EDISON° JSOUTHERN CALIFORNIA An EDISON INTERNATIONAL Company July 28, 2008 U. S. Nuclear Regulatory Commission Document Control Desk Washington, D.C. 20555

Subject:

Docket Nos. 50-361 and 50-362 Response to Regulatory Issue Summary (RIS) 2008-16 San Onofre Nuclear Generating Station, Units 2 and 3

Reference:

RIS 2008-16, "Preparation and Scheduling of Operator Licensing Examinations," dated June 27, 2008 Gentlemen:

This letter provides the Southern California Edison (SCE) response to U. S. Nuclear Regulatory Commission Regulatory Issue Summary 2008-16, "Preparation and Scheduling of Operator Licensing Examinations," dated June 27, 2008.

The schedule shown on NRC Form 536, "Operator Licensing Examination Data," is enclosed and provides SCE's best estimate to meet our operator licensing needs through calendar year 2012.

If you have any questions, please feel free to contact me or Mr. Clay E. Williams at (949) 368-6707.

Sincerely, Albert R. Hochevar Station Manager

Enclosure:

As Stated cc: E. E. Collins, Regional Administrator, NRC Region IV R. E. Lantz, Chief, Operations Branch, NRC Region IV N. Kalyanam, NRC Project Manager, San Onofre Units 2 and 3 G. G. Warnick, NRC Senior Resident Inspector, San Onofre Units 2 and 3 P.O. Box 128 C01 San Clemente, CA 92674-0 128 OR

NRC FORM 536 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO. 3150-0131 EXPIRES: 08/31/2008 (8-2005) Estimated burden per response to comply with this voluntary information collection request: 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />. This information collection is used to plan budgets and resources for operator examinations. Send comments regarding burden estimate to the Records and FOIA/Privacy Services Branch (T-5 F53), U.S.

OPERATOR LICENSING Nuclear Regulatory Commission, Washington, DC 20555-0001, or by intemet EXAMINATION DATA e-mail to infocollects@nrc.gov, and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-0131), Office of Management and Budget, Washington, DC 20503. If a means used to impose an information collection does not display a currently valid OMB control number, the NRC may not conduct or sponsor, and a person is not required to respond to, the information collection.

FACILITY NRC REGION SAN ONOFRE NUCLEAR GENERATING STATION, UNITS 2 AND 3 REGION IV A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY2009 cY 2010 cY2011 cY2012 ESTIMATED NUMBER OF LICENSEE-PREPARED EXAMINATIONS 1 ESTIMATED NUMBER OF NRC-PREPARED EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER cy 2009 cy 2010 cY2011 cY2012

.NUMBER OF REACTOR OPERATORS 12 12 12 12 NUMBER OF SENIOR REACTOR OPERATORS-INSTANT 6 6 9 6 NUMBER OF SENIOR REACTOR OPERATORS - UPGRADE 3 3 3 6 NUMBER OF SENIOR REACTOR OPERATORS - LIMITED 0 0 0 0 PROPOSED DATES PRIMARY DATE 10/5/09 10/4/10 10/3/11 10/1/12 ALTERNATE DATE 10/19/09 10/18/10 10/17/11 10/15/12 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY 2009 CY 2010 PROPOSED NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF 21 21 CANDIDATES NRC FORM 536 (8-2005) PRINTED ON RECYCLED PAPER