Category:Letter
MONTHYEARML24010A0032024-01-30030 January 2024 Exemption from Select Requirements of 10 CFR Part 73 - Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting ML24026A0532024-01-30030 January 2024 Notification of an NRC Fire Protection Team Inspection- (Report 05000348/2024011, 05000364/2024011) and Request for Information IR 05000348/20230402024-01-24024 January 2024 95001 Supplemental Inspection Report 05000348/2023040 and Follow-Up Assessment Letter ML23341A2042024-01-12012 January 2024 Request for Additional Information Exemption Requests for Physical Barriers (EPID L-2023-LLE-0018 & L-2023-LLE-0021) NL-24-0011, Report of Changes to Emergency Plan and Summary of 50.54(q) Analysis2024-01-11011 January 2024 Report of Changes to Emergency Plan and Summary of 50.54(q) Analysis ML23345A1312024-01-0303 January 2024 Withholding Letter - SNC Fleet - Physical Barriers Exemption (L-2023-LLE-0018 and L-2023-LLE-0021) ML23346A2222023-12-22022 December 2023 Transmittal of Dam Inspection Report - Public NL-23-0901, 30-Day 10 CFR 21 Notification - Framatome Supplied Siemens Medium Voltage (Mv) Circuit Breakers2023-12-15015 December 2023 30-Day 10 CFR 21 Notification - Framatome Supplied Siemens Medium Voltage (Mv) Circuit Breakers NL-23-0908, Cycle 30 Core Operating Limits Report2023-12-13013 December 2023 Cycle 30 Core Operating Limits Report NL-23-0877, Request for Exemption from Security Event Notification Implementation2023-11-29029 November 2023 Request for Exemption from Security Event Notification Implementation ML23228A1432023-11-22022 November 2023 Issuance of Amendment Nos. 249 and 246 to Revise TS 3.6.3, Surveillance Requirement 3.6.3.5 to Eliminate Event-Based Testing of Containment Purge Valves with Resilient Seals NL-23-0825, Reply to Notice of Violation EA-23-080 and Readiness for 95001 Inspection2023-11-14014 November 2023 Reply to Notice of Violation EA-23-080 and Readiness for 95001 Inspection ML23318A0672023-10-31031 October 2023 1 to Updated Final Safety Analysis Report, Updated NFPA 805 Fire Protection Program Design Basis Document, Technical Specification Bases Changes, Technical Requirements Manual Changes, IR 05000348/20230032023-10-24024 October 2023 Integrated Inspection Report 05000348/2023003 and 05000364/2023003 IR 05000348/20230912023-10-19019 October 2023 Final Significance Determination of a White Finding and Notice of Violation and Assessment Followup Letter NRC Inspection Report 05000348/2023091 IR 05000348/20234022023-10-18018 October 2023 Security Baseline Inspection Report 05000348/2023402 and 05000364/2023402 IR 05000348/20234412023-10-12012 October 2023 Supplemental Inspection Report 05000348/2023441 and 05000364/2023441 and Follow-Up Assessment Letter (Cover Letter) ML23241B0212023-09-12012 September 2023 Review of Quality Assurance Topical Report NL-23-0739, Response to NRC Inspection Report and Preliminary White Finding2023-09-0808 September 2023 Response to NRC Inspection Report and Preliminary White Finding IR 05000348/20230902023-08-31031 August 2023 NRC Inspection Report 05000348/2023090 and Preliminary White Finding and Apparent Violation ML23164A1202023-08-30030 August 2023 Proposed Inservice Inspection Alternative FNP-ISI-ALT-05-05, Version 1.0, to the Requirements of the ASME Code ML23240A0012023-08-30030 August 2023 Correction to Issuance of Amendment Nos. 241, 242, 243, and 244 ML23235A2962023-08-24024 August 2023 Issuance of Amendment Nos. 247 and 244, Regarding License Amendment Request to Revise Technical Specification 3.6.5, Containment Air Temperature, (EPID L-2023-LLA-0116) (Emergency Circumstances) NL-23-0716, Response to Request for Additional Information Regarding Emergency License Amendment Request: Technical Specification 3.6.5, Containment Air Temperature, One-Time Temporary Change to Limit2023-08-23023 August 2023 Response to Request for Additional Information Regarding Emergency License Amendment Request: Technical Specification 3.6.5, Containment Air Temperature, One-Time Temporary Change to Limit NL-23-0713, Response to Request for Additional Information Regarding Emergency License Amendment Request: Technical Specification 3.6.5, Containment Air Temperature, One-Time Temporary Change to Limit2023-08-23023 August 2023 Response to Request for Additional Information Regarding Emergency License Amendment Request: Technical Specification 3.6.5, Containment Air Temperature, One-Time Temporary Change to Limit NL-23-0704, Emergency License Amendment Request: Technical Specification 3.6.5, Containment Air Temperature, One-Time Temporary Change to Limit2023-08-22022 August 2023 Emergency License Amendment Request: Technical Specification 3.6.5, Containment Air Temperature, One-Time Temporary Change to Limit IR 05000348/20330012023-08-14014 August 2023 NRC Operator License Examination Report 05000348/203301 and 05000364/2023302 NL-23-0658, Southern Nuclear Operating Company - Response to Request for Additional Information Regarding Quality Assurance Topical Report Submittal2023-08-11011 August 2023 Southern Nuclear Operating Company - Response to Request for Additional Information Regarding Quality Assurance Topical Report Submittal IR 05000348/20230022023-08-10010 August 2023 Integrated Inspection Report 05000348/2023002 and 05000364/2023002, and Apparent Violation ML23221A3062023-08-0909 August 2023 Notification of NRC Supplemental Inspection (95002) and