Request for Additional Information, Relief Request CRR-13 Associated with the First and Second Containment Inservice Inspection Intervals
ML081890277
Person / Time
Site: Peach Bottom  
Issue date: 07/09/2008
From: John Hughey
NRC/NRR/ADRO/DORL/LPLI-2
To: Pardee C
Exelon Generation Co
Hughey J, NRR/DORL, 301-415-3204
References
TAC MD8308, TAC MD8309
Download: ML081890277 (5)


Text

July 9, 2008 Mr. Charles G. Pardee Chief Nuclear Officer and Senior Vice President Exelon Generation Company, LLC 200 Exelon Way Kennett Square, PA 19348

SUBJECT:

PEACH BOTTOM ATOMIC POWER STATION, UNITS 2 AND 3: REQUEST FOR ADDITIONAL INFORMATION REGARDING RELIEF REQUEST CRR-13 ASSOCIATED WITH THE FIRST AND SECOND CONTAINMENT INSERVICE INSPECTION INTERVALS (TAC NOS. MD8308 AND MD8309)

Dear Mr. Pardee:

By letter to the Nuclear Regulatory Commission (NRC) dated February 29, 2008 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML080640587), Exelon Generation Company, LLC, (Exelon) submitted Relief Request CRR-13 associated with the first and second Containment Inservice Inspection intervals for Peach Bottom Atomic Power Station, Units 2 and 3. The NRC staff has reviewed the request submitted by the licensee and has identified a need for additional information as set forth in the Enclosure.

The draft questions were sent to Tom Loomis, from your staff, to ensure that the questions were understandable, the regulatory basis for the questions was clear, and to determine if the information was previously docketed. On June 25, 2008, Mr. Loomis indicated that Exelon will submit a response by August 6, 2008. Please note that if you do not respond to this letter by the agreed-upon date or provide an acceptable alternate date in writing, we may reject your application for amendment under the provisions of Title 10 of the Code of Federal Regulations, Section 2.108. If you have any questions, please contact John Hughey at (301) 415-3204.

Sincerely,

/ra/

John D. Hughey, Project Manager Plant Licensing Branch I-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-277 and 50-278 cc: See next page

July 9, 2008 Mr. Charles G. Pardee Chief Nuclear Officer and Senior Vice President Exelon Generation Company, LLC 200 Exelon Way Kennett Square, PA 19348

SUBJECT:

PEACH BOTTOM ATOMIC POWER STATION, UNITS 2 AND 3: REQUEST FOR ADDITIONAL INFORMATION REGARDING RELIEF REQUEST CRR-13 ASSOCIATED WITH THE FIRST AND SECOND CONTAINMENT INSERVICE INSPECTION INTERVALS (TAC NOS. MD8308 AND MD8309)

Dear Mr. Pardee:

By letter to the Nuclear Regulatory Commission (NRC) dated February 29, 2008 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML080640587), Exelon Generation Company, LLC, (Exelon) submitted Relief Request CRR-13 associated with the first and second Containment Inservice Inspection intervals for Peach Bottom Atomic Power Station, Units 2 and 3. The NRC staff has reviewed the request submitted by the licensee and has identified a need for additional information as set forth in the Enclosure.

The draft questions were sent to Tom Loomis, from your staff, to ensure that the questions were understandable, the regulatory basis for the questions was clear, and to determine if the information was previously docketed. On June 25, 2008, Mr. Loomis indicated that Exelon will submit a response by August 6, 2008. Please note that if you do not respond to this letter by the agreed-upon date or provide an acceptable alternate date in writing, we may reject your application for amendment under the provisions of Title 10 of the Code of Federal Regulations, Section 2.108. If you have any questions, please contact John Hughey at (301) 415-3204.

Sincerely,

/ra/

John D. Hughey, Project Manager Plant Licensing Branch I-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-277 and 50-278 cc: See next page DISTRIBUTION:

PUBLIC RidsNrrPMJHughey Resource RidsNrrLAABaxter Resource LPLI-2 R/F GThomas, NRR RidsRgn1MailCenter Resource RidsNrrDorlLpl1-2 Resource RidsOgcRp Resource RidsAcrsAcnw_MailCTR Resource RidsNrrDeEmcb Resource HAshar, NRR ADAMS Accession Number: ML081890277

  • by memo dated June 11, 2008 OFFICE LPL1-2/PM LPL1-2/LA EMCB/BC LPL1-2/BC NAME JHughey ABaxter KManloy*

