Letter Sequence Request |
---|
|
|
MONTHYEARNL-08-096, Request for Relief to Extend Inservice Inspection Interval for the Reactor Vessel Weld Examination and Request for License Amendment for Submittal of ISI Information and Analyses2008-07-0808 July 2008 Request for Relief to Extend Inservice Inspection Interval for the Reactor Vessel Weld Examination and Request for License Amendment for Submittal of ISI Information and Analyses Project stage: Request ML0820307962008-07-21021 July 2008 License Amendment Request for License Condition to Support Implementation of Extended In-Service Inspection Interval Project stage: Request ML0827603842008-10-0101 October 2008 Attachment 2, Marked Up Tech Spec Pages for License Amendment Request: Reporting of Reactor Vessel In-Service Inspection Information and Analyses in Support of Code Relief Request for Extension of Reactor Vessel.. Project stage: Request ML0827603832008-10-0101 October 2008 Attachment 1, Evaluation of the Proposed Change to License Amendment Request: Reporting of Reactor Vessel In-Service Inspection Information and Analyses in Support of Code Relief Request for Extension of Reactor Vessel.. Project stage: Request CP-200900009, Request for Relief to Extend the Unit 1 & 2 Inservice Inspection Interval for the Reactor Vessel Weld Examination and License Amendment Request 09-004 to Add License Condition for Submittal of ISI Information and Analyses2009-03-0404 March 2009 Request for Relief to Extend the Unit 1 & 2 Inservice Inspection Interval for the Reactor Vessel Weld Examination and License Amendment Request 09-004 to Add License Condition for Submittal of ISI Information and Analyses Project stage: Request ML0918907412009-07-0808 July 2009 Withdrawal of License Amendment Request: Reporting of Reactor Vessel Inservice Inspection Information and Analyses in Support of Code Relief Request for Extension of Reactor Vessel In-Service Inspection Interval Project stage: Withdrawal 2CAN100902, Request for Alternative ANO2-ISI-004 - Proposed Alternative to Extend the Third 10-Year Inservice Inspection Interval for Reactor Vessel Weld Examinations2009-10-29029 October 2009 Request for Alternative ANO2-ISI-004 - Proposed Alternative to Extend the Third 10-Year Inservice Inspection Interval for Reactor Vessel Weld Examinations Project stage: Request TMI-09-142, Request to Extend the Inservice Inspection Interval for Reactor Vessel Weld and Internal Examinations - Relief Requests RR-09-01 and RR-09-022009-10-29029 October 2009 Request to Extend the Inservice Inspection Interval for Reactor Vessel Weld and Internal Examinations - Relief Requests RR-09-01 and RR-09-02 Project stage: Request RC-11-0117, Request to Use Alternatives to ASME Code Requirements in VCSNS 3rd Ten Year Inservice Inspection Interval (RR-III-07) Risk-Informed Extension of Reactor Vessel In-Service Inspection Interval2011-08-16016 August 2011 Request to Use Alternatives to ASME Code Requirements in VCSNS 3rd Ten Year Inservice Inspection Interval (RR-III-07) Risk-Informed Extension of Reactor Vessel In-Service Inspection Interval Project stage: Other 2CAN041303, Additional Reactor Vessel Closure Head Weld Request for Alternative ANO2-ISI-004 Proposed Alternative to Extend the Third 10-Year Inservice Inspection Interval for Reactor Vessel Weld Examinations2013-04-24024 April 2013 Additional Reactor Vessel Closure Head Weld Request for Alternative ANO2-ISI-004 Proposed Alternative to Extend the Third 10-Year Inservice Inspection Interval for Reactor Vessel Weld Examinations Project stage: Request 2CAN111305, Unit 2, Response to Request for Additional Information Related to Relief Request ANO2-ISI-0042013-11-11011 November 2013 Unit 2, Response to Request for Additional Information Related to Relief Request ANO2-ISI-004 Project stage: Response to RAI AEP-NRC-2018-51, Request to Extend the Inservice Inspection Interval for Reactor Vessel Weld Examination - Relief Request ISIR-4-082018-08-0101 August 2018 Request to Extend the Inservice Inspection Interval for Reactor Vessel Weld Examination - Relief Request ISIR-4-08 Project stage: Request 2009-03-04
[Table View] |
|
---|
Category:Letter
