ML082150005
| ML082150005 | |
| Person / Time | |
|---|---|
| Site: | San Onofre |
| Issue date: | 08/01/2008 |
| From: | Ryan Lantz Operations Branch IV |
| To: | Ridenoure R Southern California Edison Co |
| References | |
| IR-08-007 IR-08-007 | |
| Download: ML082150005 (3) | |
See also: IR 05000361/2008007
Text
OFFICIAL USE ONLY - SECURITY-RELATED INFORMATION
OFFICIAL USE ONLY - SECURITY-RELATED INFORMATION
August 1, 2008
Mr. Ross T. Ridenoure
Senior Vice President and
Chief Nuclear Officer
Southern California Edison Company
San Onofre Nuclear Generating Station
P.O. Box 128
San Clemente, CA 92674-0128
SUBJECT:
SAN ONOFRE NUCLEAR GENERATING STATION UNITS 2, AND 3 -
SITE-SPECIFIC IMPLEMENTATION OF B.5.B PHASE 2 AND 3 MITIGATING
STRATEGIES TEMPORARY INSTRUCTION INSPECTION (NRC INSPECTION
REPORT 05000361/2008007 AND 05000362/2008007)
Dear Mr.Ridenoure:
In a telephone conversation on July 25, 2008, Messrs. Clay Williams, Manager, Compliance,
and Clyde Osterholtz, Team Leader, made arrangements for the Nuclear Regulatory
Commission (NRC) to inspect the site-specific implementation of B.5.b Phase 2 and 3 mitigating
strategies at the San Onofre Nuclear Generating Station Units 2, and 3. The inspection is
planned for the week of August 18, 2008.
In order for the NRC to adequately prepare for this inspection, please furnish the documents
listed in Enclosure 1 to Mr. Osterholtz in electronic format no later than August 12, 2008.
Please have available on site at the beginning of the inspection the arrangements and
documents listed in Enclosure 2. Mr. Williams has been advised of this request and provided
with the name and address of the NRC lead inspector.
This letter contains information collections that are subject to the Paperwork Reduction Act of
1995 (44 U.S.C. 3501 et seq.). These information collections were approved by the Office of
Management and Budget, approval number 3150-0011.
The public reporting burden for this collection of information is estimated to average 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> per
response, including the time for reviewing instructions, gathering and maintaining the data
needed, and completing and reviewing the collection of information. Send comments on any
UNITED STATES
NUCLEAR REGULATORY COMMISSION
R E GI ON I V
612 EAST LAMAR BLVD, SUITE 400
ARLINGTON, TEXAS 76011-4125
OFFICIAL USE ONLY - SECURITY-RELATED INFORMATION
Southern California Edison Company
- 2 -
OFFICIAL USE ONLY - SECURITY-RELATED INFORMATION
aspect of this collection of information, including suggestions for reducing the burden, to the
Records and FOIA/Privacy Services Branch (T-5 F53), U.S. Nuclear Regulatory Commission,
Washington, D.C. 20555-0001, or by Internet electronic mail to
INFOCOLLECTS.Resource@NRC.GOV; and to the Desk Officer, Office of Information and
Regulatory Affairs, NEOB-10202, (3150-0011), Office of Management and Budget, Washington,
D.C. 20503-0001.
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be
available electronically for public inspection in the NRC Public Document Room or from the
Publicly Available Records System (PARS) component of NRC's Agencywide Documents
Access and Management System (ADAMS), accessible from the NRC Web site at
http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). However,
because of the sensitive information contained in the enclosures, and in accordance with
10 CFR 2.390, a copy of this letters enclosures will not be available for public inspection.
If Safeguards Information is necessary to provide an acceptable response, please provide the
level of protection described in 10 CFR 73.21. Otherwise, mark your entire response Security-
Related Information-Withhold Under 10 CFR 2.390 and follow the instructions for withholding in
Thank you for your cooperation in this matter. If you have any questions regarding this
inspection, please contact Clyde Osterholtz at 949-492-2641, or me at 817 860-8159.
Sincerely,
/RA/
Ryan E. Lantz, Chief
Operations Branch
Division of Reactor Safety
Dockets: 50-361; 50-362
Enclosures:
1.
Documentation Requested
Prior to the Inspection
2.
Arrangements/Documents Requested
To Be Available On Site during the
Inspection Week
OFFICIAL USE ONLY - SECURITY-RELATED INFORMATION
Southern California Edison Company
- 3 -
OFFICIAL USE ONLY - SECURITY-RELATED INFORMATION
cc w/enclosure:
Mr. Clay Williams, Manager, Compliance
Southern California Edison Company
San Onofre Nuclear Generating Station
P.O. Box 128
San Clemente, CA 92674-0128
cc w/o enclosure:
Vice President and Site Manager
Southern California Edison Company
San Onofre Nuclear Generating Station
P.O. Box 128
San Clemente, CA 92674-0128
Mr. A. Edward Scherer
Director, Nuclear Regulatory Affairs
Southern California Edison Company
San Onofre Nuclear Generating Station
P.O. Box 128
San Clemente, CA 92674-0128
Mr. James T. Reilly
Southern California Edison Company
San Onofre Nuclear Generating Station
P.O. Box 128
San Clemente, CA 92674-0128