MONTHYEARIR 05000390/20250102024-11-0404 November 2024 Notification of an NRC (FPTI) (NRC Inspection Report 05000390/2025010 0500039/ 2025010) (RFI) CNL-24-074, Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure Revisions2024-10-23023 October 2024 Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure Revisions IR 05000390/20243012024-10-17017 October 2024 Operator Licensing Examination Approval 05000390/2024301 and 05000391/2024301 ML24282B0412024-10-15015 October 2024 Request for Withholding Information from Public Disclosure for Sequoyah Nuclear Plant, Units 1 and 2 and Watts Bar Nuclear Plant, Units 1 and 2 ML24261C0062024-10-0404 October 2024 Correction to Amendment No. 134 to Facility Operating License No. NPF-90 and Amendment No. 38 to Facility Operating License No. NPF-96 ML24260A1682024-10-0404 October 2024 Regulatory Audit Summary Related to Request to Add and Revise Notes Related to Technical Specification Table 3.3.2-1, Function 5 ML24284A1072024-09-26026 September 2024 Affidavit for Request for Withholding Information from Public Disclosure for Sequoyah Nuclear Plant, Units 1 and 2, and Watts Bar Nuclear Plant, Units 1 and 2 CNL-24-060, Supplement to Request for Approval of the Tennessee Valley Authority Nuclear Quality Assurance Program Description2024-09-24024 September 2024 Supplement to Request for Approval of the Tennessee Valley Authority Nuclear Quality Assurance Program Description CNL-24-047, Decommitment of Flood Mode Mitigation Improvement Systems2024-09-24024 September 2024 Decommitment of Flood Mode Mitigation Improvement Systems ML24262A0602024-09-23023 September 2024 Summary of August 19, 2024, Meeting with Tennessee Valley Authority Regarding a Proposed Supplement to the Tennessee Valley Authority Nuclear Quality Assurance Plan CNL-24-065, Tennessee Valley Authority – Central Emergency Control Center Emergency Plan Implementing Procedure Revisions2024-09-18018 September 2024 Tennessee Valley Authority – Central Emergency Control Center Emergency Plan Implementing Procedure Revisions 05000390/LER-2024-002, Automatic Reactor Trip Due to Main Generator Protection Relay Actuation2024-09-0505 September 2024 Automatic Reactor Trip Due to Main Generator Protection Relay Actuation IR 05000390/20240052024-08-28028 August 2024 Updated Inspection Plan and Assessment Follow-Up Letter for Watts Bar Nuclear Plant, Units 1 and 2 - Report 05000390-2024005 and 05000391-2024005 ML24218A1442024-08-27027 August 2024 Issuance of Amendment Nos. 169 and 75 Regarding Technical Specification Surveillance Requirement 3.9.5.1 to Reduce the Residual Heat Removal Flow Rate IR 05000390/20244022024-08-20020 August 2024 – Security Baseline Inspection Report 05000390-2024402 and 05000391/2024402 - Public CNL-24-061, Supplement to Application to Revise Function 5 of Technical Specification Table 3.3.2-1, ‘Engineered Safety Feature Actuation System Instrumentation,’ for the Sequoyah and Watts Bar (SQN-TS-23-02 and WBN-TS-23-08),2024-08-19019 August 2024 Supplement to Application to Revise Function 5 of Technical Specification Table 3.3.2-1, ‘Engineered Safety Feature Actuation System Instrumentation,’ for the Sequoyah and Watts Bar (SQN-TS-23-02 and WBN-TS-23-08), ML24219A0262024-08-12012 August 2024 Request for Withholding Information from Public Disclosure IR 05000390/20240022024-08-0707 August 2024 Integrated Inspection Report 05000390/2024002 and 05000391/2024002 Rev ML24204A2652024-07-25025 July 2024 Regulatory Audit Summary Related to Request to Revise Technical Specification Surveillance Requirement 3.9.5.1 to Reduce the Residual Heat Removal Flow Rate ML24199A0012024-07-22022 July 2024 Clarification and Correction to Exemption from Requirement of 10 CFR 37.11(c)(2) ML24172A1342024-07-15015 July 2024 Exemptions from 10 CFR 37.11(C)(2) (EPID L-2023-LLE-0024) - Letter ML24170A8002024-07-15015 July 2024 Issuance of Amendment Nos. 168 and 74 Regarding Revision to Technical Specification Table 1.1-1 for Required Number of Fully Tensioned Reactor Pressure Vessel Head Closure Bolts IR 05000390/20244402024-07-12012 