MONTHYEARPNP 2024-014, Request for USNRC to Rescind Approved Exemption Requests for 140.11(a)(4) and 50.54(w)(1), Reduction of Insurances2024-10-0909 October 2024 Request for USNRC to Rescind Approved Exemption Requests for 140.11(a)(4) and 50.54(w)(1), Reduction of Insurances PNP 2024-037, Response to Requests for Additional Information Regarding the Proposed Reauthorization of Power Operations Under Renewed Facility Operating License Number DPR-0202024-10-0404 October 2024 Response to Requests for Additional Information Regarding the Proposed Reauthorization of Power Operations Under Renewed Facility Operating License Number DPR-020 ML24267A2962024-10-0101 October 2024 Summary of Conference Call Regarding Steam Generator Tube Inspections ML24263A1712024-09-20020 September 2024 Environmental Request for Additional Information ML24240A1692024-09-18018 September 2024 Cy 2023 Summary of Decommissioning Trust Fund Status ML24219A4202024-09-12012 September 2024 Change in Estimated Hours and Review Schedule for Licensing Actions Submitted to Support Resumption of Power Operations (Epids L-2023-LLE-0025, L-2023-LLM-0005, L-2023-LLA-0174, L-2024-LLA-0013, L-2024-LLA-0060, L-2024-LLA-0071) IR 05000255/20244022024-09-0606 September 2024 Public: Palisades Nuclear Plant - Decommissioning Security Inspection Report 05000255/2024402 PNP 2024-029, Notice of Payroll Transition at Palisades Nuclear Plant2024-08-15015 August 2024 Notice of Payroll Transition at Palisades Nuclear Plant IR 05000255/20240022024-08-0909 August 2024 NRC Inspection Report No. 05000255/2024002 PNP 2024-030, Update Report for Holtec Decommissioning International Fleet Decommissioning Quality Assurance Program Rev. 3 and Palisades Transitioning Quality Assurance Plan, Rev 02024-08-0202 August 2024 Update Report for Holtec Decommissioning International Fleet Decommissioning Quality Assurance Program Rev. 3 and Palisades Transitioning Quality Assurance Plan, Rev 0 PNP 2024-032, Supplement to License Amendment Request to Revise Selected Permanently Defueled Technical Specifications Administrative Controls to Support Resumption of Power Operations2024-07-31031 July 2024 Supplement to License Amendment Request to Revise Selected Permanently Defueled Technical Specifications Administrative Controls to Support Resumption of Power Operations ML24206A0572024-07-25025 July 2024 PRM-50-125 - Letter to Alan Blind; Docketing of Petition for Rulemaking and Sufficiency Review Status (10 CFR Part 50) PNP 2024-033, Response to Request for Additional Information - License Amendment Request to Revise the Palisades Nuclear Plant Site Emergency Plan to Support Resumption of Power Operations2024-07-24024 July 2024 Response to Request for Additional Information - License Amendment Request to Revise the Palisades Nuclear Plant Site Emergency Plan to Support Resumption of Power Operations PNP 2024-031, Response to RIS 2024-01, Preparation and Scheduling of Operator Licensing Examinations2024-07-18018 July 2024 Response to RIS 2024-01, Preparation and Scheduling of Operator Licensing Examinations IR 05000255/20240112024-07-15015 July 2024 Nuclear Plant - Restart Inspection Report 05000255/2024011 PNP 2024-027, Supplement to License Amendment Request to Revise Renewed Facility Operating License and Permanently Defueled Technical Specifications to Support Resumption of Power Operations2024-07-0909 July 2024 Supplement to License Amendment Request to Revise Renewed Facility Operating License and Permanently Defueled Technical Specifications to Support Resumption of Power Operations ML24183A1382024-07-0202 July 2024 Tribal Letter - Lac Du Flambeau Band of Lake Superior Chippewa Indians ML24137A0142024-07-0202 July 2024 OEDO-24-00011 - 2.206 Petition for Misuse of Palisades Decommissioning Trust Fund (EPID L-2023-CRS-0008) - Letter ML24183A1492024-07-0101 July 2024 Tribal Letter - Pokagon Band of Potawatomi Indians ML24156A0222024-07-0101 July 2024 Initiation of Scoping Process to Prepare an Environmental Assessment for the Environmental Review of Holtec Decommissioning International, Llc’S Licensing and Regulatory Requests for Reauthorization of Power Operations at Palisades EPID L-2 ML24183A1552024-07-0101 July 2024 Tribal Letter - Red Lake Band of Chippewa Indians ML24183A1542024-07-0101 July 2024 Tribal Letter Red Cliff Band of Lake Superior Chippewa Indians ML24172A0032024-07-0101 July 2024 Letter to L. Powers, Mackinac Bands of Chippewa and Ottawa Indians Re Initiation of Scoping Process for Environ Review Holtec Decommissioning Intl, LLC Request for Reauthorization of Power Ops-Palisades ML24183A1332024-07-0101 July 2024 Tribal Letter-Forest County Potawatomi Community ML24183A1582024-07-0101 July 2024 Tribal Letter Sault Ste. Marie Tribe of Chippewa Indians ML24183A1302024-07-0101 July 2024 Tribal Letter-Chippewa Cree Indians of the Rocky Boys Reservation ML24183A1282024-07-0101 