Text

TASK TITLE: Perform Emergency Boration for Inadequate Shutdown Margin JPM No.: SIM-110 REV: 20070301 Task No.: R-OA-033 K/A No.: 004000A4.07 Objective No.: 4.D.OA-08 K/A IMP: 3.9/3.7 EXAMINEE: RO SRO (Circle One)

EVALUATOR: DATE:

The Examinee: PASSED this JPM. TIME STARTED:

FAILED TIME FINISHED:

JPM TIME: MINUTES CRITICAL ELEMENTS: (*) 6, 7 APPROX COMPLETION TIME: 15 MINUTES CRITICAL TIME: N/A EVALUATION METHOD: LOCATION:

X PERFORM IN PLANT SIMULATE X SIMULATOR GENERAL

REFERENCES:

1. 1BwOA PRI-2, Rev. 101, Emergency Boration MATERIALS:
1. 1BwOA PRI-2, Rev. 101.

TASK STANDARDS:

1. Determine emergency boration flow from the BAST is < 30 gpm.
2. Initiate emergency boration flow from the RWST in accordance with 1BwOA PRI-2.

TASK CONDITIONS:

1. You are the Unit 1 NSO.
2. Unit 1 is in Mode 3 at Normal Operating Temperature and Normal Operating Pressure.
3. 1BwOSR 3.1.1.1-1, SHUTDOWN MARGIN DAILY VERIFICATION DURING SHUTDOWN, was completed 10 minutes ago.
4. 1BwOSR 3.1.1.1-1determined RCS Boron concentration is 58 ppm below the required Shutdown Margin.

INITIATING CUES:

1. The Unit 1 Unit Supervisor has directed you to borate the RCS in accordance with 1BwOA PRI-2, EMERGENCY BORATION.
2. Another NSO will monitor the remainder of the Main Control Board panels and address alarms as necessary.
3. Inform the Unit 1 Unit Supervisor when you have initiated RCS boration.

SIM-110 Page 1 of 6

RECORD START TIME:

PERFORMANCE STEP STANDARD CIRCLE APPLICABLE

1. Refer to 1BwOA PRI-2 Emergency Refer to 1BwOA PRI-2, SAT UNSAT N/A Boration Emergency Boration Comments:
  • Inform US/SM to evaluate CUE: As US/SM acknowledge for Emergency Plan request to evaluate for conditions.

Emergency Plan conditions.

2. Check Centrifugal Charging pump Perform the following at SAT UNSAT N/A status. 1PM05J: Comments:
  • Verify1A CV pump running.
3. Establish Boration flow from the Perform the following at SAT UNSAT N/A BAT. 1PM05J: Comments:

o Place 1CV8104, Emergency Boration Valve, C/S to OPEN.

OR o Place 1CV110A, Boric Acid to Blender Valve, CS to OPEN.

AND o Place 1CV110B, Boric Acid Blender to Charging Pump Valve, C/S to OPEN.

4. Start Boric Acid Transfer pump. Perform the following at SAT UNSAT N/A 1PM05J: Comments:
  • Place 1AB03P, Unit 1 Boric Acid Transfer pump, to START.

SIM-110 Page 2 of 6

PERFORMANCE STEP STANDARD CIRCLE APPLICABLE

5. Determine BAST Emergency Perform the following at SAT UNSAT N/A Boration flow inadequate. 1PM05J: Comments:

o If 1CV8104 used for CUE: As US, acknowledge boration:

report of inadequate

  • Check Emergency boration flow indication. Boration flow on 1FI-183A and determines it is less than 30 gpm.

OR o If 1CV110A & B used for boration:

  • Check Boration flow on recorder 1FR-110 and determines boration flow is less than 30 gpm.
  • Informs US of lack of flow indication.

EVALUATOR NOTE: Alternate path begins here.

  • 6. Align alternate boration Perform the following at SAT UNSAT N/A flowpath from the RWST. 1PM05J: Comments:
  • Place 1AB03P, Unit 1 Boric Acid Transfer pump, to STOP.
  • Place either 1CV112D AND/OR 1CV112E, RWST to Charging Pump Suction Valve(s), CS(s) to OPEN.
  • 7. Isolate charging pump suction Perform the following at SAT UNSAT N/A from the VCT. 1PM05J: Comments:
  • Place either 1CV112B AND/OR 1CV112C, VCT Outlet Isolation Valve(s) to CLOSE.
8. Maximize letdown and charging Perform the following at SAT UNSAT N/A flow. 1PM05J: Comments:

o VERIFY 120 gpm Letdown in service.

  • Place 1FK-121, Centrifugal Charging Pump Flow Control Valve, controller in MANUAL by depressing the MAN pushbutton.

SIM-110 Page 3 of 6

PERFORMANCE STEP STANDARD CIRCLE APPLICABLE

9. Align CV pump discharge Perform the following at SAT UNSAT N/A flowpath. 1PM05J: Comments:
  • Verify 1CV8105, Charging Line Containment Isolation Valve OPEN.
  • Verify 1CV8106, Charging Line Containment Isolation Valve OPEN.
  • Verify 1CV8324A, Charging to Regen Hx 1A Isolation Valve, OPEN.
  • Verify 1CV8147, Charging to RC Loop 1A Isolation Valve, OPEN.
10. Throttle 1CV121 to establish 1FI- Perform the following at SAT UNSAT N/A 121A flow at maximum for normal 1PM05J: Comments:

charging.

  • Verify/Place 1FK-121, CUE: As US, acknowledge Centrifugal Charging Pump report and inform the Flow Control Valve, examinee, that another controller in MANUAL by NSO will complete depressing the MAN 1BwOA PRI-2. pushbutton.
  • Verify/Raise demand on 1FK-121 to 100%.

o Inform Unit 1 Unit Supervisor emergency boration flow is established.

CUE: THIS COMPLETES THIS JPM.

RECORD STOP TIME:

COMMENTS:

SIM-110 Page 4 of 6

SIMULATOR SETUP INSTRUCTIONS

  • Verify/perform TQ-BR-201-0113, BRAIDWOOD TRAINING DEPARTMENT SIMULATOR EXAMINATION SECURITY ACTIONS CHECKLIST.
  • Establish the conditions of IC-8, BOL Rx startup, shutdown banks out.
  • Complete items on Simulator Ready for Training Checklist.
  • Place simulator in RUN.
  • Insert IOR ZAO1FI183A 0 to fail indicated boration flow to 0 gpm on 1FI-183A when using the emergency boration valve 1CV8104.
  • Insert IOR ZDI1CV110B CLS to fail 1CV110B closed.
  • If running the JPM repetitively, perform the following:
  • VERIFY/STOP 1AB03P, Unit 1 Boric Acid Transfer Pump.
  • VERIFY/OPEN 1CV112B AND1CV112C, VCT Outlet Isolation Valves.
  • VERIFY/CLOSED 1CV112D AND 1CV112E, RWST to Charging Pump Suction Valves.
  • PLACE 1FK-121 in AUTO and verify 1FK-121 is maintaining PZR Level in automatic.
  • Clear ALL place keeping marks from 1BwOA PRI-2.

COMMENTS:

SIM-110 Page 5 of 6

JOB PERFORMANCE MEASURE TASK CONDITIONS:

1. You are the Unit 1 NSO.
2. Unit 1 is in Mode 3 at Normal Operating Temperature and Normal Operating Pressure.
3. 1BwOSR 3.1.1.1-1, SHUTDOWN MARGIN DAILY VERIFICATION DURING SHUTDOWN, was completed 10 minutes ago.
4. 1BwOSR 3.1.1.1-1 has determined that RCS Boron concentration is 58 ppm below the required Shutdown Margin.

INITIATING CUES:

1. The Unit 1 Unit Supervisor has directed you to borate the RCS in accordance with 1BwOA PRI-2, EMERGENCY BORATION.
2. Another NSO will monitor the remainder of the Main Control Board panels and address alarms as necessary.
3. Inform the Unit 1 Unit Supervisor when you have initiated RCS boration.

SIM-110 Page 6 of 6

TASK TITLE: Lower 1C SI Accumulator Level JPM Number: SIM-206 Rev: 20070301 Task No.: R-SI-002 K/A No.: 006000A1.13 Objective No:. 4C.SI-03 K/A Imp.: 3.5/3.7 EXAMINEE: RO SRO (Circle One)

EVALUATOR: DATE:

The Examinee: PASSED this JPM. TIME STARTED:

FAILED TIME FINISHED:

JPM TIME: MINUTES CRITICAL ELEMENTS: (*) 6, 7 APPROX COMPLETION TIME: 25 MINUTES CRITICAL TIME: 40 MINUTES EVALUATION METHOD: LOCATION:

X PERFORM IN PLANT SIMULATE X SIMULATOR GENERAL

REFERENCES:

1. BwAR 1-5-C1, ACCUM 1C LEVEL HIGH/LOW, Rev. 8E2
2. BwOP SI-6, LOWERING SI ACCUMULATOR LEVEL, Rev. 17.
3. Technical Specification 3.5.1 MATERIALS:
1. Copy of BwOP SI-6, Rev. 17.

