ML082240700

From kanterella
Jump to navigation Jump to search

Letter Transmitting Order Approving Transfer of Operating Authority and Conforming Amendment
ML082240700
Person / Time
Site: Monticello 
(DPR-022)
Issue date: 09/15/2008
From: Tam P
NRC/NRR/ADRO/DORL/LPLIII-1
To: Koehl D, Wilks D
Northern States Power Co, Nuclear Management Co
Tam P
Shared Package
ML082240725 List:
References
TAC MD8523
Download: ML082240700 (4)


Text

September 15, 2008 Mr. David M. Wilks Vice President and Officer Northern States Power Company 4653 Table Mountain Drive Golden, CO 80403 Mr. Dennis L. Koehl Vice President and Chief Nuclear Officer Nuclear Management Company, LLC Officer - Northern States Power Company 414 Nicollet Mall (MP4)

Minneapolis, MN 55401

SUBJECT:

MONTICELLO NUCLEAR GENERATING PLANT - ORDER APPROVING TRANSFER OF LICENSED OPERATING AUTHORITY AND CONFORMING AMENDMENT (TAC NO. MD8523)

Dear Messrs. Wilks and Koehl:

By letter to the U.S. Nuclear Regulatory Commission (NRC) dated April 16, 2008, as supplemented by letter dated August 6, 2008, you submitted an application, pursuant to Sections 50.80 and 50.90 of Title 10 of the Code of Federal Regulations (10 CFR), requesting among other things, approval of the transfer of the operating authority of Renewed Facility Operating License No. DPR-22 for Monticello Nuclear Generating Plant (MNGP) from Nuclear Management Company, LLC (NMC) to Northern States Power Company, a Minnesota corporation (NSPM). The application also requested approval of a conforming amendment to DPR-22 pursuant to 10 CFR 50.80 and 50.90. Notice of the application was published in the Federal Register on June 5, 2008 (73 FR 32057). The August 6, 2008, letter, contained clarifying information, did not expand the application beyond the scope of the notice, and did not affect the applicability of the no significant hazards consideration determination as published in the Federal Register.

The NRC staff has completed its review of the application and found the proposed transfer of operating authority acceptable. Enclosure 1 is the Order, which approves the proposed transfer of operating authority. Enclosure 2 contains the draft conforming amendment with draft revised pages of the license; this package will be issued and become effective at the time the transfer is consummated. Enclosure 3 is the NRC staff=s safety evaluation related to the subject actions.

D. Wilks et. al.

The Order has been forwarded to the Office of Federal Register for publication.

Sincerely,

/RA/

Peter S. Tam, Senior Project Manager PIant Licensing Branch III-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-263

Enclosures:

1. Order
2. Draft Conforming Amendment to DPR-22
3. Safety Evaluation cc: See next page

D. Wilks et. al.

The Order has been forwarded to the Office of Federal Register for publication.

Sincerely,

/RA/

Peter S. Tam, Senior Project Manager PIant Licensing Branch III-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-263

Enclosures:

1. Order
2. Draft Conforming Amendment to DPR-22
3. Safety Evaluation cc: See next page DISTRIBUTION:

PUBLIC LPL3-1 Reading File RidsNrrOd RidsNrrAdro RidsNrrDorl RidsNrrDorlLp3-1 RidsNrrPMPTam RidsNrrLATHarris RidsNrrDprPfpb RidsNrrDirsIolb R. Uleck, NRR G. Armstrong, NRR S. Burnell, OPA RidsRgn3MailCenter RidsOgcRp RidsAcrsAcnw&mMailCentr RidsSecyMailCenter RidsOpaMailCenter D. Pelton, EDO RidsNrrAdes Package No.: ML082240725 Letter: ML082240700 Order: ML082521171 Draft Conforming Amendment: ML082521178 Draft OL Pages: ML082590472 Safety evaluation: ML082240750 *concurred via memo OFFICE LPL3-1/PM LPL3-1/LA PFPB/BC(A)*

DIRS/IOLB/BC**

NAME PTam THarris MDusaniwskyj*

NSalgado**

DATE 8/19/08 8/19/08 7/31/08 8/12/08 OFFICE OGC LPL3-1/BC DORL/D NRR/D NAME GMizuno PTam for LJames JGiitter ELeeds DATE 8/26/08 9/2/08 9/4/08 9/15/08 OFFICIAL RECORD COPY

Monticello Nuclear Generating Plant cc:

Peter M. Glass Assistant General Counsel Xcel Energy Services, Inc.

414 Nicollet Mall (MP4)

Minneapolis, MN 55401 U.S. Nuclear Regulatory Commission Resident Inspector's Office 2807 W. County Road 75 Monticello, MN 55362 Manager, Nuclear Safety Assessment Monticello Nuclear Generating Plant Nuclear Management Company, LLC 2807 West County Road 75 Monticello, MN 55362-9637 Commissioner Minnesota Pollution Control Agency 520 Lafayette Road St. Paul, MN 55155-4194 Commissioner Minnesota Department of Health 717 Delaware Street, S. E.

Minneapolis, MN 55440 Douglas M. Gruber, Auditor/Treasurer Wright County Government Center 10 NW Second Street Buffalo, MN 55313 Commissioner Minnesota Department of Commerce 85 7th Place East, Suite 500 St. Paul, MN 55101-2198 Manager - Environmental Protection Division Minnesota Attorney General=s Office 445 Minnesota St., Suite 900 St. Paul, MN 55101-2127 Nuclear Asset Manager Xcel Energy, Inc.

414 Nicollet Mall (MP4)

Minneapolis, MN 55401 Mr. Timothy J. O=Connor Site Vice President Monticello Nuclear Generating Plant Nuclear Management Company, LLC 2807 West County Road 75 Monticello, MN 55362-9637