July 2024 95001 Supplemental Inspection Supplemental Report 05000390-2024440 and 05000391-2024440 and Follow-Up Assessment Letter 05000391/LER-2024-003, Inoperability of Both Trains of Unit 2 Low Head Safety Injection2024-07-11011 July 2024 Inoperability of Both Trains of Unit 2 Low Head Safety Injection ML24131A0012024-07-0202 July 2024 Issuance of Amendment Nos. 167 and 73 Regarding Adoption of Technical Specification Task Force Traveler TSTF-427-A, Revision 2 CNL-24-052, Response to Request for Additional Information Regarding Application to Modify the Technical Specification Surveillance Requirement 3.9.5.1 (WBN-TS-21-14)2024-06-27027 June 2024 Response to Request for Additional Information Regarding Application to Modify the Technical Specification Surveillance Requirement 3.9.5.1 (WBN-TS-21-14) CNL-24-018, License Amendment Request for Adoption of Technical Specification Task Force Traveler TSTF-276-A, Revision 2, Regarding TS 3.8.1 AC Sources – Operating to Clarify Requirements for Diesel Generator Testing (WBN-TS2024-06-25025 June 2024 License Amendment Request for Adoption of Technical Specification Task Force Traveler TSTF-276-A, Revision 2, Regarding TS 3.8.1 AC Sources – Operating to Clarify Requirements for Diesel Generator Testing (WBN-TS ML24089A1152024-06-21021 June 2024 Transmittal Letter, Environmental Assessments and Findings of No Significant Impact Related to Exemption Requests from 10 CFR 37.11(c)(2) ML24141A0482024-05-17017 May 2024 EN 56958_1 Ametek Solidstate Controls, Inc ML24100A7642024-05-16016 May 2024 Issuance of Amendment No. 166 Regarding Revision to Technical Specification 3.8.2, AC Sources-Shutdown, to Remove Reference to C-S Diesel Generator (CNL-23-062) IR 05000390/20240012024-05-14014 May 2024 Integrated Inspection Report 05000390/2024001 and 05000391/2024001 CNL-24-040, Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure Revisions2024-05-0808 May 2024 Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure Revisions 05000391/LER-2024-002, Re Automatic Reactor Trip Due to Steam Generator 3 Level LO-LO2024-05-0606 May 2024 Re Automatic Reactor Trip Due to Steam Generator 3 Level LO-LO IR 05000391/20240072024-04-30030 April 2024 Assessment Follow-up Letter for Watts Bar Nuclear Plant, Unit 2 – Report 05000391/2024007 ML24120A1182024-04-29029 April 2024 – Notification of NRC Supplemental Inspection (95001) and Request for Information CNL-24-037, Clinch River, Sequoyah, Units 1 and 2, Watts Bar, Unit 1 and 2, Nuclear Quality Assurance Plan, TVA-NQA-PLN89-A, Revision 422024-04-22022 April 2024 Clinch River, Sequoyah, Units 1 and 2, Watts Bar, Unit 1 and 2, Nuclear Quality Assurance Plan, TVA-NQA-PLN89-A, Revision 42 ML24087A1912024-04-18018 April 2024 Exemption from Select Requirements of 10 CFR Part 73, Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting CNL-24-010, License Amendment Request to Recapture Low-Power Testing Time (WBN-TS-23-19)2024-04-17017 April 2024 License Amendment Request to Recapture Low-Power Testing Time (WBN-TS-23-19) CNL-24-024, Hydrologic Engineering Center River Analysis System Project Milestone Status Update2024-04-17017 April 2024 Hydrologic Engineering Center River Analysis System Project Milestone Status Update CNL-24-033, Central Emergency Control Center Emergency Plan Implementing Procedure Revisions2024-04-17017 April 2024 Central Emergency Control Center Emergency Plan Implementing Procedure Revisions ML24072A0052024-04-15015 April 2024 Issuance of Amendment Nos. 165 and 72 Regarding Increase in the Maximum Number of Tritium Producing Burnable Absorber Rods and Supporting Changes, and Revision to the Updated Final Safety Analysis Report CNL-24-004, Application to Modify the Watts Bar Nuclear Plant, Unit 1 and Unit 2 Technical Specifications for Main Control Room Chiller Completion Time Extension (WBN-TS-23-13)2024-04-0404 April 2024 Application to Modify the Watts Bar Nuclear Plant, Unit 1 and Unit 2 Technical Specifications for Main Control Room Chiller Completion Time Extension (WBN-TS-23-13) IR 05000390/20244012024-04-0202 