TASK STANDARDS:

1. Align SI Accumulator 1C drain path in accordance with BwOP SI-6.
2. Lower 1C SI Accumulator level to within Tech Spec limits within 40 minutes in accordance with Tech Spec 3.5.1.

TASK CONDITIONS:

1. This is a time critical JPM.
2. You are the Unit 1 Assist NSO.
3. All systems are properly aligned for the current Unit 1 mode.
4. Annunciator 1-5-C1, ACCUM 1C LEVEL HIGH/LOW alarmed 20 minutes ago.
5. BwAR 1-5-C1 has been addressed by the Unit 1 NSO.

INITIATING CUES:

1. The Unit 1 Unit Supervisor directs you to lower 1C SI Accumulator level to 58% by draining to the HUT in accordance with BwOP SI-6, Lowering SI Accumulator Level, step F.2.

CUE: Hand examinee copy of BwOP SI-6.

2. Equipment operators are standing by in the field to assist you.
3. Another NSO will monitor the remainder of the Main Control Board panels and address alarms as necessary.
4. Inform the Unit 1 Unit Supervisor when you have restored 1C SI Accumulator level to 58%.

SIM-206 Page 1 of 8

RECORD START TIME:

PERFORMANCE STEP STANDARD CIRCLE APPLICABLE

1. Refer to BwOP SI-6, Lowering SI Refer to BwOP SI-6: SAT UNSAT N/A Accumulator level.
  • Determine step F.2 is to Comments:

CUE: All Prerequisites, be performed (from Precautions, Limitations initiating cue).

and Actions are met.

CUE: Perform step F.2 per SM direction (from initiating cue).

NOTE: Critical Time begins when examinee understands initiating cue and accepts responsibility for task performance.

Record critical time start time:

2. Dispatch operator to Verify/Close Perform the following: SAT UNSAT N/A 1SI8971A and B, SI Test Line to Comments:

RWST/HUT Inst. Root to 1FI-SI046 and 1FI-928A/B. (step F.2.a)

NOTE: If dispatched as

  • Dispatch operator to equipment operator to Verify/Close:

verify valve positions,

  • 1SI8971A provide the following cues:
  • 1SI8971B CUE: 1SI8971A is closed.

CUE: 1SI8971B is closed.

3. Verify/Close 1SI8878C at 1PM06J. Perform the following at SAT UNSAT N/A (step F.2.b) 1PM06J: Comments:
  • Verify 1SI8878C, SI Accumulator 1C Make-Up Valve, CLOSED light LIT.

SIM-206 Page 2 of 8

PERFORMANCE STEP STANDARD CIRCLE APPLICABLE

4. Perform SI Test Line Valve Lineup Perform the following at SAT UNSAT N/A at 1PM11J. (step F.2.c) 1PM11J Comments:
  • Verify 1SI8879A, B, C, &

D, SI Accumulator 1A, B, C, & D Test Line Isolation Valves, CLOSED lights LIT.

  • Verify 1SI8877A, B, C, &

D, SI Accumulator 1A, B, C, & D Test Line Isolation Valves, CLOSED lights LIT.

  • Verify 1SI8889A, B, C, &

D, SI to Loop 1A, B, C, &

D Hot Leg Test Line Isolation Valves, CLOSED lights LIT.

  • Verify 1SI8823, SI Pumps to Cold Legs Test Line Isolation Valve, CLOSED (from MCB placard).
  • Verify 1SI8824, SI Pumps to 1B & C Hot Legs Test Line Isolation Valve, CLOSED (from MCB placard).
  • Verify 1SI8825, RH Pumps to 1A & C Hot Legs Test Line Isolation Valve, CLOSED (from MCB placard).
  • Verify 1SI8881, SI Pumps to 1A & D Hot Legs Test Line Isolation Valve, CLOSED (from MCB placard).
  • Verify 1SI8882, CV Pumps to Cold Legs Test Line Isolation Valve, CLOSED light LIT.
  • Verify 1SI8843, CV Pumps to Cold Legs Test Line Isolation Valve, CLOSED (from MCB placard).
  • Verify 1SI8890A and B, RH Pumps to 1A & D and 1B & C Cold Legs Test Line Isolation Valves, CLOSED (from MCB placard).

SIM-206 Page 3 of 8

PERFORMANCE STEP STANDARD CIRCLE APPLICABLE

5. Align HUT drain path. (step F.2.d) Dispatch operators to perform SAT UNSAT N/A NOTE: If dispatched as lineup to drain to the HUT: Comments:

equipment operator to verify valve positions, provide the following cues:

  • Verify OPEN 1SI8959 CUE: 1SI8959 is open.
  • Verify OPEN 1AB024 CUE: 1AB024 is open.
  • Verify LOCKED CLOSED 1SI8963 CUE: 1SI8963 is locked closed.
  • 6. Align SI Accumulator drain path. Perform the following at SAT UNSAT N/A (step F.2.e) 1PM11J: Comments:
  • Place 1SI8964, SI Test Lines to Radwaste Isolation Valve, C/S to OPEN.

SIM-206 Page 4 of 8

PERFORMANCE STEP STANDARD CIRCLE APPLICABLE

  • 7. Lower 1C SI Accumulator Level. Perform the following at SAT UNSAT N/A (step F.2.f) 1PM06J/1PM11J: Comments:

NOTE: Critical Time ends when o Verify 1SI8888, SI Pump accumulator level is less to Accumulator Fill Valve, than 63%. CLOSED light LIT.

Record time that 1C SI o Place 1SI8877C, SI accumulator level is <63%: Accumulator 1C Test Line

__________ Isolation Valve, C/S to OPEN.

Critical time =

  • Place 1SI8871, SI Fill/Test Line Isolation Valve, C/S to OPEN.

_________ - ___________ o Monitor SI accumulator (end time) (start time) level on 1LI-954/955 until desired level (58%) is reached.

40 minutes.

o Inform Unit 1 Unit Supervisor that 1C SI NOTE: At discretion of Accumulator level is within examiner, when Tech Spec limits when Annunciator 1-5-C1, level is <63%.

ACCUM 1C LEVEL When 1C SI Accumulator is at HIGH/LOW, clears 58% (+/- 2%), perform the provide the following following:

cue:

  • Place 1SI8871, SI CUE: 1C SI Accumulator level Fill/Test Line Isolation is 58%. Valve, C/S to CLOSED.
  • Place 1SI8877C, SI Accumulator 1C Test Line Isolation Valve, C/S to CLOSED.

SIM-206 Page 5 of 8

PERFORMANCE STEP STANDARD CIRCLE APPLICABLE

8. Restore lineup. (steps F.2.g - Perform the following to SAT UNSAT N/A F.2.k) restore the lineup to 1C SI Comments:

accumulator:

  • Place 1SI8964, SI Test Lines to Radwaste NOTE: If dispatched as Isolation Valve, C/S to equipment operator to CLOSED at 1PM11J.

verify valve positions, provide the following

  • Verify/Lock Closed cues: 1SI8963 CUE: 1SI8963 is locked closed.
  • Verify/Open 1SI8959 CUE: 1SI8959 is open.
  • Verify/Open 1AB024 CUE: 1AB024 is open.
  • Open 1SI8971A and B CUE: 1SI8971A is open.
  • Inform Unit 1 Unit CUE: 1SI8971B is open. Supervisor 1C SI Accumulator level is CUE: As US, acknowledge restored.

report.

CUE: THIS COMPLETES THIS JPM RECORD STOP TIME:

COMMENTS:

SIM-206 Page 6 of 8

SIMULATOR SETUP INSTRUCTIONS

  • Verify/perform TQ-BR-201-0113, BRAIDWOOD TRAINING DEPARTMENT SIMULATOR EXAMINATION SECURITY ACTIONS CHECKLIST.
  • Establish the conditions of IC-21, BOL 100% Power, Steady State, Equilibrium Xenon.