HChernoff DATE 7/9/2008 7/9/2008 06/11/2008 7/9/2008 OFFICIAL RECORD COPY

Peach Bottom Atomic Power Station, Unit Nos. 2 and 3 cc:

Site Vice President Peach Bottom Atomic Power Station Exelon Generation Company, LLC 1848 Lay Road Delta, PA 17314 Plant Manager Peach Bottom Atomic Power Station Exelon Generation Company, LLC 1848 Lay Road Delta, PA 17314 Regulatory Assurance Manager Peach Bottom Atomic Power Station Exelon Generation Company, LLC 1848 Lay Road Delta, PA 17314 Chief Operating Officer (COO)

Exelon Nuclear Exelon Generation Company, LLC 4300 Winfield Road Warrenville, IL 60555 Resident Inspector U.S. Nuclear Regulatory Commission Peach Bottom Atomic Power Station P.O. Box 399 Delta, PA 17314 Regional Administrator, Region I U.S. Nuclear Regulatory Commission 475 Allendale Road King of Prussia, PA 19406 Mr. Roland Fletcher Department of Environment Radiological Health Program 2400 Broening Highway Baltimore, MD 21224 Correspondence Control Desk Exelon Generation Company, LLC 200 Exelon Way, KSA 1N1 Kennett Square, PA 19348 Director, Bureau of Radiation Protection Pennsylvania Department of Environmental Protection Rachel Carson State Office Building P.O. Box 8469 Harrisburg, PA 17105-8469 Board of Supervisors Peach Bottom Township 545 Broad Street Ext.

Delta, PA 17314-9203 Mr. Richard McLean Power Plant and Environmental Review Division Department of Natural Resources B-3, Tawes State Office Building Annapolis, MD 21401 Dr. Judith Johnsrud National Energy Committee Sierra Club 433 Orlando Avenue State College, PA 16803 Manager-Financial Control & Co-Owner Affairs Public Service Electric and Gas Company P.O. Box 236 Hancocks Bridge, NJ 08038-0236 Manager Licensing-Peach Bottom Atomic Power Station Exelon Generation Company, LLC P.O. Box 160 Kennett Square, PA 19348 Vice President - Licensing and Regulatory Affairs Exelon Generation Company, LLC 4300 Winfield Road Warrenville, IL 60555

Peach Bottom Atomic Power Station, Unit Nos. 2 and 3 cc:

Senior Vice President-Mid-Atlantic Operations Exelon Generation Company, LLC 200 Exelon Way, KSA 3-N Kennett Square, PA 19348 Senior Vice President - Operations Support Exelon Generation Company, LLC 200 Exelon Way, KSA 3-N Kennett Square, PA 19348 Director - Licensing and Regulatory Affairs Exelon Generation Company LLC Correspondence Control P.O. Box 160 Kennett Square, PA 19348 Associate General Counsel Exelon Generation Company, LLC 4300 Winfield Road Warrenville, IL 60555

REQUEST FOR ADDITIONAL INFORMATION REGARDING RELIEF REQUEST CRR-13 ASSOCIATED WITH THE FIRST AND SECOND CONTAINMENT INSERVICE INSPECTION INTERVALS PEACH BOTTOM ATOMIC POWER STATION, UNITS 2 AND 3 DOCKET NOS. 50-277 AND 50-278 By letter dated February 29, 2008, (Agencywide Documents Access and Management System (ADAMS) Accession No. ML080640587), Exelon Generation Company, LLC, submitted Relief Request CRR-13 associated with the first and second Containment Inservice Inspection intervals for Peach Bottom Atomic Power Station, Units 2 and 3. The Nuclear Regulatory Commission (NRC) staff has reviewed the request for relief the licensee provided in the February 29, 2008, submittal. In order for the NRC staff to complete its evaluation, response to the following request for additional information (RAI) questions is requested.

RAI-1)

To facilitate the NRC staffs understanding of the as-constructed configuration of the drywell with the embedded construction manway N-3, please provide a detail drawing of a vertical section of the drywell passing through the location of the N-3 manway. Please provide a detail that shows the as-constructed structural configuration of the drywell including its concrete components (i.e., concrete floor, concrete foundation and concrete wall with important dimensions and elevations).

RAI-2)

Please confirm if the seal weld for the manway penetration was radiographed and tested for leak-tightness (indicate method used) prior to being covered with concrete.

RAI-3)

Since the proposed alternative in Section 6 is the Appendix J Integrated Leak Rate Testing, please provide the results, with dates and acceptance criteria, of the most recent two Type A tests performed on the Primary Containment at Peach Bottom Atomic Power Station, Unit 2 and Unit 3.