July 2024 Tribal letter-Bay Mills Indian Community ML24183A1532024-07-0101 July 2024 Tribal Letter Quechan Tribe of the Fort Yuma Indian Reservation ML24183A1572024-07-0101 July 2024 Tribal Letter - Saint Croix Chippewa Indians of Wisconsin ML24183A1462024-07-0101 July 2024 Tribal letter-Mille Lacs Band of Ojibwe ML24183A1422024-07-0101 July 2024 Tribal Letter-Little Traverse Bay Bands of Odawa Indians ML24183A1312024-07-0101 July 2024 Tribal Letter-Citizen Potawatomi Nation ML24163A0552024-07-0101 July 2024 Rebecca Held Knoche NOAA-Palisades-NOI to Conduct Scoping Process and Prepare an EA - EPID No. L-2024-LNE-0003-Docket No. 50-0255 ML24163A2392024-07-0101 July 2024 Sara Thompson, Michigan DNR-Palisades-NOI to Conduct Scoping Process and Prepare an EPID No. L-2024-LNE-0003-Docket No. 50-0255 ML24155A0102024-07-0101 July 2024 Quentin L. Messer Jr., Michigan Econ-Palisades-NOI to Conduct Scoping Process and Prep an EA-EPID No. L-2024-LNE-0003 Docket No.50-0255P ML24155A0032024-07-0101 July 2024 Kathy Kowal, Us EPA Region 5-Palisades-NOI to Cibdyct Scoping Process and Prepare an EA EPID L-2024-LNE-0003 ML24163A0832024-07-0101 July 2024 Ltr to R Schumaker SHPO Re Initiation of Scoping Process, Section 106 Consult for Env Rev of HDI, LLC Request for Reauth of Power Operations at Palisades Nuclear Plant ML24183A1342024-07-0101 July 2024 Tribal Letter-Grand Portage Band of Lake Superior Chippewa ML24183A1392024-07-0101 July 2024 Tribal Letter-Lac Vieux Desert Band of Lake Superior Chippewa Indians ML24183A1272024-07-0101 July 2024 Tribal Letter-Bad River Band of the Lake Superior Tribe of Chippewa ML24183A1412024-07-0101 July 2024 Tribal Letter-Little River Band of Ottawa Indians ML24163A1922024-07-0101 July 2024 Jeremy Rubio, Dept of Env, Great Lakes and Energy, Kalamazoo District-Palisades-NOI to Conduct Scoping Process and Prepare an EA EPID No. L-2024-LNE-0003 Docket No.50-0255 ML24183A1322024-07-0101 July 2024 Tribal Letter-Fond Du Lac Band of Lake Superior Chippewa ML24183A1592024-07-0101 July 2024 Tribal letter-Sokaogon Chippewa Community ML24163A0822024-07-0101 July 2024 Ltr to J Loichinger Achp Re Initiation of Scoping Process, Section 106 Consult for Env Rev of HDI, LLC Request for Reauth of Power Operations at Palisades Nuclear Plant ML24183A1252024-07-0101 July 2024 Letter to G. Gould, Swan Creek Black River Confederated Ojibwa-Init of Scoping Process for the Env Rev of Holtec Decommissioning Intl, LLC Request for Reauth of Power Ops at Palisades ML24183A1352024-07-0101 July 2024 Tribal Letter-Hannahville Indian Community ML24183A1442024-07-0101 July 2024 Tribal Letter - Menominee Indian Tribe of Wisconsin ML24183A1502024-07-0101 July 2024 Tribal Letter - Prarie Band Potawatomi Nation ML24183A1452024-07-0101 July 2024 Tribal Letter - Miami Tribe of Oklahoma 2024-09-06
[Table view] Category:License-Application for Facility Operating License (Amend/Renewal) DKT 50
MONTHYEARPNP 2024-027, Supplement to License Amendment Request to Revise Renewed Facility Operating License and Permanently Defueled Technical Specifications to Support Resumption of Power Operations2024-07-0909 July 2024 Supplement to License Amendment Request to Revise Renewed Facility Operating License and Permanently Defueled Technical Specifications to Support Resumption of Power Operations PNP 2024-003, License Amendment Request to Approve the Biasi Critical Heat Flux (CHF) Correlation for Use with the Palisades Main Steam Line Break (MSLB) Analysis2024-05-24024 May 2024 License Amendment Request to Approve the Biasi Critical Heat Flux (CHF) Correlation for Use with the Palisades Main Steam Line Break (MSLB) Analysis PNP 2024-005, License Amendment Request to Revise the Palisades Nuclear Plant Site Emergency Plan to Support Resumption of Power Operations2024-05-0101 May 2024 License Amendment Request to Revise the Palisades Nuclear Plant Site Emergency Plan to Support Resumption of Power Operations PNP 2024-001, License Amendment Request to Revise Selected Permanently Defueled Technical Specifications Administrative Controls to Support Resumption of Power Operations2024-02-0909 February 2024 License Amendment Request to Revise Selected Permanently Defueled Technical Specifications Administrative Controls to Support Resumption of Power Operations PNP 2023-030, License Amendment Request to Revise Renewed Facility Operating License and Permanently Defueled Technical Specifications to Support Resumption of Power Operations2023-12-14014 December 2023 License Amendment Request to Revise Renewed