April 2024 – Security Baseline Inspection Report 05000390/2024401 and 05000391/2024401 - (Public) CNL-24-020, Clinch River, Sequoyah, Units 1 and 2, Watts Bar, Units 1 and 2, Request for Approval of Quality Assurance Program Description and Application to Revise the Technical Specifications Associated with QAPD Requirements2024-04-0101 April 2024 Clinch River, Sequoyah, Units 1 and 2, Watts Bar, Units 1 and 2, Request for Approval of Quality Assurance Program Description and Application to Revise the Technical Specifications Associated with QAPD Requirements CNL-24-007, Annual Insurance Status Report2024-03-27027 March 2024 Annual Insurance Status Report CNL-24-008, Guarantee of Payment of Deferred Premiums - 2023 Annual Report2024-03-27027 March 2024 Guarantee of Payment of Deferred Premiums - 2023 Annual Report 05000391/LER-2024-001, Automatic Reactor Trip Due to Main Generator Protection Relay Actuation2024-03-27027 March 2024 Automatic Reactor Trip Due to Main Generator Protection Relay Actuation CNL-24-025, Notice of Intent to Pursue License Renewal for Watts Bar Nuclear Plant, Unit 1 - Submittal Schedule2024-03-25025 March 2024 Notice of Intent to Pursue License Renewal for Watts Bar Nuclear Plant, Unit 1 - Submittal Schedule ML24081A0262024-03-21021 March 2024 Emergency Plan Implementing Procedure Revisions ML24079A0312024-03-19019 March 2024 Wb 2024-301, Corporate Notification Letter (210-day Ltr) 2024-09-05
[Table view] |
See also: IR 05000390/2008404
Text
OFFICIAL USE ONLY - SECURITY-RELATED INFORMATION
UNITED STATES
NUCLEAR REGULATORY COMMISSION
REGION II
SAM NUNN ATLANTA FEDERAL CENTER
61 FORSYTH STREET, SW, SUITE 23T85
ATLANTA, GEORGIA 30303-8931
July 30, 2008
EA-08-121
Tennessee Valley Authority
ATTN: Mr. William R. Campbell
Chief Nuclear Officer and
Executive Vice President
6A Lookout Place
1101 Market Street
Chattanooga, TN 37402-2801
SUBJECT: WATTS BAR NUCLEAR PLANT - NRC REPORT 05000390/2008404 AND
05000391/2008404
Dear Mr. Campbell:
This refers to the Nuclear Regulatory Commission=s (NRC) in-office inspection of Tennessee
Valley Authority=s (TVA) Watts Bar Nuclear Plant, completed on May 15, 2008. The results of
the inspection, including the identification of a finding that was preliminarily determined to be
greater than very low security significance (i.e., greater than Green as determined by the
Physical Protection Significance Determination Process), and an apparent violation, were
transmitted to you in NRC Inspection Report 05000390,391/2008402, dated May 21, 2008.
At your request, a Regulatory Conference was held on June 20, 2008, to further discuss your
views on this issue. During the meeting your staff described your assessment of the significance
of the finding, detailed corrective actions, and your root cause determination for the issue.
The enclosure documents a finding that was determined to be greater than very low security
significance (i.e., greater than Green as determined by the Physical Protection Significance
Determination Process). TVA subsequently corrected the deficiency.
You have 30 calendar days from the date of this letter to appeal the staff=s determination of
significance for the identified finding and violations. Such appeals will be considered to have
merit only if they meet the criteria given in NRC Inspection Manual Chapter 0609, Attachment 2.
Enclosure transmitted herewith contains Sensitive Unclassified Non-Safeguards
Information. When separated from enclosure, this transmittal document is decontrolled.
LIMITED INTERNAL
DISTRIBUTION PERMITTED
OFFICIAL USE ONLY - SECURITY RELATED INFORMATION
OFFICIAL USE ONLY - SECURITY-RELATED INFORMATION
TVA 2
You are required to respond to this letter and should follow the instructions specified in the
enclosed Notice when preparing your response.
Because plant performance for this issue has been determined to be in the regulatory response
band, we will use the NRC Action Matrix to determine the most appropriate NRC response for
this event. We will notify you, by separate correspondence, of that determination.
