First Revised NRC Order EA-03-009 Establishing Interim Inspection Requirements for Reactor Pressure Vessel Heads at Pressurized Water Reactors (Pwrs) - Nonvisual Nondestructive Examination Inspection Results
ML081510799
Person / Time
Site: Watts Bar Tennessee Valley Authority icon.png
Issue date: 05/27/2008
From: Lorek M
Tennessee Valley Authority
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
EA-03-009, TAC MC0576, TAC MC8543, TAC MD3766, TAC MD8204 AREVA 51-9073686-001
Download: ML081510799 (11)


Text

Tennessee Valley Authority, Post Office 2000, Spring City, Tennessee 37381-2000 Mike Skaggs Site Vice President, Watts Bar Nuclear Plant MAY 2 7 2008 10 CFR 2.202 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555-0001 Gentlemen:

In the Matter of ) Docket No. 50-390 Tennessee Valley Authority WATTS BAR NUCLEAR PLANT (WBN) UNIT 1 - FIRST REVISED NRC ORDER EA 009 ESTABLISHING INTERIM INSPECTION REQUIREMENTS FOR REACTOR PRESSURE VESSEL HEADS AT PRESSURIZED WATER REACTORS (PWRs) -

NONVISUAL NONDESTRUCTIVE EXAMINATION INSPECTION RESULTS

References:

1) TVA letter to NRC dated October 4, 2005, 'Watts Bar Nuclear Plant (WBN) Unit 1 - NRC First Revised Order EA-03-009 Establishing Interim Inspection Requirements for Reactor Pressure Vessel Heads at Pressurized Water Reactors - Request for Relief"
2) NRC letter to TVA dated January 27, 2006, 'Watts Bar Nuclear Plant, Unit 1 - Request for Relaxation from the First Revised NRC Order EA-03-009, Dated February 20, 2004, Deferral of Non-visual Nondestructive Examinations (TAC No. MC8543)"
3) TVA letter to NRC dated March 3, 2008, 'Watts Bar Nuclear Plant (WBN)

Unit 1 - Request for Relaxation from Requirements of First Revised NRC Order EA-03-009"

4) NRC letter to TVA dated March 12, 2008, 'Watts Bar Nuclear Plant (WBN) Unit 1 - Relaxation from Requirements of First Revised NRC Order EA-03-009 (TAC No. MD8204)"
5) TVA letter to NRC dated December 10, 2003, 'Watts Bar Nuclear Plant (WBN) Unit 1 - NRC Order EA-03-009 - Interim Inspection Requirements for Reactor Pressure Vessel Heads (TAC No. MB7667) and Bulletin 2003 Leakage from Reactor Pressure Vessel Lower Head Penetrations and Reactor Coolant Pressure Boundary Integrity (TAC No. MC0576)"

Printed on recycled paper

U.S. Nuclear Regulatory Commission Page 2 MAY 2 7 2008

6) TVA letter to NRC dated January 26, 2007, 'Watts Bar Nuclear Plant (WBN) Unit 1 - First Revised NRC Order EA-03-009 Establishing Interim Inspection Requirements for Reactor Pressure Vessel Heads at Pressurized Water Reactors (PWRs) - Bare Metal Inspection Results"
7) TVA Letter to NRC dated December 6, 2006, "Sequoyah Nuclear Plant (SQN) Units 1 and 2 and Watts Bar Nuclear Plant (WBN) Unit 1 -

American Society of Mechanical Engineers (ASME) Boiler and Pressure Vessel Code,Section XI - Reactor Pressure Vessel Head (RPVH)

Penetrating Tube Remote Inner-Diameter Temper Bead (IDTB) Repair-Generic Request for Relief G-RR-2"

8) TVA Letter to NRC dated December 14, 2007, "Sequoyah Nuclear Plant (SQN) Units 1 and 2 and Watts Bar Nuclear Plant (WBN) Unit 1 -

American Society of Mechanical Engineers (ASME) Boiler and Pressure Vessel Code,Section XI - Reactor Pressure Vessel Head (RPVH)

Penetrating Tube Remote Inner-Diameter Temper Bead (IDTB) Repair-Generic Request for Relief G-RR Response to Request for Additional Information (RAI)

9) NRC Letter to TVA dated February 8, 2008, 'Watts Bar Nuclear Plant, Unit 1 - Safety Evaluation of Relief Request G-RR-2, Proposed Alternative to American Society of Mechanical Engineers Boiler and Pressure Vessel Code,Section XI, Reactor Pressure Vessel Head Penetration Tube Remote Inner-Diameter Temper Bead Repair (TAC NO. MD3766).