- OR -

  • IC-8 if JPM is being performed concurrently with JPM SIM-110 (JPM IC must be Mode 3 with RCS pressure greater than 1000 psig or higher mode)
  • Complete items on Simulator Ready for Training Checklist.
  • Place simulator in RUN.
  • OPEN Monitor Screen and perform the following:
  • SET SIMN2ACC[3] = 1228 to lower 1C SI Accumulator Pressure within limits.
  • If running the JPM repetitively, set the above monitor items prior to each performance.

COMMENTS:

SIM-206 Page 7 of 8

JOB PERFORMANCE MEASURE TASK CONDITIONS:

1. This is a time critical JPM.
2. You are the Unit 1 Assist NSO.
3. All systems are properly aligned for the current Unit 1 mode.
4. Annunciator 1-5-C1, ACCUM 1C LEVEL HIGH/LOW alarmed 20 minutes ago.
5. BwAR 1-5-C1 has been addressed by the Unit 1 NSO.

INITIATING CUES:

1. The Unit 1 Unit Supervisor directs you to lower 1C SI Accumulator level to 58% by draining to the HUT in accordance with BwOP SI-6, Lowering SI Accumulator Level, step F.2.
2. Equipment operators are standing by in the field to assist you.
3. Another NSO will monitor the remainder of the Main Control Board panels and address alarms as necessary.
4. Inform the Unit 1 Unit Supervisor when you have restored 1C SI Accumulator level to 58%.

SIM-206 Page 8 of 8

TASK TITLE: Secure 1B RH Pump from Shutdown Cooling and Align for Cold Leg Injection JPM Number: SIM-400P Rev. 20070301 Task No: R-RH-005 K/A No.: 005000A4.01 Objective No.: 4C.RH-06 K/A Imp.: 3.6 EXAMINEE: RO EVALUATOR: DATE:

The Examinee: PASSED this JPM. TIME STARTED:

FAILED TIME FINISHED:

JPM TIME: MINUTES Critical Elements: (*) 2, 3, 4, 5 Approx. Completion Time: 25 MINUTES Critical Time: N/A EVALUATION METHOD: LOCATION:

X PERFORM IN PLANT SIMULATE X SIMULATOR GENERAL

REFERENCES:

1. BwOP RH-11, SECURING THE RH SYSTEM FROM SHUTDOWN COOLING, Rev 20.

MATERIALS:

1. Copy of BwOP RH-11, Rev 20 TASK STANDARDS:
1. Remove 1B RH Train from shutdown cooling.
2. Secure the 1B RH Pump.
3. Align 1B RH Pump for cold leg injection.

TASK CONDITIONS:

1. You are the Unit 1 Assist NSO.
2. Unit 1 is in Mode 5.
3. RH Train swap is in progress with both RH trains running.
4. RH letdown is aligned to 1A RH pump.
5. ALL SVAG valves are energized.

INITIATING CUES:

1. The Unit Supervisor directs you to secure the 1B RH pump and align the 1B RH pump for cold leg injection in accordance with BwOP RH-11, SECURING THE RH SYSTEM FROM SHUTDOWN COOLING.

CUE: Hand examinee marked up copy of BwOP RH-11.

2. BwOP RH-11 steps F.1 thru F.8 are complete.
3. Equipment operators are standing by in the field to assist you.
4. Another NSO will monitor the remainder of the Main Control Board panels and address alarms as necessary.
5. Inform the Unit Supervisor when the 1B RH pump is aligned for cold leg injection.

SIM-400P Page 1 of 5

RECORD START TIME:

PERFORMANCE STEP STANDARD CIRCLE APPLICABLE

1. Refer to BwOP RH-11 (steps F.1 - Refer to BwOP RH-11. SAT UNSAT N/A F.8)
  • Determine step F.1 thru Comments:

F.8 are complete CUE: Provide copy of procedure to examinee.

CUE: All prerequisites, precautions, and limitations and actions are met.

  • 2. Secure 1B RH Pump. (steps F.9 - Perform the following at SAT UNSAT N/A F.10) 1PM06J: Comments:
  • Place 1B RH Pump C/S to TRIP.
  • Verify 1RH611, RH Pump 1B Miniflow Valve, C/S in AUTO.
  • 3. Align 1B RH Pump for Cold Leg Perform the following at SAT UNSAT N/A Injection. (steps F.11 - F.12) 1PM06J: Comments:

NOTE: If examinee requests US o Determine 1RH8702A, to determine if LCO Loop C to RH Pump 1B 3.4.12 must be entered Suction Valve is when closing 1RH8702A ENERGIZED.

or B, provide the

  • Place 1B RH Pump C/S to following cue: PULL OUT.

CUE: LCO 3.4.12 entry is NOT

  • Place 1RH8702A, Loop 1C required. to RH Pump 1B Suction Valve, to CLOSED.
  • Place 1RH8702B, Loop 1C to RH Pump 1B Suction Valve, to CLOSED.

o Place 1FK-619, RH Hx 1B Bypass Flow Controller in MANUAL and lower demand to 0%. (should already be in manual at 0%

from step F.7.b & c)

  • Throttle open 1RH607, RH Hx 1B Flow Control Valve, by raising POT demand to 100%.

o Verify 1SI8840, RH to Hot Leg 1A & 1C, CLOSED.

o Verify 1SI8809B, RH to Cold Legs 1B & 1C, OPEN.

  • Place 1RH8716B, RH Hx 1B Discharge Crosstie Valve, C/S to OPEN.

o Verify 1SI8804B, 1B RH Hx to CV Pump Suction Isolation Valve, CLOSED.

SIM-400P Page 2 of 5

PERFORMANCE STEP STANDARD CIRCLE APPLICABLE

  • 4 Switch 1B RH Pump Suction to Perform the following at SAT UNSAT N/A the RWST: (steps F.13-14) 1PM06J: Comments:

Prevent steam binding of the 1B RH pump suction by performing the following:

  • Determine 1B RH Pump was stopped and at least ONE Hot Leg Suction valves was closed when RCS hot leg temperature was < 260°F.
  • Place 1SI8812B, RH Pump 1B Suction from RWST Valve, C/S to OPEN.
  • 5. Complete 1B RH Pump Perform the following: SAT UNSAT N/A alignment (steps F.15 - 20)
  • Dispatch an operator to Comments:

CUE: As equipment operator, LOCK CLOSED report 1RH8734B is 1RH8734B, RH Train 1B to locked closed. CV Letdown Hx Isolation NOTE: Examinee may elect to Valve.

leave both CC pumps

  • Place 1CC9412B, CC to running. RH Hx 1B Isolation Valve, CUE: As equipment operator, C/S to CLOSE.

report 1RH8735 is locked o Stop ONE CC Pump.

closed.

  • Dispatch an equipment operator to verify 1RH8735, RH Recirc to RWST Isolation Valve, is LOCKED CLOSED.
  • Place 1B RH Pump C/S in Normal After Trip at 1PM06J.

o Verify 1SI8811B, CUE: Inform examinee another Containment Sump 1B NSO will complete RH Isolation Valve, CLOSED piping vent. light is LIT at 1PM06J.

CUE: THIS COMPLETES THIS JPM.

RECORD STOP TIME:

COMMENTS:

SIM-400P Page 3 of 5

SIMULATOR SETUP INSTRUCTIONS

  • Verify/perform TQ-BR-201-0113, BRAIDWOOD TRAINING DEPARTMENT SIMULATOR EXAMINATION SECURITY ACTIONS CHECKLIST.
  • Establish the conditions of IC-4, BOL cold shutdown, PZR bubble, RCS 195°F, 360 psig.
  • Place simulator in RUN.
  • Place Wide Range Iconics and RCS Heat up limitations on 1PM05J CRTs.
  • Turn on scaler timer and verify audible SR counts.
  • Place BOTH SVAG valve 480V bus feed C/S to CLOSE.
  • Turn over or remove energized SVAG valve placards.
  • Turn over or remove energized RH Loop Suction Valve placards.
  • Align 1B RH pump by performing the following at 1PM04J:
  • CLOSE 1RH607 by lowering demand to 0%.
  • Place 1RH619 in MANUAL and lower demand to 0%.
  • START 1B RH pump.
  • PLACE 1RH611 C/S to OPEN.
  • Complete items on Simulator Ready for Training Checklist.
  • Place simulator in RUN.
  • AT CONCLUSION OF JPM PERFORMANCE(S), PERFORM THE FOLLOWING:
  • VERIFY/RESTORE SVAG VALVE PLACARDS
  • VERIFY/RESTORE RH LOOP SUCTION VALVE PLACARDS COMMENTS:

SIM-400P Page 4 of 5

JOB PERFORMANCE MEASURE TASK CONDITIONS:

1. You are the Unit 1 Assist NSO.
2. Unit 1 is in Mode 5.
3. RH Train swap is in progress with both RH trains running.
4. RH letdown is aligned to 1A RH pump.
5. ALL SVAG valves are energized.