Request for Information (Cover Letter) NL-23-0542, CFR 50.46 ECCS Evaluation Model Annual Report for 20222023-08-0909 August 2023 CFR 50.46 ECCS Evaluation Model Annual Report for 2022 NL-23-0624, Report of Changes to Emergency Plan and Summary of 50.54(q) Analysis2023-08-0404 August 2023 Report of Changes to Emergency Plan and Summary of 50.54(q) Analysis ML23202A1122023-08-0202 August 2023 Units, 1 and 2; and Vogtle Units 1 and 2 - Request to Use a Provision of a Later Edition of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code, Section XI NL-23-0628, Readiness for Supplemental Inspection EA-22-1012023-07-26026 July 2023 Readiness for Supplemental Inspection EA-22-101 NL-23-0566, ISFSI and Edwin I. Hatch Nuclear Plant ISFSI - Registration of Spent Fuel Cask Use2023-07-13013 July 2023 ISFSI and Edwin I. Hatch Nuclear Plant ISFSI - Registration of Spent Fuel Cask Use NL-23-0555, Request for Exemption from Physical Barrier Requirement2023-07-0707 July 2023 Request for Exemption from Physical Barrier Requirement NL-23-0506, to Non-Voluntary License Amendment Request: Technical Specification Revision to Adopt WCAP-17661-P-A, Improved RAOC and CAOC Fq Surveillance Technical Specifications2023-07-0505 July 2023 to Non-Voluntary License Amendment Request: Technical Specification Revision to Adopt WCAP-17661-P-A, Improved RAOC and CAOC Fq Surveillance Technical Specifications ML23136B1542023-07-0303 July 2023 Issuance of Amendment Nos. 246 & 243, Regarding License Amendment Request to Revise Technical Specification 4.3, Fuel Storage, to Correct Tabulated Values from the Associated Spent Fuel Pool (SFP) Criticality Analysis IR 05000348/20230102023-06-29029 June 2023 Comprehensive Engineering Team Inspection (CETI) Baseline Inspection Report 05000348/2023010 and 05000364/2023010 NL-23-0444, Quality Assurance Topical Report Submittal2023-06-15015 June 2023 Quality Assurance Topical Report Submittal ML23164A2182023-06-14014 June 2023 Draft Safety Evaluation for License Amendment Request to Revise Technical Specification 4.3, Fuel Storage, to Correct Tabulated Values from the Associated SFP Criticality Analysis (EPID L-2022-LLA-0138) - Letter NL-23-0457, ISFSI, and Edwin I. Hatch Nuclear Plant, ISFSI - Registration of Spent Fuel Cask Use2023-06-12012 June 2023 ISFSI, and Edwin I. Hatch Nuclear Plant, ISFSI - Registration of Spent Fuel Cask Use NL-23-0449, National Pollutant Discharge Elimination System (NPDES) Permit Renewal Application2023-06-0202 June 2023 National Pollutant Discharge Elimination System (NPDES) Permit Renewal Application NL-23-0383, SNC Response to Regulatory Issue Summary 2023-01:Preparation And.2023-05-19019 May 2023 SNC Response to Regulatory Issue Summary 2023-01:Preparation And. NL-23-0372, Units 1 & 2, Joseph M. Farley Nuclear Plant - Units 1 & 2, Vogtle Electric Generating Plant - Units 1 & 2, Annual Radiological Environmental Operating Reports for 20222023-05-10010 May 2023 Units 1 & 2, Joseph M. Farley Nuclear Plant - Units 1 & 2, Vogtle Electric Generating Plant - Units 1 & 2, Annual Radiological Environmental Operating Reports for 2022 NL-23-0337, Response to Request for Additional Information Related to License Amendment Request to Revise the Frequency of Surveillance Requirement 3.6.3.52023-05-0505 May 2023 Response to Request for Additional Information Related to License Amendment Request to Revise the Frequency of Surveillance Requirement 3.6.3.5 IR 05000348/20234402023-05-0505 May 2023 Reissue Farley Units-Final Significance Determination for a Security-Related Greater than Green Finding, Nov and Assessment Followup LTR, IR 05000348/2023440 and 05000364/2023440 - Cover IR 05000348/20230012023-05-0404 May 2023 Integrated Inspection Report 05000348/2023001 and 05000364/2023001 NL-23-0295, Reply to a Notice of Violation; EA-22-1012023-05-0101 May 2023 Reply to a Notice of Violation; EA-22-101 NL-23-0310, Annual Non-Radiological Environmental Operating Reports and Annual Radioactive Effluent Release Reports for 20222023-04-25025 April 2023 Annual Non-Radiological Environmental Operating Reports and Annual Radioactive Effluent Release Reports for 2022 2024-01-30
[Table view] Category:License-Operating (New/Renewal/Amendments) DKT 50
MONTHYEARML23228A1432023-11-22022 November 2023 Issuance of Amendment Nos. 249 and 246 to Revise TS 3.6.3, Surveillance Requirement 3.6.3.5 to Eliminate Event-Based Testing of Containment Purge Valves with Resilient Seals ML23240A0012023-08-30030 August 2023 Correction to Issuance of Amendment Nos. 241, 242, 243, and 244 ML23235A2962023-08-24024 August 2023 Issuance of Amendment Nos. 247 and 244, Regarding License Amendment Request to Revise Technical Specification 3.6.5, Containment Air Temperature, (EPID L-2023-LLA-0116) (Emergency Circumstances) ML23136B1542023-07-0303 July 2023 Issuance of Amendment Nos. 246 & 243, Regarding License Amendment Request to Revise Technical Specification 4.3, Fuel Storage, to Correct Tabulated Values from the Associated Spent Fuel Pool (SFP) Criticality Analysis ML23076A0502023-03-21021 March 2023 Correction of Amendment Nos. 244 and 241 Issuance of Amendments Regarding Revision to Technical Specifications to Relocate Augmented Piping Inspection Program Details to a License Controlled Document ML23054A4552023-03-16016 March 2023 Issuance of Amendment Nos. 245 and 242, Regarding LAR to Revise Technical Specification 3.4.10, Pressurizer