to 800 of 1286 ML0806700452008-02-28028 February 2008 PBAPS Calculation G-0106-002, Revision 4, Control Room Upgrading HVAC Duct Supports ML0806700442008-02-28028 February 2008 PBAPS Calculation PS-049, Revision 2, Seismic Evaluation of Consoles 2(3)OCO5A, 2(3)OCO4A and 2(3)0C03 for Mod 955 ML0806700432008-02-28028 February 2008 PBAPS Calculation 1-1, Revision 1, Stress Analysis for Main Steam Outside Containment ML0806701922008-02-28028 February 2008 PBAPS Calculation 49-48/H-, Revision 0, Heating and Ventilation - Seismic Analysis for Anchor Bolts ML0806702652008-02-28028 February 2008 PBAPS Calculation 23-4/X-1, Revision 0, Reactor Building - H&V Ducts, Seismic Analysis ML0725702092007-05-0707 May 2007 Calculation PM-1077, Rev. 0, Post-LOCA Eab, LPZ, and CR Doses Using Alternative Source Term (Ast) ML0725702052005-02-10010 February 2005 Calculation PM-1059, Rev. 2, Re-analysis of Fuel Handling Accident (FHA) Using Alternative Source Terms ML0412704252004-04-23023 April 2004 Supplement to License Amendment Request for Main Steam Tunnel Temperature - High, Attachment 2, Main Steam Line Isolation on High Steam Tunnel Temperature Allowable Value Setpoint Calculation ML0725701972003-06-18018 June 2003 Calculation PM-1057, Rev. 1, Re-analysis of Control Rod Drop Accident (CRDA) Using Alternate Source Terms ML0725702022003-03-28028 March 2003 Calculation PM-1058, Rev. 0, Re-analysis of Main Steam Line Break (MSLB) Accident Using Alternative Source Terms ML0725701902003-03-28028 March 2003 Calculation PM-1056, Rev. 0, Suppression Pool Ph Calculation for Alternative Source Terms ML0706002112003-01-17017 January 2003 GE Index 9-3, Rev. 1; an ASME Section Viii Evaluation of Oc Drywell for Without Sand Case Part 1 Stress Analysis, 2/91 2021-12-20 |
Text
Retrieved from "https://kanterella.com/w/index.php?title=ML082260406&oldid=5327272"