This letter provides the WBN Unit 1 60-day response to the reporting requirements listed in Section IV, Paragraph E of the First Revised NRC Order EA-03-009 dated February 20, 2004, for the non-visual nondestructive examination (NDE) of the reactor pressure vessel head (RPVH) closure as required by Section IV.C.(5)(b) of the Order. This inspection was deferred with NRC approval until after the WBN Cycle 8 refueling outage due to steam generator replacement project (see Reference 1 and 2). In addition, TVA requested and received relaxation, in accordance with Section IV.F of the Order, regarding inspection of a specific nozzle (see Reference 3 and 4). The NDE inspections were completed in March 2008.

By letter dated December 6, 2006 as supplemented by letter dated December 14, 2007, (reference 7 and 8), TVA requested NRC's approval for the use of an alternative repair/replacement methodology for the RPVH penetration nozzles and J-groove welds for Watts Bar Unit 1 in the event that in-service examination results were determined unacceptable. Pursuant to 1.0 CFR 50.55a(g)(6)(i), the NRC granted TVA Relief Request G-RR-2 on February 8, 2008 (reference.9). Subsequent to this approval, TVA completed

U.S. Nuclear Regulatory Commission Page 3 MAY 2 7 2008 the required volumetric examination of the RPVH as required by Section IV.C.(5)(b) of the Order during the WBN Cycle 8 refueling outage. Because no recordable degradations requiring repairs or replacement were detected during the performance of these examinations, TVA did not implement Relief Request G-RR-2 for WBN Unit 1.

WBN Unit 1 RPVH has a low susceptibility to primary water stress corrosion cracking as defined by Section IV, paragraph B of the Order. Based on the results of the RPVH inspections which included both bare metal visual examinations (see Reference 5 and 6) and NDE testing by AREVA, TVA confirmed that there are no indications of RPVH degradation or primary water stress corrosion cracking of the weldments associated with the RPVH penetration nozzles for Unit 1. provides the AREVA NDE Report Summary.

There are no regulatory commitments associated with this submittal. If you have any questions concerning this matter, please call me at (423) 365-1824.

I declare under penalty of perjury that the foregoing is true and correct. Executed on this 2 7 th day of May 2008.

Sincerely, Mich (Acting for M. D. Skaggs Site Vice President)

Enclosure cc: See Page 4

U.S. Nuclear Regulatory Commission Page 4 MAY 2 7 2008 Enclosure cc (Enclosure):

NRC Resident Inspector Watts Bar Nuclear Plant 1260 Nuclear Plant Road Spring City, Tennessee 37381 ATTN: Patrick D. Milano, Project Manager U.S. Nuclear Regulatory Commission Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation MS 08H4 Washington, DC 20555-0001 U.S. Nuclear Regulatory Commission Region II Sam Nunn Atlanta Federal Center 61 Forsyth St., SW, Suite 23T85 Atlanta, Georgia 30303

ENCLOSURE 1 TENNESSEE VALLEY AUTHORITY (TVA)

WATTS BAR NUCLEAR PLANT (WBNO UNIT 1 AREVA REPORT NUMBER 51-9073686-001

20441012 (3/30,2006)

ýA. ENGINEERI NGI NFORMATION RECORD AR EVA Document Identifier 51- 9073686 - 001 Title Watts Bar Unit 1, Cycle 8 - Reactor Head Inspection .Report PREPARED BY: !REVIEWED BY:

Name MG Hacker Name <.2 .

Signaturee/ -:'J /' 1 ' ... Date te . . Signaturre Date ate__._:...

Technical Manager Statement: Initia~ls: .______.

Reviewer is Independent.