Safety Valves, to Decrease Low Side Setpoint Tolerance LCO Value ML22308A0592022-11-0808 November 2022 Issuance of Amendments Regarding Revision to Technical Specifications to Relocate Augmented Piping Inspection Program Details to a Licensee-Controlled Document ML22286A0742022-11-0808 November 2022 Issuance of Amendments Regarding Revision to Technical Specifications to Relocate Augmented Piping Inspection Program Details to a Licensee-Controlled Document ML22263A2252022-11-0101 November 2022 Issuance of Amendment Nos. 243 and 240 to Revise Technical Specification 5.5.17, Containment Leakage Rate Testing Program to Increase Calculated Peak Containment Pressure ML22069A0042022-04-27027 April 2022 Issuance of Amendments Revision to TSs to Adopt TSTF-269-A, Rev. 2, Allow Administrative Means of Position Verification for Locked or Sealed Valves ML22060A1892022-03-15015 March 2022 Correction to TS Pg 3.6.6-4 During Issuance of Amendment Nos. 225 and 222 ML22032A2432022-03-0707 March 2022 Issuance of Amendment Nos. 241 and 238 to Eliminate the Encapsulation Vessels Around the First Containment Spray and Residual Heat Removal / Low Head Safety Injection Recirculation Suction Isolation Valves ML21349A5182022-02-0202 February 2022 Issuance of Amendments Regarding Revision to Technical Specifications to Adopt TSTF-554, Revise RCS Leakage ML21344A0032022-01-26026 January 2022 Issuance of Amendments Regarding Revision to Use Beacon Power Distribution Monitoring System ML22004A1322022-01-24024 January 2022 Correction of Amendment Nos. 227 and 224 Issuance of Amendments Regarding Application to Revise Technical Specifications to Adopt TSTF-569, Revise Response Time Testing Definition (EPID L-2019-LLA-027 ML21316A0552022-01-0505 January 2022 1 & 2, and Vogtle Electric Generating Plant, 1 & 2 - Issuance of Amendments Regarding Revision to Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube Inspections (EPID L-2021-LLA-0163 ML21270A0862021-11-18018 November 2021 Issuance of Amendments Regarding Revision to Technical Specifications 5.7, High Radiation, Administrative Controls ML21217A0912021-09-21021 September 2021 SNC Fleet, Issuance of Amendments Regarding Revision to Emergency Plan to Change Staffing and Extend Staff Augmentation Times for Emergency Response Organization Positions ML21167A3152021-07-30030 July 2021 Issuance of Amendments Regarding Revision to Technical Specifications to Adopt TSTF-541, Rev.2, Add Exceptions to Surveillance Requirements for Valves & Dampers Locked in Actuated Position ML21137A2472021-06-30030 June 2021 Issuance of Amendment Nos. 233 and 230, Regarding Risk-Informed Categorization and Treatment of Structures, Systems, and Components NL-21-0379, Southern Nuclear Operating Company - Supplement to License Amendment Request to Revise the Emergency Plan to Change Staffing and Extend Staff Augmentation Times for Emergency Response Organization Positions2021-04-27027 April 2021 Southern Nuclear Operating Company - Supplement to License Amendment Request to Revise the Emergency Plan to Change Staffing and Extend Staff Augmentation Times for Emergency Response Organization Positions ML21095A0872021-04-19019 April 2021 Non-Acceptance of Requested Licensing Action License Amendment Request to Revise Technical Specification Surveillance Requirement 3.3.5.2 Allowable Values ML20303A1192020-12-11011 December 2020 Issuance of Amendment Nos. 232 and 229 Regarding Adoption of TSTF-567, Revision 1, Add Containment Sump TS to Address GSI-191 Issues ML20224A2852020-10-13013 October 2020 Issuance of Amendment Nos. 231 and 228 to Revise Technical Specifications 3.3.1 and 3.3.7 ML20121A2832020-10-0909 October 2020 Issuance of Amendments 230 and 227 Measurement Uncertainty Recapture Power Uprate ML20196L9292020-10-0606 October 2020 Issuance of Amendment Nos. 229 and 226 Regarding Spent Fuel Pool Criticality Safety Analysis ML19337C3222020-01-29029 January 2020 Issuance of Amendments Revision to Technical Specifications to Adopt TSTF-563 ML19175A2432019-08-23023 August 2019 Issuance of Amendments 225 and 222 Implementation of NEI 06-09, Risk-Informed Technical Specifications Initiative 4B, Risk-Managed Technical Specification (Rmts) Guidelines, Revision 0-A ML19156A2622019-07-30030 July 2019 Issuance of Amendments 224 and 221 Performance-Based Fire Protection Alternative for Thermal Insulation Material ML19071A1382019-07-16016 July 2019 Issuance of Amendments 223 and 220 Revise Technical Specification Requirements During Handling Irradiated Fuel and Core Alterations TSTF-51 and TSTF-471 ML19064A7742019-04-26026 April 2019 Issuance of Amendments Regarding License Amendment Request to Revise Technical Specification 5.2.2.g and Update Emergency Plan Minimum on Shift Staff Tables ML18271A2072018-11-0707 November 2018 Issuance of Amendments 221 and 218 Technical Specification 3.3.2 Regarding Steam Flow Isolation on High Steam Flow ML18183A0732018-07-26026 July 2018 Unites 1, 2, 3, and 4; and Edwin I. Hatch Nuclear Plant, Unit Nos. 1 and 2(CAC Nos. MG0188, MG0189, MG0191, MG0192, MG0193, MG0194, and MG0195; EPID L-2017-LLA-0293) ML18151A1742018-06-27027 June 2018 Issuance of Amendment Nos. 219 and 216, Adopt Technical Specification Task Force Traveler TSTF-412, Revision 3, Provide Actions for One Steam Supply to Turbine Driven Afw/Efw Pump Inoperable ML17291A7812018-03-0101 March 2018 Issuance of Amendments to Correct Non-Conservative