ML081490511

From kanterella
Jump to navigation Jump to search
22-2008 EOC Public Meeting Summary
ML081490511
Person / Time
Site: Farley  
Issue date: 05/28/2008
From: Scott Shaeffer
NRC/RGN-II/DRP/RPB2
To: Jerrica Johnson
Southern Nuclear Operating Co
References
Download: ML081490511 (3)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION II SAM NUNN ATLANTA FEDERAL CENTER 61 FORSYTH STREET, SW, SUITE 23T85 ATLANTA, GEORGIA 30303-8931 May 28, 2008 Mr. J. Randy Johnson Vice President - Farley Southern Nuclear Operating Company, Inc.

7388 North State Highway 95 Columbia, AL 36319

SUBJECT:

PUBLIC MEETING

SUMMARY

- JOSEPH M. FARLEY NUCLEAR PLANT DOCKET NOS. 50-348, 50-364

Dear Mr. Johnson:

This refers to the meeting conducted in Dothan, AL on May 22, 2007. The Region II Deputy Regional Administrator, Mr. Victor McCree, and the Senior Resident Inspector assigned to the Joseph M. Farley Nuclear Plant, Mr. Eddy Crowe, met with Southern Nuclear Operating Company representatives to discuss the NRCs Reactor Oversight Process and the NRCs annual safety performance assessment for the period of January 1, 2007 - December 31, 2007.

The major topics addressed were the NRCs assessment program and the results of the licensees assessment. A listing of licensee and public attendees and the information presented are available from the NRCs document system (ADAMS) as accession numbers ML081490090 and ML081490106 respectively.

In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room (PDR) or from the Publicly Available Records (PARS) component of NRC=s document system (ADAMS).

ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Should you have any questions concerning this meeting, please contact me at (404) 562-4521.

Sincerely,

/RA/

Scott M. Shaeffer, Chief Reactor Projects Branch 2 Division of Reactor Projects Docket Nos.: 50-348, 50-364 License Nos.: NPF-2, NPF-8 cc w/encls: (See page 2)

OFFICE RII:DRP RII:DRP SIGNATURE CWR /RA/

SMS /RA/

NAME CRapp SShaeffer DATE 05/28/2008 05/28/2008 E-MAIL COPY?

YES NO YES NO YES NO YES NO YES NO YES NO YES NO

SNC 2

cc w/encl:

B. D. McKinney Licensing Services Manager B-031 Southern Nuclear Operating Company, Inc.

Electronic Mail Distribution Jeffrey T. Gasser Executive Vice President Southern Nuclear Operating Company, Inc.

Electronic Mail Distribution William D. Oldfield Quality Assurance Supervisor Southern Nuclear Operating Company Electronic Mail Distribution L. Mike Stinson Vice President Fleet Operations Support Southern Nuclear Operating Company, Inc.

Electronic Mail Distribution David H. Jones Vice President Engineering Southern Nuclear Operating Company, Inc.

Electronic Mail Distribution Moanica Caston Vice President and General Counsel Southern Nuclear Operating Company, Inc.

Electronic Mail Distribution M. Stanford Blanton, Esq.

Balch and Bingham Law Firm Electronic Mail Distribution Dr. D. E. Williamson State Health Officer Alabama Dept. of Public Health Electronic Mail Distribution Mr. Mark Culver Chairman Houston County Commission P. O. Box 6406 Dothan, AL 36302 Jim Sommerville Acting Chief Environmental Protection Division Department of Natural Resources Electronic Mail Distribution Senior Resident Inspector Southern Nuclear Operating Company, Inc.

Joseph M. Farley Nuclear Plant U.S. NRC 7388 N. State Highway 95 Columbia, AL 36319

SNC 3

Letter to J. Randy Johnson from Scott M. Shaeffer dated May 28, 2008

SUBJECT:

PUBLIC MEETING

SUMMARY

- JOSEPH M. FARLEY NUCLEAR PLANT DOCKET NOS. 50-348, 50-364 Distribution w/encl:

C. Evans, RII L. Slack, RII OE Mail RIDSNRRDIRS PUBLIC R. Jervey, NRR