,Remarks:

This document contains the description, resulits, and associated documentation of the NDE examinations performed on the Watts: Bar, Unit 1 RPV clos~ure head during the Cycle 8 outage. The examinations included ultrasonic examination of 78 CRDM penetrations, 1 vent line, and 4 Auxiliary Head Adapter

(AHA) dissimilar metal Welds. No evidence of cracking or leak path was detected on any of the CRDM nozzles. No evidence of cracking was :detected in the vent line nozzle or any of the AHA dissimilar metal welds. The vent line J-groove weld and. end of nozzle was also. examined using liquid penetrant techniques:. No indications were reported on the Ventline J-groove weld and nozzle end.

R e p o r t C o n te n t s ... _es_1_-_; _ _ 5 Signature Page I Page 1 of 1 Section B, Tab 6: Pages 1 - 3 Section C, Tab 1 Pages 1 - 40 Record of Revision.: Page I. of 1 Section B, Tab 7 Pages I - 2 Section C, Tab 2 Pages 1 - 50 Table of Contents Pages*1 -2 Section B., Tab _Pages -24 Section C, Tab:.3 Pages 1 -44 Section A Page 1. of I Section B, Tab 9 Pages 1 - 4 Section C, Tab 4 Pages I - 14 Section A, Tab 1 Pages 1 - 5. Section B., Tab 10 .Pag.es1 - 5 Section C, Tab 5 Pages 1 -41

  • Section A, Tab 2 Pages 1 -.1.1 Section B, Tab 11 Pages 1 - 13
Section A, Tab 3 Pages 1 -:5 Section B, Tab 12 Pages 1 - 13 ............

C Section A, Tab 4 Pages: 1 - 2*05 Section B, Tab 13 Pages 1.- 13 Section A, Tab 5 Pages 1-.40 Section B, Tab 14 ... Pages 1 - 3 Section A, Tab 6.- Pages.1 -2 Section B, Tab 15 . --. Pages1-.2 1 ... .. ....

Section B Page 1f:.

of 1 Section_ B, Tab 16. Page1-of 1o ........

Section B, Tab 1 Pages 1-3 ..Section. B, Tab 17 Page. of. 1 i Section B, Tab 2 Pages I - 3 Section B, Tab 18 Page 1 of 1 *i Section B, Tab 3 Pages 1 -6. Section B, Tab 19 Page 1 .of 1 . ..... _ .. .

Section B,, Tab 4 Pa e 1 --3 Section B, Tab 20 -Pages,. 14 _____________

Section B, Tab 5 Pages 1 -3 Section C I Page. 1 of 1: __ . .....

Any illegible po.tions of the inserted pictures are not intended to.be used for data interpretation. and are therefore not essential nor required to be legible for the purposes of this summary.

AREVA NPIlnc., an AREVA and Siemens company Page I of 577

AR EVA TVA Watts Bar, Unit 1 Cycle 8 RPVH Penetration Examination Report Summary 51-9073686-000 Section A, Tab 1 Page 1 of 5

AR EVA Examination Summary Introduction During the Watts Bar, Unit 1, 2008 Cycle 8 refueling outage, AREVA NP performed a comprehensive examination of the reactor vessel (RPV) head penetrations to meet the First Revised NRC Order EA-03-009 issued February 20, 2004. AREVA NP performed remote ultrasonic (UT) examinations of 78 control rod drive mechanism (CRDM) penetrations and 1 vent line penetration. A liquid penetrant (PT) examination was also performed on the vent line J-groove weld surface. Each penetration was examined from the under-side of the reactor vessel head using "Bottom-Up" and "Blade" UT tools delivered by a positioning manipulator (NUMAN). Data acquisition and data analysis was performed remotely from outside the radiation controlled area using the ZETEC Ultravision software.

In addition, 4 Auxiliary Head Adapter (AHA) dissimilar metal welds were ultrasonically examined to ASME Section XI, Appendix VIII, requirements. These welds are not applicable to the NRC Order. These welds were examined remotely from the ID from the under-side of the reactor vessel head using a "Bottom-Up" rotating UT probe delivered by a positioning manipulator (NUMAN). Data acquisition and data analysis was performed remotely from outside the radiation controlled area using the AREVA NP ACCUSONEX software.