INITIATING CUES:

1. The Unit Supervisor directs you to secure the 1B RH pump and align the 1B RH pump for cold leg injection in accordance with BwOP RH-11, SECURING THE RH SYSTEM FROM SHUTDOWN COOLING.
2. BwOP RH-11 steps F.1 thru F.8 are complete.
3. Equipment operators are standing by in the field to assist you.
4. Another NSO will monitor the remainder of the Main Control Board panels and address alarms as necessary.
5. Inform the Unit Supervisor when the 1B RH pump is aligned for cold leg injection.

SIM-400P Page 5 of 5

TASK TITLE: Drain the Pressurizer Relief Tank JPM Number: SIM-501 Rev. 20070301 Task No.: R-RY-003 K/A No.: 007000A1.01 Objective No.: 4C.RY-03 K/A Imp.: 2.9/3.1 EXAMINEE: RO SRO (Circle One)

EVALUATOR: DATE:

The Examinee: PASSED this JPM. TIME STARTED:

FAILED TIME FINISHED:

JPM TIME: MINUTES Critical Elements: (*) 4, 5, 7, 8 Approx. Completion Time: 25 MINUTES Critical Time: N/A EVALUATION METHOD: LOCATION:

X PERFORM IN PLANT SIMULATE X SIMULATOR GENERAL

REFERENCES:

1. BwAR 1-12-A7, PRT LEVEL HIGH/LOW, Rev. 53.
2. BwOP RY-4, DRAINING THE PRESSURIZER RELIEF TANK, Rev. 9.

MATERIALS:

1. Copy of BwAR 1-12-A7, Rev. 53.
2. Copy of BwOP RY-4, Rev. 9.

TASK STANDARDS:

1. Lower PRT level to clear annunciator 1-2-A7.
2. Restores PRT pressure to > 0 psig, if reduced to < 0 psig.

TASK CONDITIONS:

1. You are the Unit 1 Assist NSO.
2. All systems are properly aligned for the current Unit 1 mode.

INITIATING CUES:

1. Annunciator 1-12-A7, PRT LEVEL HIGH/LOW, alarmed 5 minutes ago.
2. The Unit 1 Unit Supervisor directs you to lower PRT level to clear annunciator 1-12-A7 in accordance with BwOP RY-4, DRAINING THE PRESSURIZER RELIEF TANK.
3. Another NSO will monitor the remainder of the Main Control Board panels and address alarms as necessary.
4. Inform the Unit 1 Unit Supervisor when you have completed lowering PRT level.

SIM-501 Page 1 of 6

RECORD START TIME:

PERFORMANCE STEP STANDARD CIRCLE APPLICABLE

1. Refer to 1BwAR 1-12-A7: Refer to 1BwAR 1-12-A7: SAT UNSAT N/A CUE: When examinee locates Perform the following at Comments:

1BwAR 1-12-A7, provide 1PM05J:

copy.

  • Determine PRT level is CUE: As Unit Supervisor, high on 1LI-470, PRT acknowledge report of Level Indicator.

PRT level.

  • Check PZR PORVs and Safety Valves CLOSED:

o Check 1RY455A &

1RY456, PZR PORVs, CLOSED lights LIT and OPEN lights NOT LIT.

o Check 1RY8010A, B,

& C, PZR Safety Valves, CLOSED light LIT and OPEN lights NOT LIT.

o Check RCS pressure stable on 1PI-455A, 456, 457, & 458, PZR pressure indicators.

o Check PRT level &

pressure stable on 1LI-470 & 469, PRT Level & Pressure indicators.

o Check annunciator 1-12-B2, PZR PORV OR SAFETY VLV OPEN, NOT lit.

o Check annunciator 1-12-C6, PZR PORV DSCH TEMP HIGH, NOT lit.

o Check annunciator 1-12-C7, PZR SAF RLF DSCH TEMP HIGH, NOT lit.

CUE: As Unit Supervisor,

  • Inform Unit 1 Unit inform examinee another Supervisor PRT level is operator will check RCS high and PRT draining is leakage. required.
  • Check RCS leakage.

SIM-501 Page 2 of 6

PERFORMANCE STEP STANDARD CIRCLE APPLICABLE

2. Refer to BwOP RY-4: Locate and open BwOP RY-4: SAT UNSAT N/A CUE: When examinee locates Comments:

BwOP RY-4, provide copy.

CUE: All prerequisites, precautions, and Limitations and Actions have been met.

3. Verify open 1AOV-RY8033, Perform the following at SAT UNSAT N/A Nitrogen supply to PRT isolation 1PM05J: Comments:

valve.

  • Verify 1RY8033, N2 Supply to PRT Isolation Valve, OPEN light LIT.
  • 4. Verify/Open 1RE1003, RCDT Perform the following at SAT UNSAT N/A Pumps Discharge CNMT 1PM11J: Comments:

Isolation Valve.

  • Place 1RE1003, RCDT Pumps Inside Isolation Valve, C/S to OPEN.
  • 5. Open 1AOV-RY8031, PRT Drain Perform the following at SAT UNSAT N/A Isolation Valve. 1PM05J: Comments:
  • Place 1RY8031, PRT Drain Isolation Valve, C/S to OPEN.
6. Verify/Start 1RE01PA/B, RCDT Perform the following at SAT UNSAT N/A pump. 1PM05J: Comments:
  • Verify 1RE01PB, RCDT Pump 1B, RUN light LIT.

SIM-501 Page 3 of 6

PERFORMANCE STEP STANDARD CIRCLE APPLICABLE EVALUATOR NOTE: The following step is a conditional critical step. If PRT pressure drops to 0 psig, the examinee must stop the RCDT pumps and allow the PRT pressure to rise to approximately 3 psig prior to continuing the PRT drain. If PRT pressure does not drop to 0 psig, mark step N/A.

  • 7. Monitor PRT pressure: Perform the following at SAT UNSAT N/A 1PM05J: Comments:
  • If PRT pressure drops to 0 psig, perform the following at 1PM05J:
  • Place 1RE01PB, RCDT Pump 1B, C/S to STOP.
  • When PRT pressure is 3 psig, perform the following:
  • Place 1RE01PB, RCDT Pump 1B, C/S to AUTO.

level is reached. clear, perform the following at NOTE: When Annunciator 1 1PM05J:

A7, PRT LEVEL

  • Place 1RY8031, PRT Drain HIGH/LOW is clear, Isolation Valve, C/S to provide the following CLOSE.

cue:

CUE: The Unit 1 Unit Supervisor directs you to secure drain of the PRT.

9. Stop running RCDT pump. Perform the following at SAT UNSAT N/A 1PM05J: Comments:
  • Verify 1RE01PB, RCDT Pump 1B, STOP light LIT.

CUE: THIS COMPLETES THIS JPM.

RECORD STOP TIME:

COMMENTS:

SIM-501 Page 4 of 6

SIMULATOR SETUP INSTRUCTIONS

  • Verify/perform TQ-BR-201-0113, BRAIDWOOD TRAINING DEPARTMENT SIMULATOR EXAMINATION SECURITY ACTIONS CHECKLIST.
  • Establish the conditions of IC 21, 100% power, steady state, equilibrium xenon.

- OR -

  • Other IC if being performed concurrently with other JPMs. (JPM is not IC dependent)
  • Complete items on Simulator Ready for Training Checklist.
  • Place simulator in RUN.
  • Verify 1RE1003, RCDT Pumps Inside Isolation Valve, is CLOSED and in LOCAL on 1PM11J.
  • Verify 1RE01PA & 1RE01PB, RCDT Pumps 1A & 1B are in AUTO on 1PM05J.
  • Open 1RY469, PRT to GW Isolation Valve, to vent PRT while filling.
  • Open 1RY8030, PW to PRT Cnmt Isolation Valve, to fill PRT.
  • Fill PRT to 90%
  • Close 1RY469
  • Close 1RY8030 when PRT pressure is 3 psig.
  • If running the JPM repetitively, perform the following prior to each performance:
  • Verify 1RE1003, RCDT Pumps Inside Isolation Valve, is CLOSED and in LOCAL on 1PM11J.
  • Verify 1RE01PA & 1RE01PB, RCDT Pumps 1A & 1B are in AUTO on 1PM05J.
  • Open 1RY469, PRT to GW Isolation Valve, to vent PRT while filling.
  • Open 1RY8030, PW to PRT Cnmt Isolation Valve, to fill PRT.
  • Fill PRT to 90%
  • Close 1RY469
  • Close 1RY8030 when PRT pressure is 3 psig.
  • Check HMI terminals not displaying PRT parameters.

