Site-Specific Implementation of B.5.B Phase 2 and 3 Mitigating Strategies Temporary Instruction Inspection (NRC Inspection Report 05000483-08-007)
ML081790807
Person / Time
Site: Callaway Ameren icon.png
Issue date: 06/27/2008
From: Ryan Lantz
NRC/RGN-IV/DRS/EMB
To: Naslund C
Union Electric Co
References
IR-08-007
Download: ML081790807 (4)


See also: IR 05000483/2008007

Text

OFFICIAL USE ONLY - SECURITY-RELATED INFORMATION

UNITED STATES

NU CLE AR RE GU LATOR Y C O M M I S S I O N

R EGI ON I V

611 R YAN PLAZA D R IV E, SU ITE 400

AR LI N GTON , TEXAS 76011-4005

June 27, 2008

Charles D. Naslund, Senior Vice

President and Chief Nuclear Officer

Union Electric Company

P.O. Box 620

Fulton, MO 65251

SUBJECT: CALLAWAY PLANT - SITE-SPECIFIC IMPLEMENTATION OF B.5.B PHASE 2

AND 3 MITIGATING STRATEGIES TEMPORARY INSTRUCTION INSPECTION

(NRC INSPECTION REPORT 05000483/2008007)

Dear Mr. Naslund:

In a telephone conversation on June 26, 2008, Messrs. Kevin Bruckerhoff and John Kirkland

made arrangements for the NRC to inspect the site-specific implementation of B.5.b Phase 2

and 3 mitigating strategies at the Callaway Plant. The inspection is planned for the week of

July 28, 2008.

In order for the NRC to adequately prepare for this inspection, please furnish the documents

listed in Enclosure 1 to Mr. John Kirkland in electronic format no later than July 14, 2008.

Please have available on site at the beginning of the inspection the arrangements and

documents listed in Enclosure 2. Mr. Kevin Bruckerhoff has been advised of this request and

provided with the name and address of the NRC lead inspector.

This letter contains information collections that are subject to the Paperwork Reduction Act of

1995 (44 U.S.C. 3501 et seq.). These information collections were approved by the Office of

Management and Budget, approval number 3150-0011.

The public reporting burden for this collection of information is estimated to average 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> per

response, including the time for reviewing instructions, gathering and maintaining the data

needed, and completing and reviewing the collection of information. Send comments on any

aspect of this collection of information, including suggestions for reducing the burden, to the

Records and FOIA/Privacy Services Branch (T-5 F53), U.S. Nuclear Regulatory Commission,

OFFICIAL USE ONLY - SECURITY-RELATED INFORMATION

OFFICIAL USE ONLY - SECURITY-RELATED INFORMATION

Union Electric Company -2-

Washington, D.C. 20555-0001, or by Internet electronic mail to

INFOCOLLECTS.Resource@NRC.GOV; and to the Desk Officer, Office of Information and

Regulatory Affairs, NEOB-10202, (3150-0011), Office of Management and Budget, Washington,

D.C. 20503-0001.

In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be

available electronically for public inspection in the NRC Public Document Room or from the

Publicly Available Records System (PARS) component of NRC's Agencywide Documents

Access and Management System (ADAMS), accessible from the NRC Web site at

http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). However,

because of the sensitive information contained in the enclosures, and in accordance with

10 CFR 2.390, a copy of this letters enclosures will not be available for public inspection.

Thank you for your cooperation in this matter. If you have any questions regarding this

inspection, please contact John Kirkland at 402-426-9611, or me at 817 860-8159.

Sincerely,

/RA/

Ryan E. Lantz, Chief

Operations Branch

Division of Reactor Safety

Docket: 50-483

License: NPF-30

Enclosures:

1. Documentation Requested

Prior to the Inspection

2. Arrangements/Documents Requested

To Be Available Onsite during the

Inspection Week

cc w/enclosure:

H. Floyd Gilzow

Deputy Director for Policy

Missouri Department of Natural Resources

P.O. Box 176

Jefferson City, MO 65102-0176

OFFICIAL USE ONLY - SECURITY-RELATED INFORMATION

OFFICIAL USE ONLY - SECURITY-RELATED INFORMATION

Union Electric Company -3-

Steve Petzel

AmerenUE

P.O. Box 620

Fulton, MO 65251

Jeffery Lancaster

AmerenUE

P.O. Box 620

Fulton, MO 65251

cc w/o enclosure:

Scott A. Maglio, Assistant Manager

Regulatory Affairs

AmerenUE

P.O. Box 620

Fulton, MO 65251

Les H. Kanuckel, Manager

Quality Assurance

AmerenUE

P.O. Box 620

Fulton, MO 65251

Luke H. Graessle, Manager

Regulatory Affairs

AmerenUE

P.O. Box 620

Fulton, MO 65251

Thomas B. Elwood, Supervising Engineer

Regulatory Affairs/Licensing

AmerenUE

P.O. Box 66149, MC 470

St. Louis, MO 63166-6149

Daniel Trokey

AmerenUE

P.O. Box 620

Fulton, MO 65251

OFFICIAL USE ONLY - SECURITY-RELATED INFORMATION

OFFICIAL USE ONLY - SECURITY-RELATED INFORMATION

Union Electric Company -4-

David S. Hollabaugh,

AmerenUE

P.O. Box 620

Fulton, MO 65251