Technical Specification 3.7.1 (CAC Nos. MF9465 and MF9466; EPID L-2017-LLA-0181) ML17261A0872018-02-28028 February 2018 Issuance of Amendments to Revise Actions of TS 5.5.17, Containment Leakage Rate Testing Program (CAC Nos. MF8844 and MF8845; EPID No. L-2016-LLA-0015) ML17271A2652017-12-20020 December 2017 Issuance of Amendments Adopting Alternative Source Term, TSTF-448, and TSTF-312 (CAC Nos. MF8861, MF8862, MF8916, MF8917, MF8918, MF8919; Epids Nos. L-2016-LLA-0017,L-2016-LLA-0018, L-2016-LLA-0019) ML17269A1662017-11-0101 November 2017 Issuance of Amendments Related to NFPA 805 Supplement (CAC Nos. MG0094 and MG0095; EPID L-2017-LLA-0261) ML17214A5462017-10-0202 October 2017 Issuance of Amendments Regarding the Adoption of TSTF-547, Revision 1, Clarification of Rod Position Requirements ML17205A0202017-09-15015 September 2017 Issuance of Amendments to Revise TS 3.8.9, Distribution Systems - Operating ML17152A2182017-06-30030 June 2017 Southern Nuclear Fleet - Issuance of Amendments Regarding the Adoption of TSTF-545, Revision 3, TS Inservice Testing Program Removal & Clarify SR Usage Rule Application to Section 5.5 Testing (CAC Nos. MF8176 - MF8181) ML17137A0412017-06-27027 June 2017 Issuance of Amendments Regarding the Adoption of TSTF-529, Revision 4, Clarify Use and Application Rules (CAC Nos. MF8897, MF8898, MF8900-MF8902, and MF8921) ML17023A2372017-03-16016 March 2017 Issuance of Amendments Regarding the Adoption of NEI 99-01, Revision 6, Development of Emergency Action Levels for Non-Passive Reactors(Cac Nos. MF7460-MF7465) ML16141A1252017-03-14014 March 2017 Issuance of Amendments to Incorporate Southern Nuclear Operating Company Fleet Emergency Plan ML17034A1932017-02-16016 February 2017 Issuance of Amendments to Adopt TSTF-427 Allowance for Non Technical Specification Barrier Degradation on Supported System Operability ML16291A0302017-01-13013 January 2017 Issuance of Amendments the Adoption of TSTF-65-A, Rev. 1, Use of Generic Titles for Utility Positions (CAC Nos. MF7466, MF7467, MF7468, MF7469, MF7470, & MF7471) NL-16-0388, Alternative Source Term License Amendment Request2016-11-22022 November 2016 Alternative Source Term License Amendment Request ML16196A1612016-11-17017 November 2016 Issuance of Amendments Related to Technical Specification 3.3.5 ML16232A0002016-10-17017 October 2016 Issuance of Amendments Related to NFPA-805 Supplement NL-16-0388, Draft License Amendment Request Regarding Alternative Source Team2016-10-15015 October 2016 Draft License Amendment Request Regarding Alternative Source Team 2023-08-30
[Table view] Category:Safety Evaluation
MONTHYEARML23228A1432023-11-22022 November 2023 Issuance of Amendment Nos. 249 and 246 to Revise TS 3.6.3, Surveillance Requirement 3.6.3.5 to Eliminate Event-Based Testing of Containment Purge Valves with Resilient Seals ML23164A1202023-08-30030 August 2023 Proposed Inservice Inspection Alternative FNP-ISI-ALT-05-05, Version 1.0, to the Requirements of the ASME Code ML23235A2962023-08-24024 August 2023 Issuance of Amendment Nos. 247 and 244, Regarding License Amendment Request to Revise Technical Specification 3.6.5, Containment Air Temperature, (EPID L-2023-LLA-0116) (Emergency Circumstances) ML23202A1122023-08-0202 August 2023 Units, 1 and 2; and Vogtle Units 1 and 2 - Request to Use a Provision of a Later Edition of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code, Section XI ML23136B1542023-07-0303 July 2023 Issuance of Amendment Nos. 246 & 243, Regarding License Amendment Request to Revise Technical Specification 4.3, Fuel Storage, to Correct Tabulated Values from the Associated Spent Fuel Pool (SFP) Criticality Analysis ML23164A2072023-06-14014 June 2023 Draft Safety Evaluation for License Amendment Request to Revise Technical Specification 4.3, Fuel Storage, to Correct Tabulated Values from the Associated SFP Criticality Analysis (EPID L-2022-LLA-0138) - Draft Safety Evaluation ML23054A4552023-03-16016 March 2023 Issuance of Amendment Nos. 245 and 242, Regarding LAR to Revise Technical Specification 3.4.10, Pressurizer Safety Valves, to Decrease Low Side Setpoint Tolerance LCO Value ML22308A0592022-11-0808 November 2022 Issuance of Amendments Regarding Revision to Technical Specifications to Relocate Augmented Piping Inspection Program Details to a Licensee-Controlled Document ML22286A0742022-11-0808 November 2022 Issuance of Amendments Regarding Revision to Technical Specifications to Relocate Augmented Piping Inspection Program Details to a Licensee-Controlled Document ML22069A0042022-04-27027 April 2022 Issuance of Amendments Revision to TSs to Adopt TSTF-269-A, Rev. 2, Allow Administrative Means of Position Verification for Locked or Sealed Valves ML22032A2432022-03-0707 March 2022 Issuance of Amendment Nos. 241 and 238 to Eliminate the Encapsulation Vessels Around the First Containment Spray and Residual Heat Removal / Low Head Safety Injection Recirculation Suction Isolation Valves ML21349A5182022-02-0202 February 2022 Issuance of Amendments Regarding Revision to Technical Specifications to Adopt TSTF-554, Revise RCS Leakage ML21344A0032022-01-26026 January 2022 Issuance of Amendments Regarding Revision to Use Beacon Power Distribution Monitoring System ML21316A0552022-01-0505 January 2022 1 & 2, and Vogtle Electric Generating Plant, 1 & 2 - Issuance of Amendments Regarding Revision to Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube Inspections (EPID L-2021-LLA-0163 ML21270A0862021-11-18018 November 2021 Issuance of Amendments Regarding Revision to Technical Specifications 5.7, High Radiation, Administrative Controls ML21217A0912021-09-21021 September 2021 SNC Fleet, Issuance of Amendments Regarding Revision to Emergency Plan to Change Staffing and Extend Staff Augmentation Times for Emergency Response Organization Positions ML21167A3152021-07-30030 July 2021 Issuance of Amendments Regarding Revision to Technical Specifications to Adopt TSTF-541, Rev.2, Add Exceptions to Surveillance Requirements for Valves & Dampers Locked in Actuated Position ML21137A2472021-06-30030 June 2021 Issuance of Amendment Nos. 233 and 230, Regarding Risk-Informed Categorization and Treatment of Structures, Systems, and Components ML21161A2012021-06-22022 June 2021 Associated Independent Spent Fuel Storage Facilities - Reduction in Commitment to the Quality ML20303A1192020-12-11011 December 2020 Issuance of Amendment Nos. 232 and 229 Regarding Adoption of TSTF-567, Revision 1, Add Containment Sump TS to Address GSI-191 Issues ML20224A2852020-10-13013 October 2020 Issuance of Amendment Nos. 231 and 228 to Revise Technical Specifications 3.3.1 and 3.3.7 ML20121A2832020-10-0909 October 2020 Issuance of Amendments 230 and 227 Measurement Uncertainty Recapture Power Uprate ML20196L9292020-10-0606 October 2020 Issuance of Amendment Nos. 229 and 226 Regarding Spent Fuel Pool Criticality Safety Analysis ML20132A2072020-05-0808 May 2020 9 to the Updated Final Safety Analysis Report, Chapter 1, Introduction and General Description of the Plant and Chapter 2 (Part 1 of 3); Redacted Version ML20034E8942020-02-11011 February 2020 Relief Request Gen-ISI-ALT-2019-01 for Proposed Alternative to Use of ASME Code Case N-831-1, Ultrasonic Examination in Lieu of Radiography for Welds in Ferritic or Austenitic Pipe Section XI, Division 1 ML19337C3222020-01-29029 January 2020 Issuance of Amendments Revision to Technical Specifications to Adopt TSTF-563 ML19261A0142019-09-23023 September 2019 Correction to Safety Evaluation for Amendment Nos. 225 and 222 Regarding Implementation of NEI 06-09, Revision 0-A ML19175A2432019-08-23023 August 2019 Issuance of Amendments 225 and 222 Implementation of NEI 06-09, Risk-Informed Technical Specifications Initiative 4B, Risk-Managed Technical Specification (Rmts) Guidelines, Revision 0-A ML19213A1942019-08-0808 August 2019 Relief from Impractical American Society of Mechanical Engineers Code Requirements (FNP-ISI-RR-02) ML19192A1712019-08-0202 August 2019 Relief from Inservice Impractical ASME Code Requirements (FNP-ISI-RR-03) ML19156A2622019-07-30030 July 2019 Issuance of Amendments 224 and 221 Performance-Based Fire Protection Alternative for Thermal Insulation Material ML19071A1382019-07-16016 July 2019 Issuance of Amendments 223 and 220 Revise Technical Specification Requirements During Handling Irradiated Fuel and Core Alterations TSTF-51 and TSTF-471 ML19129A2322019-07-0101 July 2019 Inservice Inspection Alternative, FNP-ISI-ALT-05-04, Regarding Examination Frequency for Tendon Anchorhead Replacement ML19064A7742019-04-26026 April 2019 Issuance of Amendments Regarding License Amendment Request to Revise Technical Specification 5.2.2.g and Update Emergency Plan Minimum on Shift Staff Tables ML18334A2282018-12-10010 December 2018 Proposed Inservice Inspection Alternative FNP-ISI-ALT-05-03 ML18320A0572018-11-30030 November 2018 Plant, Units 1 and 2 - Proposed Inservice Inspection Alternative GEN-ISI-ALT-2017-03, Code Case N-513-4 for Moderate Pressure ML18271A2072018-11-0707 November 2018 Issuance of Amendments 221 and 218 Technical Specification 3.3.2 Regarding Steam Flow Isolation on High Steam Flow ML18183A0732018-07-26026 July 2018 Unites 1, 2, 3, and 4; and Edwin I. Hatch Nuclear Plant, Unit Nos. 1 and 2(CAC Nos. MG0188, MG0189, MG0191, MG0192, MG0193, MG0194, and MG0195; EPID L-2017-LLA-0293) ML18151A1742018-06-27027 June 2018 Issuance of Amendment Nos. 219 and 216, Adopt Technical Specification Task Force Traveler TSTF-412, Revision 3, Provide Actions for One Steam Supply to Turbine Driven Afw/Efw Pump Inoperable ML17291A7812018-03-0101 March 2018 Issuance of Amendments to Correct Non-Conservative Technical Specification 3.7.1 (CAC Nos. MF9465 and MF9466; EPID L-2017-LLA-0181) ML17261A0872018-02-28028 February 2018 Issuance of Amendments to Revise Actions of TS 5.5.17, Containment Leakage Rate Testing Program (CAC Nos. MF8844 and MF8845; EPID No. L-2016-LLA-0015) ML18022A1072018-01-25025 January 2018 Inservice Inspection Alternative GEN-ISI-ALT-2017-02, Version 1.0, Regarding the Use of ASME Code Case N-789-1 (CAC Nos. MF9942, MF9943, MF9944, and MF9945; EPID L-2017-LLR-0059) ML17354A9162017-12-28028 December 2017 Inservice Inspection Alternative FNP-ISI-ALT-05-01, Version 1, to Use ASME Code N-854 (CAC Nos. MG0107 and MF0108; EPID L-2017-LLR-0086) ML17271A2652017-12-20020 December 2017 Issuance of Amendments Adopting Alternative Source Term, TSTF-448, and TSTF-312 (CAC Nos. MF8861, MF8862, MF8916, MF8917, MF8918, MF8919; Epids Nos. L-2016-LLA-0017,L-2016-LLA-0018, L-2016-LLA-0019) ML17298A4162017-11-0101 November 2017 Relief Request FNP-ISI-ALT-22, Inservice Inspection Alternative for Code Case N-786-1 ML17269A1662017-11-0101 November 2017 Issuance of Amendments Related to NFPA 805 Supplement (CAC Nos. MG0094 and MG0095; EPID L-2017-LLA-0261) ML17214A5462017-10-0202 October 2017 Issuance of Amendments Regarding the Adoption of TSTF-547, Revision 1, Clarification of Rod Position Requirements ML17205A0202017-09-15015 September 2017 Issuance of Amendments to Revise TS 3.8.9, Distribution Systems - Operating ML17180A4392017-07-18018 July 2017 Inservice Testing Alternative for Pumps Per Code Case OMN-20 (RR-VR-01) ML17152A2182017-06-30030 June 2017 Southern Nuclear Fleet - Issuance of Amendments Regarding the Adoption of TSTF-545, Revision 3, TS Inservice Testing Program Removal & Clarify SR Usage Rule Application to Section 5.5 Testing (CAC Nos. MF8176 - MF8181) 2023-08-30