Results No crack indications or UT leak path signals were detected in the 78 CRDM penetrations. No crack indications were detected in the vent line penetration with either the UT or PT examinations. No crack indications were detected in the 4 AHA dissimilar metal welds.

Weld fabrication indications were observed on nearly all CRDM nozzles and were individually recorded on data sheets when the indication extended into the tube wall by more than 10% of the tube wall thickness. These indications are typical for this weld configuration and none are significant or connected to the wetted surface. In addition, tube wall inclusions were observed in several penetrations and were separately recorded on the indication data sheet when they were clearly discernable in the data. Other areas of "noise bands" were noted in some of the penetrations and were noted in the remarks section of the data sheet for future reference.

These areas are attributed to regions of the tube that may contain small pores that provide some reflectivity. These "noise bands" and tube wall inclusions have been observed on other heads manufactured by Rotterdam and are typical for this manufacturer.

CRDM Penetration Examinations CRDM penetrations 1 through 73 were examined with the blade probe in accordance with AREVA NP NDE examination procedure 54-ISI-603-003, "Automated Ultrasonic Examination of RPV Closure Head Penetrations Containing Thermal Sleeves". CRDM penetrations 74 through 78 were examined with the rotating probe in accordance with AREVA NP NDE examination procedure 54-ISI-604-004, "Automated Ultrasonic Examination of Open Tube RPV Closure Head Penetrations" with SDCN 30-9063103-000 and SDCN 30-9035469-002.

51-9073686-000 Section A, Tab 1 Page 2 of 5

AR EVA The application of the techniques used for these examinations are described in more detail in the "Inspection Plan" included in Section A, Tab 2 of this report. The procedures are included in Section C of this report. The UT examination data sheets are included in Section A, Tab 4 of this report.

The coverage obtained for all CRDM nozzles except nozzle 74 meets the requirements of the First Revised NRC Order EA-03-009 issued February 20, 2004. Consistent with the NRC Order, TVA has performed an analysis to determine the distance below the J-Groove weld where the operating stresses decay to 20ksi tension. The minimum required examination zone below the lowest point of the J-Groove weld is the greater of the 20ksi boundary value below the weld or 1". CRDM penetrations 1-78 were scanned starting from the taper transition point at the bottom of each nozzle up to at least two inches above the highest point of the J-Groove weld. An ID chamfer on the end of each CRDM nozzle precludes coverage to the very end of the nozzle. Coverage for all nozzles except nozzle 74 was obtained over a distance that includes the greater of the 20ksi boundary value below the weld or 1" below the lowest point of the J-Groove weld up to at least 2 inches above the highest point of the J-Groove weld. A listing of the coverage obtained for each nozzle above and below the weld is provided in the "Examination Summary Table" included in Section A, Tab 3 of this report.'

The distance between the toe of the J-Groove weld and the taper to cylinder transition at the lowest point of the J-Groove weld on nozzle 74 precludes obtaining the required coverage value of 1" below the lowest point of the J-Groove weld. Nozzle 74 coverage was limited to 0.91" due to the proximity of the J-groove weld to the ID chamfer. This information was provided to TVA personnel at the time of discovery for disposition.

Scanning was performed in an up and down fashion (comb pattern) parallel to the penetration axis. Indexing of the probe-head was performed in the circumferential direction. The positive scan direction was defined to be upward, and positive index was defined to be counter-clockwise looking up from the bottom of the vessel head. The circumferential scan distance covered from 0 degrees to positive 370 degrees, yielding a 10-degree overlap. De-mineralized water was used as the coupling agent between the transducer face and the penetration surface.

The blade probe uses a 5 MHz, circumferentially oriented, time of flight diffraction (TOFD) beam in the tube for examination. The rotating probe-head houses four ultrasonic transducers as outlined in Table 1 below. Both forward scatter, time of flight diffraction (TOFD), and backward scatter techniques are utilized. The 301L and 451LE transducers are configured in the forward scatter configuration, and the 60'S transducers in the backward scatter configuration. Each of these transducers provides detection and characterization information for (ID/OD) connected axial, circumferential, and off-axis flaws contained within the penetration wall.

