ML081690340

From kanterella
Jump to navigation Jump to search
Initial Operator Licensing Examination Written Test Approval (Calvert Cliffs Nuclear Power Plant)
ML081690340
Person / Time
Site: Calvert Cliffs  Constellation icon.png
Issue date: 06/16/2008
From: Caruso J
Operations Branch I
To: Spina J
Calvert Cliffs
Shared Package
ML081690340 List:
References
Download: ML081690340 (5)


Text

June 16, 2008 Mr. James A. Spina Vice President Calvert Cliffs Nuclear Power Plant, Inc.

Calvert Nuclear Power Plant 1650 Calvert Cliffs Parkway Lusby, MD 20657-4702

SUBJECT:

INITIAL OPERATOR LICENSING EXAMINATION WRITTEN TEST APPROVAL (CALVERT CLIFFS NUCLEAR POWER PLANT)

Dear Mr. Spina:

The purpose of this letter is to confirm the final arrangements for the upcoming operator licensing examinations at the Calvert Cliffs Nuclear Power Plant. The NRC has approved the written test portion of the examination. Your staff is authorized to administer those tests to the applicants during the week of June 23, 2008.

This examination has undergone extensive review by my staff and representatives responsible for licensed operator training at your facility. Based on this review I have concluded that the examination meets the guidelines of NUREG-1021 for content, operational, and discrimination validity. You also agree that it meets NUREG-1021 guidelines, and is appropriate for measuring the qualifications of licensed operator applicants at your facility. If you determine that this examination is not appropriate for licensing operators at your facility, do not administer the examination and contact me at (610) 337-5389. The operating test portion of the exam was previously approved for administration in my letter dated June 5, 2008.

Please contact your Chief Examiner, David Silk, at 610-337-5372, if you have any questions or identify any errors or changes in the license level (RO or SRO) or type of examination (partial or complete written examination and/or operating test) specified for each applicant.

Sincerely,

/RA/

John Caruso, Chief Operations Branch Division of Reactor Safety Docket Nos. 50-317, 50-318 License Nos. DPR-53, DPR-69

Mr. James A. Spina Vice President Calvert Cliffs Nuclear Power Plant, Inc.

Calvert Nuclear Power Plant 1650 Calvert Cliffs Parkway Lusby, MD 20657-4702

SUBJECT:

INITIAL OPERATOR LICENSING EXAMINATION WRITTEN TEST APPROVAL (CALVERT CLIFFS NUCLEAR POWER PLANT)

Dear Mr. Spina:

The purpose of this letter is to confirm the final arrangements for the upcoming operator licensing examinations at the Calvert Cliffs Nuclear Power Plant. The NRC has approved the written test portion of the examination. Your staff is authorized to administer those tests to the applicants during the week of June 23, 2008.

This examination has undergone extensive review by my staff and representatives responsible for licensed operator training at your facility. Based on this review I have concluded that the examination meets the guidelines of NUREG-1021 for content, operational, and discrimination validity. You also agree that it meets NUREG-1021 guidelines, and is appropriate for measuring the qualifications of licensed operator applicants at your facility. If you determine that this examination is not appropriate for licensing operators at your facility, do not administer the examination and contact me at (610) 337-5389. The operating test portion of the exam was previously approved for administration in my letter dated June 5, 2008.

Please contact your Chief Examiner, David Silk, at 610-337-5372, if you have any questions or identify any errors or changes in the license level (RO or SRO) or type of examination (partial or complete written examination and/or operating test) specified for each applicant.

Sincerely,

/RA/

John Caruso, Chief Operations Branch Division of Reactor Safety Docket Nos. 50-317, 50-318 License Nos. DPR-53, DPR-69 SUNSI Review Complete: DS (Reviewer=s Initials)

ADAMS PKG: ML073040307 ADAMS ACC#ML081690340 DOCUMENT NAME: G:\DRS\Operations Branch\SILK\Exam FY08-CC Jun 08 (U01633)\ExamApprovalLtr-writtenexam.doc After declaring this document AAn Official Agency Record,@ it will be released to the Public.

To receive a copy of this document, indicate in the box: "C" = Copy without attachment/enclosure "E" = Copy with attachment/enclosure "N" = No copy OFFICE RI/DRS/OB RI/DRS/OB RI/DRS/OB NAME CJBixler/CB DMSilk/DS JGCaruso/JC DATE 06/10/08 06/10/08 06/16/08 OFFICIAL RECORD COPY

J. A. Spina -2 cc:

M. J. Wallace, President, Constellation Generation J. M. Heffley, Senior Vice President and Chief Nuclear Officer President, Calvert County Board of Commissioners C. W. Fleming, Esq., Senior Counsel, Nuclear Generation Group J. Gaines, Director, Licensing Director, Nuclear Regulatory Matters S. Gray, Power Plant and Environmental Review Division, Maryland K. Burger, Esquire, Maryland People's Counsel R. Hickok, NRC Technical Training Center M. Griffen, Maryland Department of the Environment S. Pattison, SLO (2)

William C. Holston, Manager, Nuclear Training

J. A. Spina -3 E-Mail Distribution:

S. Collins, RA M. Dapas, DRA S. Williams, RI OEDO R. Nelson, NRR D. Pickett, PM, NRR A. Muniz, PM, NRR M. Gamberoni, DRS S. Hansell, DRS J. Caruso, DRS G. Dentel, DRP J. Hawkins, DRP S. Kennedy, DRP, Senior Resident Inspector M. Davis, DRP, Resident Inspector C. Newgent, DRP, Resident OA Region I Docket Room (with concurrences)

ROPreports Resource (All IRs)

J. A. Spina -4 Distribution:

D. Silk, DRS, Chief Examiner DRS Master Exam File (C. Bixler) (w/concurrences)

DRS File