[Table view] |
Text
September 2, 2008 Mr. J. Randy Johnson Vice President - Farley Joseph M. Farley Nuclear Plant 7388 North State Highway 95 Columbia, AL 36319
SUBJECT:
JOSEPH M. FARLEY NUCLEAR PLANT, UNITS 1 AND 2 RE: ISSUANCE OF AMENDMENTS (TAC NOS. MD7391 AND MD7392)
Dear Mr. Johnson:
The U.S. Nuclear Regulatory Commission has issued the enclosed Amendment No. 177 to Renewed Facility Operating License No. NPF-2 and Amendment No. 170 to Renewed Facility Operating License No. NPF-8 for the Joseph M. Farley Nuclear Plant (FNP), Units 1 and 2. The amendments consist of changes to the Technical Specifications in response to your application dated November 5, 2007 (Agencywide Document Access and Management System (ADAMS)
Accession No. ML073100376), as supplemented by letter dated April 7, 2008, (ADAMS Accession No. ML080990386); Specifically, dates included in TS Section 5.5.17, Containment Leakage Rate Testing Program, would be changed to resolve a timing conflict between the FNP, Unit 2 R20 refueling outage schedule and the 15-year test date for the FNP, Unit 2 Type A Containment Integrated Leak Rate Test (ILRT). Although Unit 1 does not have a current timing conflict, a similar Unit 1 change was requested for consistency.
A copy of the related Safety Evaluation is also enclosed. A Notice of Issuance will be included in the Commission's next biweekly Federal Register notice.
Sincerely,
/ra/
R. A. Jervey, Project Manager Plant Licensing Branch II-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-348 and 50-364
Enclosures:
- 1. Amendment No. 177 to NPF-2
- 2. Amendment No. 170 to NPF-8
- 3. Safety Evaluation cc w/encl: See next page
September 2, 2008 Mr. J. Randy Johnson Vice President - Farley Joseph M. Farley Nuclear Plant 7388 North State Highway 95 Columbia, AL 36319
SUBJECT:
JOSEPH M. FARLEY NUCLEAR PLANT, UNITS 1 AND 2 RE: ISSUANCE OF AMENDMENTS (TAC NOS. MD7391 AND MD7392)
Dear Mr. Johnson:
The U.S. Nuclear Regulatory Commission has issued the enclosed Amendment No. 177 to Renewed Facility Operating License No. NPF-2 and Amendment No. 170 to Renewed Facility Operating License No. NPF-8 for the Joseph M. Farley Nuclear Plant (FNP), Units 1 and 2. The amendments consist of changes to the Technical Specifications in response to your application dated November 5, 2007 (Agencywide Document Access and Management System (ADAMS)
Accession No. ML073100376), as supplemented by letter dated April 7, 2008, (ADAMS Accession No. ML080990386); Specifically, dates included in TS Section 5.5.17, Containment Leakage Rate Testing Program, would be changed to resolve a timing conflict between the FNP, Unit 2 R20 refueling outage schedule and the 15-year test date for the FNP, Unit 2 Type A Containment Integrated Leak Rate Test (ILRT). Although Unit 1 does not have a current timing conflict, a similar Unit 1 change was requested for consistency.
A copy of the related Safety Evaluation is also enclosed. A Notice of Issuance will be included in the Commission's next biweekly Federal Register notice.
Sincerely,
/ra/
R. A. Jervey, Project Manager Plant Licensing Branch II-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-348 and 50-364
Enclosures:
- 1. Amendment No. 177 to NPF-2
- 2. Amendment No. 170 to NPF-8
- 3. Safety Evaluation cc w/encl: See next page DISTRIBUTION:
Public RidsAcrsAcnwMailCenterResource LPL2-1 R/F GHill (4)
RidsNrrDorlLpl2-1Resource RidsNrrDirsItsbResource RidsNrrPMRJerveyResource RidsNrrGLappertResource RidsRgn2MailCenterResource RidsOgcRpResource RidsNrrDorlDprResource Package No.: ML081630497 Amendment No.: ML081630479 Tech Spec No.: ML081660009 OFFICE NRR/LPL2- NRR/LPL2-1/ NRR/ITSB NRR/EMCB NRR/SCVB OGC NRR/LPL2-1/BC NRR/LPL2-1/PM 1/PM LA NAME RJervey GLappert RElliott KManoly RDennig MSimon MWong RJervey DATE 08/07/08 08/7/08 08/06/08 05/28/08 06/02/08 07/18/08 08/14/08 9/2/08 OFFICIAL RECORD COPY
SOUTHERN NUCLEAR OPERATING COMPANY, INC.
ALABAMA POWER COMPANY DOCKET NO. 50-348 JOSEPH M. FARLEY NUCLEAR PLANT, UNIT 1 AMENDMENT TO RENEWED FACILITY OPERATING LICENSE Amendment No. 177 Renewed License No. NPF-2
- 1. The Nuclear Regulatory Commission (the Commission) has found that:
A. The application for amendment by Southern Nuclear Operating Company, Inc.
(Southern Nuclear), dated November 5, 2007, as supplemented April 7, 2008, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commission's rules and regulations set forth in 10 CFR Chapter I; B. The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C. There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations; D. The issuance of this license amendment will not be inimical to the common defense and security or to the health and safety of the public; and E. The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.
