August 19, 2008 Vice President, Operations Entergy Nuclear Operations, Inc Indian Point Energy Center 450 Broadway, GSB P.O. Box 249 Buchanan, NY 10511-0249
SUBJECT:
INDIAN POINT NUCLEAR GENERATING UNIT NO. 2 - INDIVIDUAL NOTICE OF CONSIDERATION OF ISSUANCE OF AMENDMENT TO FACILITY OPERATING LICENSE, PROPOSED NO SIGNIFICANT HAZARDS CONSIDERATION DETERMINATION, AND OPPORTUNITY FOR HEARING RE: ALLOWABLE COMPLETION TIME FOR OFFSITE AC SOURCES (TAC NO. MD9348)
Dear Sir or Madam:
The Nuclear Regulatory Commission has forwarded the enclosed ANotice of Consideration of Issuance of Amendment to Renewed Facility Operating License, Proposed No Significant Hazards Consideration Determination, and Opportunity for a Hearing,@ to the Office of the Federal Register for publication.
This notice relates to your application dated July 30, 2008 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML082180351), to revise the Indian Point Nuclear Generating Unit No. 2 Technical Specification (TS) 3.8.1, Required Action A.4, to allow a one time extension to the completion time for the loss of one offsite power circuit from 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> to 144 hours0.00167 days <br />0.04 hours <br />2.380952e-4 weeks <br />5.4792e-5 months <br />. This change will ensure that there is enough time for the failed oil cooling pump on the station auxiliary transformer to be removed, the new oil cooling pump to be installed, and the new oil cooling pump to be tested in place.
If you have any questions, please contact me at 301-415-2901.
Sincerely,
/RA/
John P. Boska, Senior Project Manager Plant Licensing Branch I-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-247
Enclosure:
As stated cc w/encl: See next page
Indian Point Nuclear Generating Unit No. 2 cc:
Senior Vice President Entergy Nuclear Operations, Inc.
P.O. Box 31995 Jackson, MS 39286-1995 Vice President Oversight Entergy Nuclear Operations, Inc.
P.O. Box 31995 Jackson, MS 39286-1995 Senior Manager, Nuclear Safety &
Licensing Entergy Nuclear Operations, Inc.
P.O. Box 31995 Jackson, MS 39286-1995 Senior Vice President and COO Entergy Nuclear Operations, Inc.
440 Hamilton Avenue White Plains, NY 10601 Assistant General Counsel Entergy Nuclear Operations, Inc.
440 Hamilton Avenue White Plains, NY 10601 Manager, Licensing Entergy Nuclear Operations, Inc.
Indian Point Energy Center 450 Broadway, GSB P.O. Box 249 Buchanan, NY 10511-0249 Mr. Paul Tonko President and CEO New York State Energy, Research, and Development Authority 17 Columbia Circle Albany, NY 12203-6399 Mr. John P. Spath New York State Energy, Research, and Development Authority 17 Columbia Circle Albany, NY 12203-6399 Mr. Paul Eddy New York State Department of Public Service 3 Empire State Plaza Albany, NY 12223-1350 Regional Administrator, Region I U.S. Nuclear Regulatory Commission 475 Allendale Road King of Prussia, PA 19406 Senior Resident Inspector=s Office Indian Point 2 and 3 U. S. Nuclear Regulatory Commission P.O. Box 59 Buchanan, NY 10511 Mr. Charles Donaldson, Esquire Assistant Attorney General New York Department of Law 120 Broadway New York, NY 10271 Mr. Raymond L. Albanese Four County Coordinator 200 Bradhurst Avenue Unit 4 Westchester County Hawthorne, NY 10532 Mayor, Village of Buchanan 236 Tate Avenue Buchanan, NY 10511 Mr. Jim Riccio Greenpeace 702 H Street, NW Suite 300 Washington, DC 20001 Mr. Phillip Musegaas Riverkeeper, Inc.
828 South Broadway Tarrytown, NY 10591
Indian Point Nuclear Generating Unit No. 2 cc:
Mr. Mark Jacobs IPSEC 46 Highland Drive Garrison, NY 10524 Mr. Sherwood Martinelli FUSE USA via email
August 19, 2008 Vice President, Operations Entergy Nuclear Operations, Inc Indian Point Energy Center 450 Broadway, GSB P.O. Box 249 Buchanan, NY 10511-0249
SUBJECT:
INDIAN POINT NUCLEAR GENERATING UNIT NO. 2 - INDIVIDUAL NOTICE OF CONSIDERATION OF ISSUANCE OF AMENDMENT TO FACILITY OPERATING LICENSE, PROPOSED NO SIGNIFICANT HAZARDS CONSIDERATION DETERMINATION, AND OPPORTUNITY FOR HEARING RE: ALLOWABLE COMPLETION TIME FOR OFFSITE AC SOURCES (TAC NO. MD9348)
Dear Sir or Madam:
The Nuclear Regulatory Commission has forwarded the enclosed ANotice of Consideration of Issuance of Amendment to Renewed Facility Operating License, Proposed No Significant Hazards Consideration Determination, and Opportunity for a Hearing,@ to the Office of the Federal Register for publication.
This notice relates to your application dated July 30, 2008 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML082180351), to revise the Indian Point Nuclear Generating Unit No. 2 Technical Specification (TS) 3.8.1, Required Action A.4, to allow a one time extension to the completion time for the loss of one offsite power circuit from 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> to 144 hours0.00167 days <br />0.04 hours <br />2.380952e-4 weeks <br />5.4792e-5 months <br />. This change will ensure that there is enough time for the failed oil cooling pump on the station auxiliary transformer to be removed, the new oil cooling pump to be installed, and the new oil cooling pump to be tested in place.
If you have any questions, please contact me at 301-415-2901.
Sincerely,
/RA/
John P. Boska, Senior Project Manager Plant Licensing Branch I-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-247
Enclosure:
As stated cc w/encl: See next page DISTRIBUTION:
PUBLIC LPL1-1 R/F RidsNrrPMJBoska RidsNrrDorlLpl1-1 RidsOGCMailCenter RidsNrrLASLittle (hard copy)
RidsNrrDorlDpr Accession Number: ML082210182 Package ML082210256 Letter ML082210182 FRN ML082210241 OFFICE LPL1-1\\PM LPL1-1\\LA LPL1-1\\BC NAME JBoska SLittle MKowal DATE 8/14/08 8/18/08 8/19/08 Official Record Copy