Facility Operating License and Permanently Defueled Technical Specifications to Support Resumption of Power Operations PNP 2022-031, License Amendment Request, Revise License Condition to Eliminate Cyber Security Plan Requirements2022-09-14014 September 2022 License Amendment Request, Revise License Condition to Eliminate Cyber Security Plan Requirements PNP 2022-016, License Amendment Request: Proposed Permanently Defueled Emergency Plan and Permanently Defueled Emergency Action Level Scheme2022-07-12012 July 2022 License Amendment Request: Proposed Permanently Defueled Emergency Plan and Permanently Defueled Emergency Action Level Scheme ML21152A1112021-06-0101 June 2021 Proposed Changes (mark-up) to Palisades Plant - Appendix a Technical Specifications, and Appendix B Environmental Protection Plan Pages ML21152A1122021-06-0101 June 2021 Page Change Instructions and Retyped Pages for the Palisades Plant Appendix a Permanently Defueled Technical Specifications and Appendix B Environmental Protection Plan ML21152A1132021-06-0101 June 2021 Palisade Nuclear Plant - Proposed Technical Specifications Bases Changes ML21152A1102021-06-0101 June 2021 Evaluation of the Proposed Changes PNP 2020-042, and Big Rock Point Application for Order Consenting to Transfers of Control of Licenses and Approving Conforming License Amendments2020-12-23023 December 2020 and Big Rock Point Application for Order Consenting to Transfers of Control of Licenses and Approving Conforming License Amendments RS-19-040, Application to Adopt TSTF-563, Revise Instrument Testing Definitions to Incorporate the Surveillance Frequency Control Program2019-06-25025 June 2019 Application to Adopt TSTF-563, Revise Instrument Testing Definitions to Incorporate the Surveillance Frequency Control Program ML19149A3042019-05-28028 May 2019 Enclosure Attachment 1 (Continued) to Pnp 2019-028: Operating License Page Change Instructions and Retyped Renewed Facility Operating License Pages ML19149A3022019-05-28028 May 2019 Enclosure to Pnp 2019-028: Response to Request for Additional Information - License Amendment Request to Revise Existing Facility Operating License Conditions Regarding NFPA 805 Modifications ML19149A3032019-05-28028 May 2019 Enclosure Attachment 1 to Pnp 2019-028: Renewed Facility Operating License Page Markups PNP 2019-007, License Amendment Request to Change the Full Compliance Implementation Date for the Fire Protection Program Transition License Condition for Required Modifications2019-03-0808 March 2019 License Amendment Request to Change the Full Compliance Implementation Date for the Fire Protection Program Transition License Condition for Required Modifications CNRO-2019-00003, Application to Revise Technical Specifications to Adopt TSTF-529 11 Clarify Use and Application Rules, 11 Revision 42019-01-31031 January 2019 Application to Revise Technical Specifications to Adopt TSTF-529 11 Clarify Use and Application Rules, 11 Revision 4 PNP 2018-040, License Amendment Request to Revise Existing Facility Operating License Conditions Regarding NFPA 805 Modifications - Proposed Renewed Facility Operating License Page Changes (Markup)2018-11-0101 November 2018 License Amendment Request to Revise Existing Facility Operating License Conditions Regarding NFPA 805 Modifications - Proposed Renewed Facility Operating License Page Changes (Markup) ML18305B3222018-11-0101 November 2018 License Amendment Request to Revise Existing Facility Operating License Conditions Regarding NFPA 805 Modifications - Proposed Operating License Change ML18305B3212018-11-0101 November 2018 License Amendment Request to Revise Existing Facility Operating License Conditions Regarding NFPA 805 Modifications ML18270A3232018-09-27027 September 2018 Attachment 2: Probabilistic Risk Assessment Technical Adequacy ML18270A3262018-09-27027 September 2018 Attachment 5: Proposed Technical Specification Bases Changes ML18270A3252018-09-27027 September 2018 Attachment 4: Page Change Instructions and Revised Pages, and Appendix a Technical Specifications ML18270A3222018-09-27027 September 2018 Attachment 1: Description and Evaluation of Technical Specifications Changes ML18270A3282018-09-27027 September 2018 Attachment 7: Traveler TSTF-425 Versus Pnp RFOL SR Applicability Cross Reference Table ML18270A3272018-09-27027 September 2018 Attachment 6: No Significant Hazards Consideration PNP 2018-025, License Amendment Request - Application to Revise Technical Specifications to Adopt TSTF-425, Revision 3, Relocate Surveillance Frequencies