COMMENTS:

SIM-501 Page 5 of 6

JOB PERFORMANCE MEASURE TASK CONDITIONS:

1. You are the Unit 1 Assist NSO.
2. All systems are properly aligned for the current Unit 1 mode.

INITIATING CUES:

1. Annunciator 1-12-A7, PRT LEVEL HIGH/LOW, alarmed 5 minutes ago.
2. The Unit 1 Unit Supervisor directs you to lower PRT level to clear annunciator 1-12-A7 in accordance with BwOP RY-4, DRAINING THE PRESSURIZER RELIEF TANK.
3. Another NSO will monitor the remainder of the Main Control Board panels and address alarms as necessary.
4. Inform the Unit 1 Unit Supervisor when you have completed lowering PRT level.

SIM-501 Page 6 of 6

TASK TITLE: Perform Low Power Electrical Lineup JPM Number: SIM-610 Rev. 20070301 Task No: R-AP-011 K/A No.: 062000A4.07 Objective No: 4C.AP-08 K/A Imp.: 3.1/3.1 EXAMINEE: RO SRO (Circle One)

EVALUATOR: DATE:

The Examinee: PASSED this JPM. TIME STARTED:

FAILED TIME FINISHED:

JPM TIME: MINUTES Critical Elements: (*) 2, 3, 4, 5 Approx. Completion Time: 20 MINUTES Critical Time: N/A EVALUATION METHOD: LOCATION:

X PERFORM IN PLANT SIMULATE X SIMULATOR GENERAL

REFERENCES:

1. 1BwGP 100-4, POWER DESCENSION, Rev. 27.

MATERIALS:

1. None TASK STANDARDS:
1. Energize the respective non-ESF Buses from the SAT prior to opening the respective buses UAT feed breaker.

TASK CONDITIONS:

1. You are the Unit 1 Assist NSO.
2. All conditions are normal for the current power level on Unit 1.
3. Unit 1 is preparing for a rapid power reduction in accordance with 1BwGP 100-4, POWER DESCENSION and 1BwGP 100-4T3, RAPID POWER REDUCTION FLOWCHART.

INITIATING CUES:

1. The Unit 1 Unit Supervisor directs you establish a shutdown electrical lineup in accordance with 1BwGP 100-4, step F.11.
2. Another NSO will monitor the remainder of the Main Control Board panels and address alarms as necessary.
3. Inform the Unit 1 Unit Supervisor when you have established a shutdown electrical lineup.

SIM-610 Page 1 of 5

RECORD START TIME:

PERFORMANCE STEP STANDARD CIRCLE APPLICABLE

1. Refer to 1BwGP 100-4, step F.11 Locate and open 1BwGP 100- SAT UNSAT N/A CUE: All prerequisites, 4. Comments:

precautions, and limitations and actions have been met.

EVALUATOR NOTE: JPM steps 2-5 are independent of one another and can be performed in any order. The individual JPM steps must be performed in the order specified.

  • 2. Establish Bus 143 shutdown Perform the following at SAT UNSAT N/A electrical lineup. 1PM01J: Comments:
  • Place SAT 142-1 Feed to Bus 143 Synch C/S to ON.
  • Verify 1SI-AP104, Synchroscope Division 11, indicates approximately 12 oclock position.
  • Place ACB1432, SAT 142-1 Feed to 4KV Bus 143, C/S to CLOSE.

o Verify ACB 1432 CLOSED light LIT.

  • Place ACB1431, UAT Feed to 4KV Bus 143, C/S to TRIP.
  • Place SAT 142-1 Feed to Bus 143 Synch C/S to OFF.
  • 3. Establish Bus 144 shutdown Perform the following at SAT UNSAT N/A electrical lineup. 1PM01J: Comments:
  • Place SAT 142-2 Feed to Bus 144 Synch C/S to ON.
  • Verify 1SI-AP107, Synchroscope Division 12, indicates approximately 12 oclock position.
  • Place ACB1442, SAT 142-2 Feed to 4KV Bus 144, C/S to CLOSE.

o Verify ACB 1442 CLOSED light LIT.

  • Place ACB1441, UAT Feed to 4KV Bus 144, C/S to TRIP.
  • Place SAT 142-2 Feed to Bus 144 Synch C/S to OFF.

SIM-610 Page 2 of 5

PERFORMANCE STEP STANDARD CIRCLE APPLICABLE

  • 4. Establish Bus 157 shutdown Perform the following at SAT UNSAT N/A electrical lineup. 1PM01J: Comments:
  • Place SAT 142-1 Feed to Bus 157 Synch C/S to ON.
  • Verify 1SI-AP037, Synchroscope Switchyart/6.9 KV Buses, indicates approximately 12 oclock position.
  • Place ACB 1572, SAT 142-1 Feed to 6.9 KV Bus 157, C/S to CLOSE.

o Verify ACB 1572 CLOSED light LIT.

  • Place ACB1571, UAT Feed to 4KV Bus 157, C/S to TRIP.
  • Place SAT 142-1 Feed to Bus 157 Synch C/S to OFF.
  • 5. Establish Bus 156 shutdown Perform the following at SAT UNSAT N/A electrical lineup. 1PM01J: Comments:
  • Place SAT 142-2 Feed to Bus 156 Synch C/S to ON.
  • Verify 1SI-AP037, Synchroscope Switchyart/6.9 KV Buses, indicates approximately 12 oclock position.
  • Place ACB 1562, SAT 142-2 Feed to 6.9 KV Bus 156, C/S to CLOSE.

o Verify ACB 1562 CLOSED light LIT.

  • Place ACB1561, UAT Feed to 4KV Bus 156, C/S to TRIP.
  • Place SAT 142-2 Feed to Bus 156 Synch C/S to OFF.

CUE: THIS COMPLETES THIS JPM.

RECORD STOP TIME:

COMMENTS:

SIM-610 Page 3 of 5

SIMULATOR SETUP INSTRUCTIONS

  • Verify/perform TQ-BR-201-0113, BRAIDWOOD TRAINING DEPARTMENT SIMULATOR EXAMINATION SECURITY ACTIONS CHECKLIST.
  • Establish the conditions of IC 21, 100% power, steady state, equilibrium xenon.

- OR -

  • Other at power IC if being performed concurrently with other JPMs. (JPM must be performed with main generator synched to grid)
  • Complete items on Simulator Ready for Training Checklist.
  • Place simulator in RUN.
  • Verify UATs are supplying 6.9KV buses and 4KV non-ESF buses.
  • If running the JPM repetitively, perform the following prior to each performance:
  • Align 6.9 KV buses and 4KV non-ESF buses to the UATs.
  • Ensure bus synch switches are OFF.
  • Verify/remove place keeping marks from 1BwGP 100-4.

COMMENTS:

SIM-610 Page 4 of 5

JOB PERFORMANCE MEASURE TASK CONDITIONS:

1. You are the Unit 1 Assist NSO.
2. All conditions are normal for the current power level on Unit 1.
3. Unit 1 is preparing for a rapid power reduction in accordance with 1BwGP 100-4, POWER DESCENSION and 1BwGP 100-4T3, RAPID POWER REDUCTION FLOWCHART.

INITIATING CUES:

1. The Unit 1 Unit Supervisor directs you establish a shutdown electrical lineup in accordance with 1BwGP 100-4, step F.11.
2. Another NSO will monitor the remainder of the Main Control Board panels and address alarms as necessary.
3. Inform the Unit 1 Unit Supervisor when you have established a shutdown electrical lineup.

SIM-610 Page 5 of 5

TASK TITLE: Swap Component Cooling Pumps with Failure of 1B CC Pump.

JPM No.: SIM-800 REV: 20070301 Task No: R-CC-02 K/A No.: 008000A4.01 TASK No.: 4C.CC-05 K/A IMP: 3.3/3.1 EXAMINEE: RO SRO (Circle One)

EVALUATOR: DATE:

The Examinee: PASSED this JPM. TIME STARTED:

FAILED TIME FINISHED:

JPM TIME: MINUTES CRITICAL ELEMENTS: (*) 3, 4, 5, 10 APPROX COMPLETION TIME: 20 MINUTES CRITICAL TIME: NA EVALUATION METHOD: LOCATION:

PERFORM X IN PLANT X SIMULATE SIMULATOR GENERAL

REFERENCES:

1. BwOP CC-15, SWITCHING OPERATING AND STANDBY COMPONENT COOLING SYSTEM PUMPS, Rev. 16.
2. BwOP CC-2, COMPONENT COOLING WATER SYSTEM SHUTDOWN, Rev. 11.