- 2. Accordingly, the license is amended by changes to the Technical Specifications, as indicated in the attachment to this license amendment; and paragraph 2.C.(2) of Renewed Facility Operating License No. NPF-2 is hereby amended to read as follows:
(2) Technical Specifications The Technical Specifications contained in Appendices A and B, as revised through Amendment No. 177, are hereby incorporated in the license. Southern Nuclear shall operate the facility in accordance with the Technical Specifications.
- 3. This license amendment is effective as of its date of issuance and shall be implemented within 30 days of issuance.
FOR THE NUCLEAR REGULATORY COMMISSION Melanie C. Wong, Chief Plant Licensing Branch II-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation
Attachment:
Changes to the Technical Specifications Date of Issuance: September 2, 2008
ATTACHMENT TO LICENSE AMENDMENT NO. 177 TO RENEWED FACILITY OPERATING LICENSE NO. NPF-2 DOCKET NO. 50-348 AND ATTACHMENT TO LICENSE AMENDMENT NO. 170 TO RENEWED FACILITY OPERATING LICENSE NO. NPF-8 DOCKET NO. 50-364 Replace the following pages of the Renewed Facility Operating License Nos. NPF-2 and NPF-8 and Appendix A Technical Specifications with the attached revised pages. The revised pages are identified by amendment number and contain marginal lines indicating the areas of change.
Remove Insert License No. NPF-2 Page 4 License No. NPF-2 Page 4 License No. NPF-8 Page 3 License No. NPF-8 Page 3 TS Page 5.5-13 5.5-13
SOUTHERN NUCLEAR OPERATING COMPANY, INC.
ALABAMA POWER COMPANY DOCKET NO. 50-364 JOSEPH M. FARLEY NUCLEAR PLANT, UNIT 2 AMENDMENT TO RENEWED FACILITY OPERATING LICENSE Amendment No. 170 Renewed License No. NPF-8
- 1. The Nuclear Regulatory Commission (the Commission) has found that:
A. The application for amendment by Southern Nuclear Operating Company, Inc.
(Southern Nuclear), dated November 5, 2007, as supplemented April 7, 2008, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commission's rules and regulations set forth in 10 CFR Chapter I; B. The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C. There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations; D. The issuance of this license amendment will not be inimical to the common defense and security or to the health and safety of the public; and E. The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.
- 2. Accordingly, the license is amended by changes to the Technical Specifications, as indicated in the attachment to this license amendment; and paragraph 2.C.(2) of Renewed Facility Operating License No. NPF-8 is hereby amended to read as follows:
(2) Technical Specifications The Technical Specifications contained in Appendices A and B, as revised through Amendment No. 170, are hereby incorporated in the license. Southern Nuclear shall operate the facility in accordance with the Technical Specifications.
- 3. This license amendment is effective as of its date of issuance and shall be implemented within 30 days of issuance.
FOR THE NUCLEAR REGULATORY COMMISSION Melanie C. Wong, Chief Plant Licensing Branch II-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation
Attachment:
Changes to the Technical Specifications Date of Issuance: September 2, 2008
SAFETY EVALUATION BY THE OFFICE OF NUCLEAR REACTOR REGULATION RELATED TO AMENDMENT NO. 177 TO RENEWED FACILITY OPERATING LICENSE NO. NPF-2 AND AMENDMENT NO. 170 TO RENEWED FACILITY OPERATING LICENSE NO. NPF-8 SOUTHERN NUCLEAR OPERATING COMPANY, INC.
JOSEPH M. FARLEY NUCLEAR PLANT, UNITS 1 AND 2 DOCKET NOS. 50-348 AND 50-364
1.0 INTRODUCTION
By application dated November 5, 2007, to the U.S. Nuclear Regulatory Commission (NRC)
(Agencywide Documents Access and Management System (ADAMS) Accession No. ML073100376), and supplemented by letter dated April 7, 2008, (ADAMS Accession No. ML080990386), the Southern Nuclear Operating Company, Inc. (SNC, the licensee) submitted a request for changes to the Joseph M. Farley Nuclear Plant (FNP), Units 1 and 2, Technical Specifications (TS). The requested changes would revise Facility Operating License No. NPF-2 and Facility Operating License No. NPF-8 for FNP, Units 1 and 2, respectively. Specifically, dates included in TS Section 5.5.17, Containment Leakage Rate Testing Program, would be changed to resolve a timing conflict between the Unit 2 R20 refueling outage schedule and the 15-year test date for the FNP Unit 2 Type A Containment Integrated Leak Rate Test (ILRT), which has a required completion date of March 2010. A similar Unit 1 change is proposed for consistency.
The April 7, 2008, letter provided clarifying information that did not change the November 5, 2007 application and the initial proposed no significant hazards consideration determination.
2.0 REGULATORY EVALUATION
Title 10 of the Code of Federal Regulations (10 CFR) Part 50, Appendix J, Option B requires that a Type A test be conducted at periodic intervals based on historical performance of the overall containment system. Farley TS 5.5.17, Containment Leakage Rate Testing Program, requires that leakage rate testing be performed as required by 10 CFR Part 50, Appendix J, Option B, as modified by approved exemptions, and in accordance with the guidelines contained in Regulatory Guide (RG) 1.163, Performance-Based Containment Leak-Test Program, dated September 1995. This RG endorses, with certain exceptions, Nuclear Energy Institute (NEI) report NEI 94-01, Revision 0, Industry Guideline for Implementing Performance-Based Option of 10 CFR Part 50, Appendix J, dated July 26, 1995.
The Type A test is an overall (integrated) leakage rate test of the containment structure.
NEI 94-01 specifies an initial test interval of 48 months, but allows an extended interval of 10 years, based upon two consecutive successful tests. There is also a provision for extending the test interval an additional 15 months in certain circumstances. The most recent two Type A tests at Farley for each unit have been successful, so the current test interval requirement would normally be 10 years. However, in a request dated April 4, 2002, (ADAMS Accession No. ML020990040, the licensee proposed a one-time deferral of the Type A ILRT by extending the ten (10) year interval to fifteen (15) years. On March 21, 2003, the NRC staff granted this request via License Amendment Nos. 159 and 150 for FNP Units 1 and 2, respectively (ADAMS Accession No. ML030800326). Based on the approved change, the current TS require the next Type A test to be performed by March 2009 for Unit 1 and March 2010 for Unit 2.