In accordance with 10 CFR 2.390 of the NRC=s ARules of Practice,@ a copy of this letter will be
available electronically for public inspection in the NRC Public Document Room or from the
Publicly Available Records (PARS) component of NRC=s document system (ADAMS). ADAMS
is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public
Electronic Reading Room). However, because of the security-related concerns contained in the
enclosures, and in accordance with 10 CFR 2.390, a copy of this letter=s enclosures will not be
available for public inspection.
Should you have any questions concerning this letter, please contact Mr. Kriss Kennedy,
Director, Division of Reactor Safety, at (404) 562-4601.
Sincerely,
/RA/
Luis A. Reyes
Regional Administrator
Docket Nos.: 50-390, 50-391
License Nos.: NPF-90, CPPR-92
Enclosures:
1. Inspection Report 05000390/2008404 and
05000391/2008404 (OUO/Security Related Information)
2. Notice of Violation (OUO/Security Related Information)
OFFICIAL USE ONLY - SECURITY RELATED INFORMATION
OFFICIAL USE ONLY - SECURITY RELATED INFORMATION
TVA 3
cc w/encls: 1101 Market Street
Ashok S. Bhatnagar Chattanooga, TN 37402-2801
Senior Vice President
Nuclear Generation Development and Michael D. Skaggs (WB2)
Construction Site Vice President
Tennessee Valley Authority Watts Bar Nuclear Plant
6A Lookout Place Tennessee Valley Authority
1101 Market Street P. O. Box 2000
Chattanooga, TN 37402-2801 Spring City, TN 37381
(Vacant) General Counsel
Vice President Tennessee Valley Authority
Nuclear Support 6A West Tower
Tennessee Valley Authority 400 West Summit Hill Drive
3R Lookout Place Knoxville, TN 37902
1101 Market Street
Chattanooga, TN 37402-2801 John C. Fornicola
General Manager
Walter M. Justice, II Nuclear Assurance
Interim Vice President Tennessee Valley Authority
Nuclear Engineering & Technical Services 3R Lookout Place
Tennessee Valley Authority 1101 Market Street
6A Lookout Place Soddy Daisy, TN 37384-2000
Chattanooga, TN 37402-2801
Robert H. Bryan, Jr. Michael J. Lorek
General Manager Plant Manager
Licensing and Industry Affairs Watts Bar Nuclear Plant
Tennessee Valley Authority Tennessee Valley Authority
4X Blue Ridge P.O. Box 2000
1101 Market Street Spring City, TN 37381
Chattanooga, TN 37402-2801
cc w/o encls:
Beth A. Wetzel County Executive
Manager 375 Church Street
Corporate Nuclear Licensing and Industry Suite 215
Affairs Dayton, TN 37321
Tennessee Valley Authority
4X Blue Ridge County Mayor
1101 Market Street P.O. Box 156
Chattanooga, TN 37402-2801 Decatur, TN 37322
James D. Smith
Manager
Licensing and Industry Affairs
Tennessee Valley Authority
Sequoyah Nuclear Plant
P.O. Box 2000
OFFICIAL USE ONLY - SECURITY RELATED INFORMATION
OFFICIAL USE ONLY - SECURITY-RELATED INFORMATION
TVA 4
cc w/o encls: Continued from Page 3
Lawrence E. Nanney
Director
TN Dept. of Environment & Conservation
Division of Radiological Health
3rd Floor, L&C Annex
401 Church Street
Nashville, TN 37243-1532
Masoud Bajestani
Vice President Watts Bar Unit 2
Watts Bar Nuclear Plant
Tennessee Valley Authority
Watts Bar Unit 2
P.O. Box 2000
Spring City, TN 37381
Ann Harris
341 Swing Loop
Rockwood, TN 37854
James H. Bassham
Director
Tennessee Emergency Management Agency
P.O. Box 41502
Nashville, TN 37204-150
OFFICIAL USE ONLY - SECURITY RELATED INFORMATION
_________________________
OFFICE RII:ORA RII:DRS RII:DRS RII:ORA OE NSIR
SIGNATURE /RA/ /RA SSparks for/ /RA/A /RA via email/ /RA via email/
NAME CEVANS JMUNDAY KKENNEDY VMCCREE R. Barnes R. Correia
DATE 7/15/2008 7/15/2008 7/15/2008 7/24/2008 7/21/2008
E-MAIL COPY? YES NO YES NO YES NO YES NO YES NO