MATERIALS:

1. Copy of BwOP CC-15, Rev. 16.
2. Copy of BwOP CC-2, Rev. 11.

TASK STANDARDS:

1. Perform Component Cooling Water Pump Swap.
2. Determine 1B CC pumps amps have not lowered after the pump was started.
3. Secure 1B CC pump.
4. Verify at least one CC pump operating.
5. SRO ONLY - Determine Tech Spec required actions for 1B CC pump malfunction TASK CONDITIONS:
1. You are the Unit 1 Assist NSO.
2. All systems are properly aligned for the current Unit 1 mode.
3. The 0 CC pump is mechanically aligned to Unit 1 in accordance with BwOP CC-10, ALIGNMENT OF THE 0 CC PUMP TO A UNIT.

INITIATING CUES:

1. The Unit 1 Unit Supervisor has directed you to start the 1B CC Pump and secure the 1A CC Pump in accordance with BwOP CC-15, SWITCHING OPERATING AND STANDBY COMPONENT COOLING SYSTEM PUMPS.

CUE: Hand examinee copy of BwOP CC-15.

2. The 1B CC pump casing has been vented.
3. Non-licensed operators are standing by in the field to assist you.
4. Another NSO will monitor the remainder of the Main Control Board panels and address alarms as necessary.
5. Inform the Unit 1 US when the CC pump swap is complete.

SIM-800 Page 1 of 7

RECORD START TIME:

PERFORMANCE STEP STANDARD CIRCLE APPLICABLE

1. Refer to BwOP CC-15. Refer to BwOP CC-15. SAT UNSAT N/A CUE: All prerequisites, Comments:

precautions, and limitations and actions are met.

2. Vent the 1B CC pump casing: Vent the 1B CC pump casing: SAT UNSAT N/A NOTE: If examinee asks if 1B
  • Determine 1B CC pump Comments:

CC pump is being run casing was vented (from for ASME surveillance, initiating cue) provide the following cue:

CUE: 1B CC pump is NOT being run for ASME surveillance.

EVALUATOR NOTE: Alternate path begins here.

  • 3. Start 1B Component Cooling Perform the following at SAT UNSAT N/A Pump. 1PM06J:

Comments:

CUE: As Unit 2, acknowledge o Make page report of 1B CC pump announcement for pump start. (due to impact on start 2A safety loop with 0 CC HX aligned to Unit 1).

  • Place 1CC01PB, 1B CC CUE: If examinee reports Pump, C/S to START.

pump amps, provide acknowledgement but do not provide direction.

NOTE: If examinee asks for pump preference provide the following cue:

CUE: The Unit 1 Unit Supervisor directs you to determine pump alignment.

SIM-800 Page 2 of 7

PERFORMANCE STEP STANDARD CIRCLE APPLICABLE EVALUATOR NOTE: In order to meet JPM critical step 4, the examinee must have the 1A CC pump or 0 CC pump running.

During the performance of JPM steps 4 and 5, the examinee may take the following courses of action, depending on when the examinee stops the 1A CC pump and when examinee recognizes the 1B CC pump amps are not lowering:

1. The examinee may stop the 1B CC pump prior to securing the 1A CC pump. If the examinee stops the 1B CC pump prior to securing the 1A CC pump, JPM step 4 task is met.
2. If the 1A CC pump is secured when the examinee recognizes 1B CC pump amps are not lowering, the examinee may manually start the 1A CC pump or 0 CC pump prior to securing the 1B CC pump OR the examinee may elect to immediately secure the 1B CC pump. If the examinee elects to immediately secure the 1B CC pump, the examinee must manually start the 1A CC pump or 0 CC pump, as the auto start function is defeated.
  • 4. Start 1A OR 0 Component Perform the following at SAT UNSAT N/A Cooling Pump. 1PM06J:

Comments:

CUE: Unit Supervisor directs

  • Place 1CC01PA, 1A CC you to start the 1A CC Pump, C/S to START.

pump. (if 1A CC pump previously secured) OR

  • Place 0CC01P, 0 CC Pump, C/S to START.
  • 5. Stop the 1B CC pump. Perform the following at SAT UNSAT N/A 1PM06J:

Comments:

  • Determines that 1B CC pump motor current has NOT lowered to less than 56 amps within 5 CUE: As Unit Supervisor, seconds.

acknowledge report of o Informs Unit Sup of abnormal amps on 1B problem with 1B CC CC pump. pump.

  • Place 1CC01PB, 1B CC Pump, C/S to TRIP until system pressure stabilizes.

o Place C/S for 1B CC pump in PTL

  • If examinee continues on without noticing 1B CC pump amps the JPM is complete.

SIM-800 Page 3 of 7

PERFORMANCE STEP STANDARD CIRCLE APPLICABLE

7. Verify/Open _1CC685, CC from Perform the following at SAT UNSAT N/A RCP Thermal Barrier HX Isolation 1PM06J:

Valve. Comments:

  • Verify 1CC685, CC From RC Pumps Thermal Barrier Isolation Valve, OPEN light is LIT.
8. Verify/Clear any RCP CC Perform the following at SAT UNSAT N/A annunciators/alarms. 1PM05J:

Comments:

9. Verify/Clear CNMT PEN CLG Perform the following at SAT UNSAT N/A FLOW HIGH/LOW alarm. 1PM06J:

Comments:

SIM-800 Page 4 of 7

PERFORMANCE STEP STANDARD CIRCLE APPLICABLE EVALUATOR NOTE: The following step is only required to be performed by SRO candidates. Mark step N/A if exam is being administered to RO candidate.

  • 10. Review system lineup and C/S Perform ONE of the following: SAT UNSAT N/A position for CC system Tech
  • If the 1B CC pump C/S is Spec compliance. Comments:

in PULL OUT, determine NOTE: If examinee does not Unit 1 does NOT currently refer to Tech Specs, meet Tech Spec entry provide the following conditions associated with cue: the Component Cooling CUE: US directs you to System.

review Tech Specs for o Examinee may state applicability with that Unit 1 was briefly current system in TS 3.7.7. condition A alignment. for the 1B CC pump.

  • If the 1B CC pump C/S is in NORMAL AFTER TRIP, determine Tech Spec 3.7.7 condition B applies for the 1B CC pump.

o Informs Unit Supervisor of Tech CUE: As Unit Supervisor, Spec entry conditions.

acknowledge report of Tech Spec entry o Notify Unit Supervisor conditions and Tech Spec entry conditions applicability. and applicability.

CUE: THIS COMPLETES THIS JPM.

RECORD STOPT TIME:

COMMENTS:

SIM-800 Page 5 of 7

SIMULATOR SETUP INSTRUCTIONS

  • Verify/perform TQ-BR-201-0113, BRAIDWOOD TRAINING DEPARTMENT SIMULATOR EXAMINATION SECURITY ACTIONS CHECKLIST.
  • Establish the conditions of IC 21, 100% power, steady state, equilibrium xenon.

- OR -

  • Other IC if being performed concurrently with other JPMs. (JPM is not IC dependent)
  • Complete items on Simulator Ready for Training Checklist.
  • Place simulator in RUN.
  • Verify 1A CC pump running.
  • Verify 1B CC pump and 0 CC pump in normal after trip.
  • Place 0 CC Pump C/S for 141 in Pull Out.
  • Place 0 CC Pump C/S for 142 in NAT.
  • Run caep SIM-800 from disk and verify the following actuate:
  • IRF CC42 RO
  • IRF CC07 RI
  • TRGSET 1 "ZDI1CC01PB(4)==1"
  • TRG 1 "IOR ZAO1IICC01B (1 2) 80 2"
  • TRGSET 2 "ZDI1CC01PB(1)==1"
  • TRG 2 "IOR ZAO1IICC01B 0"
  • If running the JPM repetitively, perform the following:
  • Verify 1A CC pump running.
  • Verify 1B CC pump and 0 CC pump in normal after trip.
  • Reset trigger 1
  • Reset trigger 2.

COMMENTS:

  • Provide copy of BwOP CC-15 SIM-800 Page 6 of 7

JOB PERFORMANCE MEASURE TASK CONDITIONS:

1. You are the Unit 1 Assist NSO.
2. All systems are properly aligned for the current Unit 1 mode.
3. The 0 CC pump is mechanically aligned to Unit 1 in accordance with BwOP CC-10, ALIGNMENT OF THE 0 CC PUMP TO A UNIT.