to Licensee Control- Risk Informed Technical Specification Task Force (RITSTF) Initiative 5b.2018-09-27027 September 2018 License Amendment Request - Application to Revise Technical Specifications to Adopt TSTF-425, Revision 3, Relocate Surveillance Frequencies to Licensee Control- Risk Informed Technical Specification Task Force (RITSTF) Initiative 5b. ML18270A3242018-09-27027 September 2018 Attachment 3: Proposed Changes and Appendix a Technical Specifications Pages ML18152A9292018-05-30030 May 2018 License Amendment Request to Revise Emergency Diesel Generator Degraded Voltage Surveillance Requirement PNP 2018-004, Supplement to License Amendment Request to Change the Full Compliance Implementation Date for the Fire Protection Program Transition License Condition for Required Modifications2018-01-24024 January 2018 Supplement to License Amendment Request to Change the Full Compliance Implementation Date for the Fire Protection Program Transition License Condition for Required Modifications PNP 2017-066, License Amendment Request to Change the Full Compliance Implementation Date for the Fire Protection Program Transition License Condition for Required Modifications2017-11-0101 November 2017 License Amendment Request to Change the Full Compliance Implementation Date for the Fire Protection Program Transition License Condition for Required Modifications PNP 2017-059, License Amendment Request Supplement - Cyber Security Plan Implementation Schedule2017-10-17017 October 2017 License Amendment Request Supplement - Cyber Security Plan Implementation Schedule PNP 2017-035, License Amendment Request - Administrative Controls for a Permanently Defueled Condition2017-07-27027 July 2017 License Amendment Request - Administrative Controls for a Permanently Defueled Condition PNP 2017-007, License Amendment Request, Cyber Security Plan Implementation Schedule2017-03-30030 March 2017 License Amendment Request, Cyber Security Plan Implementation Schedule PNP 2016-046, License Amendment Request for Editorial and Administrative Changes to Technical Specifications2016-11-0909 November 2016 License Amendment Request for Editorial and Administrative Changes to Technical Specifications PNP 2016-049, License Amendment Request: Control Rod Drive Exercise Surveillance2016-08-22022 August 2016 License Amendment Request: Control Rod Drive Exercise Surveillance PNP 2016-005, License Amendment Request - Application to Revise Technical Specifications to Adopt TSTF-545, Revision 3, TS Inservice Testing Program Removal and Clarify SR Usage Rule Application to Section 5.5 Testing.2016-07-11011 July 2016 License Amendment Request - Application to Revise Technical Specifications to Adopt TSTF-545, Revision 3, TS Inservice Testing Program Removal and Clarify SR Usage Rule Application to Section 5.5 Testing. PNP 2016-001, License Amendment Request - Revision to the Requirements for Steam Generator Tube Inspections and Repair Criteria in the Cold Leg Tube Sheet Region2016-03-0303 March 2016 License Amendment Request - Revision to the Requirements for Steam Generator Tube Inspections and Repair Criteria in the Cold Leg Tube Sheet Region PNP 2015-035, License Amendment Request - Cyber Security Plan Implementation Schedule2015-06-11011 June 2015 License Amendment Request - Cyber Security Plan Implementation Schedule PNP 2014-111, Revised License Condition - License Amendment Request to Adopt NFPA 805 Performance-Based Standard for Fire Protection for Light Water Reactors2014-12-18018 December 2014 Revised License Condition - License Amendment Request to Adopt NFPA 805 Performance-Based Standard for Fire Protection for Light Water Reactors PNP 2014-091, Supplement to License Amendment Request to Revise Emergency Response Organization Staff Augmentation Response Times2014-12-0909 December 2014 Supplement to License Amendment Request to Revise Emergency Response Organization Staff Augmentation Response Times ML14237A1442014-12-0808 December 2014 Issuance of Amendment Cyber Security Plan Implementation Schedule PNP 2014-049, License Amendment Request to Implement 10 CFR 50.61 a, Alternate Fracture Toughness Requirements for Protection Against Pressurized Thermal Shock Events.2014-07-29029 July 2014 License Amendment Request to Implement 10 CFR 50.61 a, Alternate Fracture Toughness Requirements for Protection Against Pressurized Thermal Shock Events. ML14211A5252014-07-29029 July 2014 WCAP-17628-NP, Revision 1, Palisades, Alternate Pressurized Thermal Shock (PTS) Rule Evaluation. PNP 