3.0 TECHNICAL EVALUATION
The FNP Units 1 and 2 containments are prestressed, reinforced concrete cylindrical structures with a shallow domed roof and a reinforced concrete foundation slab with provision for a reactor cavity at the center. The cylindrical portion of the containment is prestressed by a post-tensioning system composed of horizontal and vertical tendons. The dome has a three-way tendon pattern in which groups of tendons intersect at 120 degrees. The concrete foundation is a conventionally reinforced mat. A continuous access gallery is provided beneath the base slab for installation and inspection of the vertical tendons. A 1/4-inch thick welded steel liner is attached to the inside face of the concrete. The floor liner is installed on top of the foundation slab and is then covered with concrete. There are also penetrations (piping and electrical, an equipment hatch, and personnel-locks) that pass through the containment pressure boundary. The leak tight integrity of the penetrations and isolation valves are verified through Type B and Type C local leak rate tests (LLRTs) and the overall leak-tight integrity and structural integrity of the primary containment is verified through a Type A integrated leak rate test (ILRT)
The licensee is requesting an extension to the date required to conduct the next Type A test for both Unit 1 and Unit 2. The current requirement specifies that The next Type A test, after the March 1994 test for Unit 1 and the March 1995 test for Unit 2, shall be performed within 15 years Specifically, the licensee is proposing to conduct the next Type A test during refueling outage R22 (Spring 2009) for Unit 1 and during refueling outage R20 (Spring 2010) for Unit 2. In the licensees supplemental letter dated April 7, 2008, the licensee clarified that these outages will start no later than April 18, 2009, for the Unit 1 Spring 2009 refueling outage and April 24, 2010, for the Unit 2 Spring 2010 refueling outage. Thus, the licensees request amounts to an extension of approximately one month for each unit, over and above the 5-year extension that was granted March 21, 2003.
Industry experience has demonstrated that Type B and C testing detect a large percentage of containment leakage and that the percentage of containment leakage detected by Type A testing is very small. Extending the test interval by approximately one month does not significantly increase potential leakage paths not otherwise identified by Type B and C testing. In the NRCs previously approved extension of the ILRT, the interval was extended from 10 to 15 years. The test interval extension was supported by the licensees risk assessment, which was reviewed and documented in the associated Safety Evaluation (SE). This SE concluded that the combined risk impact of the test interval extension, in terms of total integrated plant risk, large early release frequency, and conditional containment failure probability, is small and supportive of the change.
The licensee did not perform a risk assessment of further extending the test interval for the ILRT by one more month. However, the NRC staff has determined that an additional risk assessment is not warranted in this particular case due to the relatively small interval extension. The licensee justified the previous change based on historical plant specific containment leakage testing program results and containment in-service inspection program (CISI) results, supported by a risk-informed analysis. Because of the short extension sought, the basis and conclusions previously determined in SNC letters dated April 4, 2002 (ADAMS Accession No. ML020990040) and January 9, 2003 (ADAMs accession No. ML030140064) are valid and remain unchanged.
The NRC staff concluded that the existing program is sound and adequately manages the structural and leak tight integrity of FNP Units 1 and 2. Based on a review of the previously approved Type A test extension and its associated risk assessment, the licensees CISI results, and the limited additional time added to the interval, it is concluded that reasonable assurance of safety will be maintained, and that the requested extension should be granted.
4.0 STATE CONSULTATION
In accordance with the Commission's regulations, the State of Alabama official was notified of the proposed issuance of the amendments. The State official had no comments.
5.0 ENVIRONMENTAL CONSIDERATION
The amendments change a requirement with respect to installation or use of a facility component located within the restricted area as defined in 10 CFR Part 20 [and change the surveillance requirements]. The NRC staff has determined that the amendments involve no significant increase in the amounts and no significant change in the types of any effluents that may be released offsite and that there is no significant increase in individual or cumulative occupational radiation exposure. The Commission has previously issued a proposed finding that the amendments involve no significant hazards consideration, and there has been no public comment on such finding [73 FR 5229]. Accordingly, the amendments meet the eligibility criteria for categorical exclusion set forth in 10 CFR 51.22(c)(9). Pursuant to 10 CFR 51.22(b) no environmental impact statement or environmental assessment need be prepared in connection with the issuance of the amendments.
6.0 CONCLUSION
The Commission has concluded, based on the considerations discussed above, that (1) there is reasonable assurance that the health and safety of the public will not be endangered by operation in the proposed manner, (2) such activities will be conducted in compliance with the Commission's regulations, and (3) the issuance of the amendments will not be inimical to the common defense and security or to the health and safety of the public.
Principal Contributors: B. Lee H. Ashar B. Titus N. Karipineni Date: September 2, 2008
Joseph M. Farley Nuclear Plant, Units 1 & 2 cc:
Mr. J. Randy Johnson Vice President - Farley Joseph M. Farley Nuclear Plant 7388 North State Highway 95 Columbia, AL 36319 Mr. B. D. McKinney, Licensing Manager Southern Nuclear Operating Company, Inc.
P.O. Box 1295 Birmingham, AL 35201-1295 Mr. M. Stanford Blanton Balch and Bingham Law Firm P.O. Box 306 1710 Sixth Avenue North Birmingham, AL 35201 Mr. J. Gasser Executive Vice President Southern Nuclear Operating Company, Inc.
P.O. Box 1295 Birmingham, AL 35201 State Health Officer Alabama Department of Public Health 434 Monroe St.
Montgomery, AL 36130-1701 Chairman Houston County Commission P.O. Box 6406 Dothan, AL 36302 Resident Inspector U.S. Nuclear Regulatory Commission 7388 N. State Highway 95 Columbia, AL 36319 William D. Oldfield SAER Supervisor Southern Nuclear Operating Company, Inc.
P.O. Box 470 Ashford, AL 36312