INITIATING CUES:

1. The Unit 1 Unit Supervisor has directed you to start the 1B CC Pump and secure the 1A CC Pump in accordance with BwOP CC-15, SWITCHING OPERATING AND STANDBY COMPONENT COOLING SYSTEM PUMPS.
2. The 1B CC pump casing has been vented.
3. Non-licensed operators are standing by in the field to assist you.
4. Another NSO will monitor the remainder of the Main Control Board panels and address alarms as necessary.
5. Inform the Unit 1 US when the CC pump swap is complete.

SIM-800 Page 7 of 7

TASK TITLE: Perform Waste Gas Release Channel Checks JPM No.: SIM-901 REV: 70070301 Task No.: R-GW-001 K/A No.: 071000A4.25 Objective No.: 4C.GW-01 K/A IMP: 3.2/3.2 EXAMINEE: RO SRO (Circle One)

EVALUATOR: DATE:

The Examinee: PASSED this JPM. TIME STARTED:

FAILED TIME FINISHED:

JPM TIME: MINUTES CRITICAL ELEMENTS: (*) 5, 9 APPROX COMPLETION TIME: 30 MINUTES CRITICAL TIME: NA EVALUATION METHOD: LOCATION:

X PERFORM IN PLANT SIMULATE X SIMULATOR GENERAL

REFERENCES:

1. BwOP GW-500T1, GAS DECAY TANK RELEASE FORM, Rev. 32, Gas Decay Tank Release Form MATERIALS:
1. Copy of BwOP GW-500T1, Rev. 32, completed through step 17.

TASK STANDARDS:

1. Perform Gas Decay Tank pre-release channel checks in accordance with BwOP GW-500T1.
2. Adjust RM-11 setpoints to verify proper operation of waste gas discharge valve.
3. Adjust RM-11 setpoints for gas release.

TASK CONDITIONS:

1. You are an extra NSO.
2. 0PR02J, Gas Decay Tank Monitor, is operable.
3. A release package is in progress for the 0F Gas Decay Tank.
4. BwOP GW-500T1, GAS DECAY TANK RELEASE FORM, has been completed through step D.17 for the 0F Gas Decay Tank release.

INITIATING CUES:

1. The Unit 1 Unit Supervisor has directed you to perform steps D.18 through D.21 of BwOP GW-500T1.

CUE: Hand examinee copy of partially completed BwOP GW-500T1.

2. Another NSO will monitor the remainder of the Main Control Board panels and address alarms as necessary.
3. Inform the Unit 1 Unit Supervisor when you have completed steps D.18 through D.21 of BwOP GW-500T1.

SIM-901 Page 1 of 8

RECORD START TIME:

PERFORMANCE STEP STANDARD CIRCLE APPLICABLE

1. Refer to BwOP GW-500T1: Refer to BwOP GW-500T1 SAT UNSAT N/A Comments:
2. Select the High Alarm setpoint for Perform the following at the SAT UNSAT N/A 0PA202. (steps D.18 - 19.a) RM-11 console: Comments:
  • Place the RM-11 console key to SUPERVISOR.

o Depress GRID 3 key.

  • Key in 0202.
  • Depress the SEL key.

o Verify 0PA202 selected.

  • Depress CHAN ITEM key.
  • Key in 9.
  • Depress the SEL key.

EVALUATOR NOTE: The following procedure step is not required to be performed if 0PA202 is NOT in HIGH ALARM.

3. Verify/enter High Alarm setpoint Perform the following at the SAT UNSAT N/A for 0PA202 suggested by Health RM-11 console: Comments:

Physics is section C.3.c. (step o Refer to step C.3.c.

D.19.b) o Verify the new High Alarm NOTE: If examinee requests setpoint from step C.3.c independent verification (6.06E-03).

of steps, provide the following cue: o Depress the ENTER key.

CUE: Verification has been o Verify the new HIGH alarm provided. setpoint is displayed.

o Obtain verification.

4. Select and enter the Alert Alarm Perform the following at the SAT UNSAT N/A setpoint for 0PA202. (step D.19.c) RM-11 console: Comments:

o Depress Grid 3 key.

o Key in 0202.

o Depress the SEL key.

o Verify 0PA202 selected.

o Depress CHAN ITEM key.

  • Key in 10.
  • Depress the SEL key.

o Refer to step C.3.c.

o Verify the new Alert Alarm NOTE: If examinee requests setpoint 3.03E-03.

independent verification o Depress the ENTER key.

of steps, provide the

  • Verify the new ALERT following cue: alarm setpoint is displayed.

CUE: Verification has been o Obtain verification.

provided.

SIM-901 Page 2 of 8

PERFORMANCE STEP STANDARD CIRCLE APPLICABLE

  • 5. Verify 0RE-PR002B will cause Contact the local operator to: SAT UNSAT N/A 0GW014 to automatically close.
  • Verify/Place 0GW014 C/S Comments:

(steps D.19.d-q) in OPEN.

CUE: As local operator report

  • Place 0GW014 controller 0GW014 C/S is in open to 100% open.

CUE: As local operator report Perform the following at the 0GW014 controller is at RM-11 console:

100%. o Depress Grid 3 key.

o Key in 0202.

o Depress the SEL key.

o Verify 0PA202 selected.

o Depress CHAN ITEM key.

0PA202 current activity setting: o Key in 9.

o Record the current activity reading.

0PA202 new Hi Alarm setting:

  • Enter a new HIGH ALARM

__________________ setpoint below the current activity value.

o Record the new HIGH ALARM setpoint that was entered.

  • Depress the ENTER key.

CUE: As local operator report 0GW014 Auto Closed o Acknowledge the alarm at the RM-11 console.

CUE: As local operator report 0GW014 control switch o Contact the local operator is in closed to:

CUE: As local operator report o Verify 0GW014 AUTO 0GW014 controller is at CLOSED.

0%. o Place 0GW014 control switch in CLOSED.

o Place 0GW014 controller at 0%

demand.

o Depress Grid 3 key.

o Key in 0202.

o Depress the SEL key.

o Verify 0PA202 selected.

o Depress CHAN ITEM key.

NOTE: If examinee requests o Key in 9.

independent verification of steps, provide the

  • Enter the HIGH ALARM following cue: setpoint determined in step C.3.c (6.06 E-03).

CUE: Verification has been provided. o Obtain verification.

SIM-901 Page 3 of 8

PERFORMANCE STEP STANDARD CIRCLE APPLICABLE

6. Select the High Alarm setpoint for Perform the following at the SAT UNSAT N/A 0PB102. (step D.20.a) RM-11 console: Comments:

o Depress Grid 3 key.

  • Key in 0102.
  • Depress the SEL key.

o Verify 0PB102 selected.

  • Depress CHAN ITEM key.
  • Key in 9.
  • Depress the SEL key.

EVALUATOR NOTE: The following procedure step is not required to be performed if 0PA202 is NOT in HIGH ALARM, otherwise mark step N/A.

7. Verify/enter High Alarm setpoint Perform the following at the SAT UNSAT N/A for 0PB102 suggested by Health RM-11 console: Comments:

Physics is section C.3.c. (step o Refer to step C.3.c.

D.20.b) o Verify the new High Alarm setpoint from step C.3.c NOTE: If examinee requests (6.06E-04).

independent verification o Depress the ENTER key.

of steps, provide the following cue: o Verify the new HIGH alarm setpoint is displayed.

CUE: Verification has been provided. o Obtain verification.

8. Select and enter the Alert Alarm Perform the following at the SAT UNSAT N/A setpoint for 0PB102. RM-11 console: Comments:

(step D.20.c) o Depress Grid 3 key.

o Key in 0102.

o Depress the SEL key.

o Verify 0PB102 selected.

o Depress CHAN ITEM key

  • Key in 10.
  • Depress the SEL key.

o Refer to step C.3.c.

NOTE: If examinee requests

  • Verify the new Alert Alarm independent verification setpoint (6.06E-05).

of steps, provide the o Depress the ENTER key.

following cue:

o Verify the new ALERT CUE: Verification has been alarm setpoint is displayed.

provided.

o Obtain verification.

SIM-901 Page 4 of 8

PERFORMANCE STEP STANDARD CIRCLE APPLICABLE

  • 9. Verify 0RE-PR002A will cause Contact the local operator to: SAT UNSAT N/A 0GW014 to automatically close:
  • Verify/Place 0GW014 C/S Comments:

(steps D.20.d-q) in OPEN.