2014-042, License Amendment Request - Application to Revise Technical Specifications to Adopt TSTF-426, Revise or Add Actions to Preclude Into LCO 3.0.3 - RITSTF Initiatives 6b & 6c, Using the Consolidated Line Item Improvement Process2014-06-11011 June 2014 License Amendment Request - Application to Revise Technical Specifications to Adopt TSTF-426, Revise or Add Actions to Preclude Into LCO 3.0.3 - RITSTF Initiatives 6b & 6c, Using the Consolidated Line Item Improvement Process PNP 2013-086, License Amendment Request - Cyber Security Plan Implementation Schedule2013-12-30030 December 2013 License Amendment Request - Cyber Security Plan Implementation Schedule PNP 2013-044, License Amendment Request to Revise Emergency Response Organization Staff Augmentation Response Times2013-06-25025 June 2013 License Amendment Request to Revise Emergency Response Organization Staff Augmentation Response Times PNP 2012-074, License Amendment Request - Technical Specifications Change to Add LCO 3.0.8 on the Lnoperability of Snubbers2012-09-0606 September 2012 License Amendment Request - Technical Specifications Change to Add LCO 3.0.8 on the Lnoperability of Snubbers PNP 2012-046, License Amendment Request - Cyber Security Plan Implementation Schedule Milestones2012-06-20020 June 2012 License Amendment Request - Cyber Security Plan Implementation Schedule Milestones 2024-07-09
[Table view] |
Text
Entergy Nuclear Operations, Inc.
Palisades Nuclear Plant Entergy 27780 Blue Star Memorial Highway Covert, Ml 49043 Tel 269 764 2000 July 21, 2008 10 CFR 50.90 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington , DC 20555-0001 Palisades Nuclear Plant Docket 50-255 License No. DPR-20 License Amendment Request for License Condition to Support Implementation of Extended In-Service Inspection Interval
Reference:
Letter from NRC to Mr. Gordon Bischoff, Manager Owners Group Program Management Office, "Final Safety Evaluation for Pressurized Water Reactor Owners Group (PWROG) Topical Report (TR)
WCAP-16168-NP, Revision 2, `Risk-Informed Extension of the Reactor Vessel In-Service Inspection Interval,' (TAC No. MC9768)," dated May 8, 2008 (ADAMS Accession numbers ML081060051 and ML081060045)
Dear Sir or Madam:
Pursuant to 10 CFR 50.90, Entergy Nuclear Operations, Inc (ENO) requests Nuclear Regulatory Commission (NRC) review and approval of a proposed license amendment to the renewed facility operating license for the Palisades Nuclear Plant. The license amendment is needed to support a proposed change to the in-service inspection program that is based on topical report WCAP-16168-NP-A, Revision 2, "Risk-Informed Extension of the Reactor Vessel In-Service Inspection Interval." In the referenced safety evaluation of the topical report, the NRC required licensees to amend their licenses to require that the information and analyses requested in Section (e) of the final 10 CFR 50.61 a (or the proposed 10 CFR 50.61 a, given in 72 FR 56275 prior to issuance of the final 10 CFR 50.61 a) be submitted for NRC staff review and approval within one year of completing the required reactor vessel weld inspection. ENO proposes to add a new license condition to provide this information. The NRC also required licensees to submit a request for a proposed alternative, conforming with 10 CFR 50.55a(a)(3)(i), to extend the in-service inspection interval. ENO is submitting that request separately and concurrently with this proposed license amendment request.
Document Control Desk Page 2 provides a detailed description of the proposed change, background and technical analysis, No Significant Hazards Consideration Determination, and Environmental Review Consideration. Enclosure 2 provides the revised renewed facility operating license page reflecting the proposed change. The proposed change is incorporated on new license page 5b and, as a result, no markup pages are provided.
ENO requests approval of the proposed license amendment by March 2, 2009, and that the amendment be implemented within 60 days.
By letter dated May 5, 2008, ENO requested NRC review and approval of a proposed license amendment to DPR-20 to correct an error generated when the renewed facility operating license was created, and to remove several outdated license conditions. The placement of existing license conditions and the proposed new license condition could be affected when the license amendment request from May 2008 is approved. ENO will work with the NRC project manager, as necessary, to coordinate the changes to the operating license.