51-9073686-000 Section A, Tab 1 Page 3 of 5

AR A R EVA Tablex i - CRDM Rotatn rb rCo1 ngurati Angle/ Mode Freq Beam Application (MHz) Dir. Application 00 L 5.0 N/A Flaw detection, length sizing, and weld profiling 300 L - TOFD 5.0 Axial Circumferential, axial, and off-axis flaw detection and characterization Axial 60' S - Backscatter 2.25 Down DownI Circumferential and off-axis flaw detection and characterization Axial, circumferential and off-axis flaw detection and 450 LE - TOFD 5.0 Circ. Icharacterization Vent Line Penetration Examination The Vent Line was examined with both liquid penetrant (PT) and ultrasonic testing (UT) to satisfy the First Revised NRC Order EA-03-009 requirements. The vent line penetration tube was examined with UT using the vent line probe in accordance with AREVA NP NDE examination procedure 54-ISI-605-04, "Automated Ultrasonic Examination of RPV Closure Head Small Bore Penetrations". The procedure is included in Section C of this report. The UT examination data sheets are included in Section A, Tab 4 of this report. No flaws were detected in the vent line nozzle material.

Scanning was performed in an up and down fashion (comb pattern) parallel to the penetration axis. Indexing of the probe-head was performed in the circumferential direction. The positive scan direction was defined to be upward, and positive index was defined to be counter-clockwise looking up from the bottom of the vessel head. The circumferential scan distance covered from 0 degrees to positive 370 degrees, yielding a 10-degree overlap. De-mineralized water was used as the coupling agent between the transducer face and the penetration surface.

The vent line J-groove weld surface was examined with the PT method in accordance with AREVA NP examination procedure 54-1SI-200-08, "Color Contrast Solvent Removable Liquid Penetrant Examination of Components". No indications were detected during this examination. The PT examination data sheet is included in Section A, Tab 6 of this report.

The Vent Line UT probe-head houses five separate transducers as shown below in Table 2.

These transducers provide detection information for (ID/OD) connected axial and circumferential flaws contained within the penetration wall.

51-9073686-000 Section A, Tab 1 Page 4 of 5

AR EVA Thb~e 2 eht::Line P:

- btr t'o Poe oni**ato Angle/ Mode Freq. Beam Application (MHz) Dir.

00 L 5.0 N/A Weld profiling 450 5.0 Circ. Axial flaw detection Backscatter CW 450S 5.0 Circ. Axial flaw detection Backscatter CCW 700 S Axial Backscatter 5.0 Up Circumferential flaw detection 70° S 5.0 Axial Circumferential flaw detection Backscatter Down I AHA Dissimilar Metal Weld Examinations The AHA dissimilar metal welds were examined with a rotating probe in accordance with AREVA NP NDE examination procedure 54-ISI-824-000, "ID Automated Ultrasonic Examination of Small Bore Dissimilar Metal Welds". The AHA UT probe-head houses four separate transducers as shown below in Table 3. These transducers provide detection information for ID surface connected axial and circumferential flaws. No flaws were detected during the examination.

Scanning was performed in the circumferential direction using a raster pattern perpendicular to the penetration axis. Indexing of the probe-head was performed in the axial direction. The positive scan direction was defined to be counter-clockwise looking up from the bottom of the vessel head and positive index was defined to be upward. The circumferential scan distance covered from 0 degrees to positive 370 degrees, yielding a 10-degree overlap. De-mineralized water was used as the coupling agent between the transducer face and the penetration surface.

Tbe 3-.. AHA DisiilarMeta00We Prbld ofrtiOn Angle/Mode Freq. Beam Angle/ Md(MHz) Dir. Application 800 L 2.0 Up Circ. flaw detection 800 L 2.0 Down Circ. flaw detection 800 L TOFD 2.25 Circ. Axial flaw detection 600 L 2.25 Cwc. Supplemental Axial flaw Detection/Sizing 51-9073686-000 Section A, Tab 1 Page 5 of 5