A copy of this request has been provided to the designated representative of the State of Michigan.
Summary of Commitments This letter contains no new commitments and no revision to existing commitments.
I declare under penalty of perjury that the foregoing is true and correct. Executed on July 21, 2008.
s op er J. Sc^rz Site Vice President Palisades Nuclear Plant Enclosures (2)
CC Administrator, Region III, USNRC Project Manager, Palisades, USNRC Resident Inspector, Palisades, USNRC
ENCLOSURE 1 DESCRIPTION OF REQUESTED CHANGES
1.0 DESCRIPTION
Entergy Nuclear Operations, Inc (ENO ) requests Nuclear Regulatory Commission (NRC) review and approval of a proposed license amendment to the renewed facility operating license for the Palisades Nuclear Plant (PNP).
The license amendment is needed to support a proposed change to the in-service inspection program that is based on topical report (TR)
WCAP -1 6168-NP-A, Revision 2, "Risk-Informed Extension of the Reactor Vessel In-Service Inspection Interval." In the safety evaluation (SE) of the TR (Reference 1), the NRC required licensees to amend their licenses to require that the information and analyses requested in Section (e) of the final 10 CFR 50 . 61 a (or the proposed 10 CFR 50.61 a, given in 72 FR 56275 prior to issuance of the final 10 CFR 50.61 a) be submitted for NRC staff review and approval within one year of completing the required reactor vessel weld inspection. ENO proposes to add a new license condition to provide this information . The NRC also required licensees to submit a request for a proposed alternative, conforming with 10 CFR 50.55a(a)(3)(i), to extend the in-service inspection interval. ENO is submitting that request separately and concurrently with this proposed license amendment request.
2.0 PROPOSED CHANGE
ENO proposes to revise renewed facility operating license DPR-20 to add the following new license condition 2.C.(8):
(8) Upon implementation of Amendment 2xx, within one .year of completing each of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code (ASME Code),Section XI, Category B-A and B-D reactor vessel weld inspections, submit information and analyses requested in Section (e) of the final 10 CFR 50.61 a (or the proposed 10 CFR 50.61 a, given in 72 FR 56275 prior to issuance of the final 10 CFR 50.61 a) to the NRC.
3.0 BACKGROUND
By letter dated May 8, 2008 (Reference 1), the NRC indicated that WCAP-16168-NP-A, Revision 2, is acceptable for referencing in license amendment requests for pressurized water reactor plants in accordance with the limitations and conditions in the SE. ENO submitted a request for a proposed alternative pursuant to 10 CFR 50.55(a)(3)(i) to extend the inspection interval for reactor vessel pressure retaining welds, examination category B-A and B-D.
Additionally, in accordance with the SE, ENO is submitting this license amendment request for PNP.
Page 1 of 4
4.0 TECHNICAL ANALYSIS
The applicable NRC SE condition and the action ENO has taken to address it are:
Within one year of completing each of the ASME Code, Section Xl, Category B-A and B-D [reactor vessel] RV weld inspections required in the proposed ISI interval, the licensee must provide the information and analyses requested in Section (e) of the final 10 CFR 50.61 a (or Alternative fracture toughness requirements for protection against pressurized thermal shock , in Enclosure 1 to the proposed rulemaking in SECY-07-0104, Reference 12, given in 72 FR 56275 prior to issuance of the final 10 CFR 50.61 a). Licensees that do not implement 10 CFR 50.61 a must amend their licenses to require that the information and analyses requested in Section (e) of the final 10 CFR 50.61 a (or the proposed 10 CFR 50.61 a, given in 72 FR 56275 prior to issuance of the final 10 CFR 50.61 a) will be submitted for NRC staff review and approval.
The amendment to the license shall be submitted at the same time as the request for alternative.
The proposed license condition 2.C.(8) in this amendment request includes all required elements listed.
The combination of the proposed alternative pursuant to 10 CFR 50.55a(a)(3)(i) and the proposed license condition in this amendment request conforms to the conditions and limitations imposed by the NRC SE for WCAP-16168-NP-A, Revision 2 (Reference 1). Therefore, these proposed changes will have no adverse impact on plant safety.
5.0 REGULATORY SAFETY ANALYSIS 5.1 No Significant Hazards Consideration Entergy Nuclear Operations, Inc (ENO) has evaluated whether or not a significant hazards consideration is involved with the proposed amendment by focusing on the three standards set forth in 10 CFR 50.92, "Issuance of Amendment," as discussed below:
Does the proposed amendment involve a significant increase in the probability or consequences of an accident previously evaluated?
Response: No.
Page 2 of 4
The proposed amendment changes the renewed facility operating license by adding a license condition to require that the information and analyses requested in Section (e) of the final 10 CFR 50.61 a (or the proposed 10 CFR 50.61 a, given in 72 FR 56275 prior to issuance of the final 10 CFR 50.61 a) will be submitted for NRC staff review and approval within one year of completing the required reactor vessel weld inspection. The proposed amendment does not involve operation of the required structures, systems or components (SSCs) in a manner or configuration different from those previously recognized or evaluated.
The proposed changes are administrative and have no impact on plant operation or equipment.
Therefore, operation of the facility in accordance with the proposed amendment would not involve a significant increase in the probability or consequences of an accident previously evaluated.
- 2. Does the proposed amendment create the possibility of a new or different kind of accident from any accident previously evaluated?
Response: No.
The proposed license amendment does not involve a physical alteration of any SSC or change the way any SSC is operated. The proposed license amendment does not involve operation of any required SSCs in a manner or configuration different from those previously recognized or evaluated.
The proposed changes are administrative and have no impact on plant operation or equipment.
Therefore, the proposed amendment does not create the possibility of a new or different kind of accident from any accident previously evaluated.
- 3. Does the proposed amendment involve a significant reduction in a margin of safety?
Response: No.
The proposed changes are administrative and have no impact on plant operation or equipment or on any margin of safety.
Therefore, the proposed amendment would not involve a significant reduction in a margin of safety.
Based on the evaluation above, ENO concludes that the proposed amendment presents no significant hazards consideration under the standards set forth in Page 3 of 4
10 CFR 50.92(c), and, accordingly, a finding of "no significant hazards consideration" is justified.
5.2 Applicable Regulatory Requirements/Criteria The proposed changes have been evaluated to determine whether applicable regulations and requirements continue to be met. The proposed change does not require relief from other regulatory requirements and does not affect conformance with any General Design Criterion differently than described in the Final Safety Analysis Report.
In conclusion, based on the considerations described above, (1) there is reasonable assurance that the health and safety of the public will not be endangered by operation in the proposed manner, (2) such activities will be conducted in compliance with the Commission's regulations, and (3) the issuance of the amendment will not be inimical to the common defense and security or to the health and safety of the public.
6.0 ENVIRONMENTAL CONSIDERATION
ENO has determined that the proposed amendment is confined to (i) changes to surety, insurance, and/or indemnity requirements, or (ii) changes to recordkeeping, reporting, or administrative procedures or requirements.
Accordingly, the proposed amendment meets the eligibility criterion for categorical exclusion set forth in 10 CFR 51.22(c)(10). Therefore, pursuant to 10 CFR 51.22(b), no environmental impact statement or environmental assessment need be prepared in connection with the proposed amendment.
7.0 REFERENCES
Letter from NRC to Mr. Gordon Bischoff, Manager Owners Group Program Management Office, "Final Safety Evaluation for Pressurized Water Reactor Owners Group (PWROG) Topical Report (TR)
WCAP-16168-NP, Revision 2, `Risk-Informed Extension of the Reactor Vessel In-Service Inspection Interval,' (TAC No. MC9768)," dated May 8, 2008 (ADAMS Accession numbers ML081060051 and ML081060045).
Page 4 of 4
ENCLOSURE 2 LICENSE AMENDMENT REQUEST FOR LICENSE CONDITION TO SUPPORT IMPLEMENTATION OF EXTENDED IN-SERVICE INSPECTION INTERVAL RENEWED FACILITY OPERATING LICENSE PAGE CHANGE INSTRUCTIONS AND REVISED RENEWED FACILITY OPERATING LICENSE PAGE 5b (shown on facsimile license page) 2 Pages Follow
ATTACHMENT TO LICENSE AMENDMENT NO.
RENEWED FACILITY OPERATING LICENSE NO . DPR-20 DOCKET NO. 50-255 Remove the following pages of renewed facility operating license DPR-20 and replace with the attached revised pages. The revised pages are identified by amendment number and contain marginal lines indicating the areas of change.
REMOVE INSERT NA Operating License, Page 5b*
- Coordinate new page(s) with license amendment request to Correct Renewed Facility Operating License (ADAMS accession # MI_081270068)
-5b-(8) Upon implementation of Amendment 2xx, within one year of completing each of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code (ASME Code),Section XI, Category B-A and B-D reactor vessel weld inspections, submit information and analyses requested in Section (e) of the final 10 CFR 50.61 a (or the proposed 10 CFR 50.61 a, given in 72 FR 56275 prior to issuance of the final 10 CFR 50.61 a) to the NRC.
Renewed License No. DPR-20 Amendment No. 2xx