CUE: As local operator report

  • Place 0GW014 controller 0GW014 C/S is in open to 100% open.

CUE: As local operator report Perform the following at the 0GW014 controller is at RM-11 console:

100%. o Depress Grid 3 key.

o Key in 0102.

o Depress the SEL key.

o Verify 0PB102 selected.

o Depress CHAN ITEM key.

0PB102 current activity

  • Key in 9.

setting________

o Record the current activity reading.

0PB102 new Hi Alarm

  • Enter a new HIGH ALARM setting_________ setpoint below the current activity value.

o Record the new HIGH ALARM setpoint that was entered.

  • Depress the ENTER key.

CUE: As local operator report 0GW014 Auto Closed o Acknowledge the alarm at the RM-11 console.

CUE: As local operator report 0GW014 control switch o Contact the local operator is in closed to:

CUE: As local operator report o Verify 0GW014 AUTO 0GW014 controller is at CLOSED.

0%. o Place 0GW014 control switch in CLOSED.

o Place 0GW014 controller at 0%

demand.

o Depress Grid 3 key.

o Key in 0102.

o Depress the SEL key.

o Verify 0PB102 selected.

NOTE: If examinee requests o Depress CHAN ITEM key.

independent verification of steps, provide the o Key in 9.

following cue:

  • Enter the HIGH ALARM CUE: Verification has been setpoint determined in step provided. C.3.c (6.06 E-04).

o Obtain verification.

SIM-901 Page 5 of 8

PERFORMANCE STEP STANDARD CIRCLE APPLICABLE

10. Place RM-11 in NORMAL MODE: Perform the following at the SAT UNSAT N/A (step D.21) RM-11 console: Comments:
  • Place the RM-11 console key to NORMAL.
11. Inform US pre-release channel Inform Unit Supervisor BwOP checks complete GW-500T1 steps D.18 through CUE: As Unit Supervisor, D.21 are completed.

acknowledge report.

CUE: THIS COMPLETES THIS JPM.

RECORD STOP TIME:

COMMENTS:

SIM-901 Page 6 of 8

SIMULATOR SETUP INSTRUCTIONS

  • Verify/perform TQ-BR-201-0113, BRAIDWOOD TRAINING DEPARTMENT SIMULATOR EXAMINATION SECURITY ACTIONS CHECKLIST.
  • Establish the conditions of IC 21, 100% power, steady state, equilibrium xenon.

- OR -

  • Other IC if being performed concurrently with other JPMs. (JPM is not IC dependent)
  • Complete items on Simulator Ready for Training Checklist.
  • Place simulator in RUN.
  • Adjust 0PR02J radiation level as follows:
  • Record as found values of monitored item RMK0PR02ABKD ______________.
  • Set monitor item RMK0PR02ABKD = 1.31 E-8
  • Record as found values of monitored item RMK0PR02BBKD ______________.
  • Set monitor item RMK0PR02BBKD = 1.31 E-8
  • Adjust 0PR02J setpoints as follows.
  • Record 0PB102 High Alarm current setpoint ___________________.
  • Set 0PB102 High Alarm Setpoint = 6.06 E-04 (channel item #9).
  • Record 0PB102 Alert Alarm current setpoint ___________________.
  • Set 0PB102 Alert Alarm Setpoint = 6.06 E-05 (channel item #10).
  • Record 0PA202 High Alarm current setpoint ___________________.
  • Set 0PA202 High Alarm Setpoint = 6.06 E-03 (channel item #9).
  • Record 0PA202 Alert Alarm current setpoint ___________________.
  • Set 0PA202 Alert Alarm Setpoint = 3.03 E-03 (channel item #10).
  • Select grid 1 on the RM-11 console.
  • Place RM-11 keys switch to NORMAL.
  • If running the JPM repetitively, perform the following:
  • Verify/Set 0PB102 High Alarm Setpoint = 6.06 E-04 (channel item #9).
  • Verify/Set 0PB102 Alert Alarm Setpoint = 6.06 E-05 (channel item #10).
  • Verify/Set 0PA202 High Alarm Setpoint = 6.06 E-03 (channel item #9).
  • Verify/Set 0PA202 Alert Alarm Setpoint = 3.03 E-03 (channel item #10).
  • Verify/Select grid 1 on the RM-11 console.
  • Verify/Place RM-11 keys switch to NORMAL.
  • AT CONCLUSION OF JPM(S), RESTORE 0PR02J MONITORED ITEMS ALARM SETPOINTS TO ORIGINAL AS FOUND VALUES COMMENTS:

SIM-901 Page 7 of 8

JOB PERFORMANCE MEASURE TASK CONDITIONS:

1. You are an extra NSO.
2. 0PR02J, Gas Decay Tank Monitor, is operable.
3. A release package is in progress for the 0F Gas Decay Tank.
4. BwOP GW-500T1, GAS DECAY TANK RELEASE FORM, has been completed through step D.17 for the 0F Gas Decay Tank release.

INITIATING CUES:

1. The Unit 1 Unit Supervisor has directed you to perform steps D.18 through D.21 of BwOP GW-500T1.
2. Another NSO will monitor the remainder of the Main Control Board panels and address alarms as necessary.
3. Inform the Unit 1 Unit Supervisor when you have completed steps D.18 through D.21 of BwOP GW-500T1.

SIM-901 Page 8 of 8

TASK TITLE: Align Ventilation Systems for Emergency Operations JPM No.: SIM-222 REV: 20070301 Task No: R-EF-013 K/A No 013000A4.01 Objective No.: 4C.EF-13 K/A Imp: 4.5/4.8 EXAMINEE: RO SRO (Circle One)

EVALUATOR: DATE:

The Examinee: PASSED this JPM. TIME STARTED:

FAILED TIME FINISHED:

JPM TIME: MINUTES CRITICAL ELEMENTS: (*) 3, 4, 6, 8 APPROX COMPLETION TIME: 25 MINUTES CRITICAL TIME: NA EVALUATION METHOD: LOCATION:

X PERFORM IN PLANT SIMULATE X SIMULATOR GENERAL

REFERENCES:

1. 1BwEP-0, Reactor Trip or Safety Injection, Rev. 104 WOG 1C.
2. BwOP VA-5, Aux Building Charcoal Booster Fan Operation, Rev. 18.
3. BwOP VA-6, Fuel Handling Building Charcoal Booster Fan Operation, Rev 16.

MATERIALS:

1. BwOP VA-5, Aux Building Charcoal Booster Fan Operation, Rev. 18.
2. BwOP VA-6, Fuel Handling Building Charcoal Booster Fan Operation, Rev 16.

TASK STANDARDS:

1. Determine HVAC components have failed to actuate.
2. Manually start one MCR Makeup Filter Fan.
3. Manually align one MCR Charcoal Absorber.
4. Manually start two Aux Building Charcoal Booster Fans in two separate plenums.
5. Manually start one FHB Charcoal Booster Fan.

TASK CONDITIONS:

1. You are the Unit 1 Assist NSO.
2. Unit 1 has experienced an RCS LOCA
3. 1BwEP-0, REACTOR TRIP OR SAFETY INJECTION, is in progress.

INITIATING CUES:

1. The Unit 1 Unit Supervisor has directed you to perform steps 21, 22, and 23 of 1BwEP-0.
2. Another NSO will monitor the remainder of the Main Control Board panels and address alarms as necessary.
3. Inform the Unit 1 Unit Supervisor when you have completed steps 21, 22, and 23 of 1BwEP-0.

SIM-222 Page 1 of 10

RECORD START TIME:

PERFORMANCE STEP STANDARD CIRCLE APPLICABLE

1. Refer to 1BwEP-0. REACTOR Locate and open 1BwEP-0: SAT UNSAT N/A TRIP OR SAFETY INJECTION. Comments:
2. Verify Control Room outside air Perform the following at the SAT UNSAT N/A intake monitors are less than high RM-11 console: Comments:

alarm setpoint. o Depress Grid 2 button.

  • Verify 0PR31J & 0PR32J cursors are GREEN.
  • Verify 0PR33J & 0PR34J cursors are GREEN.

EVALUATOR NOTE: Alternate path begins here.

  • 3. Check operating VC train Perform the following at SAT UNSAT N/A equipment alignment. 0PM02J: Comments:
  • Determine 0B VC train is running.

o Verify 0VC01CB, MCR Supply Fan 0B, RUN light LIT.

o Verify 0VC02CB, MCR Return Fan 0B, RUN light LIT.

  • Determine 0VC03CB did not automatically start.
  • Place 0VC03CB control switch to START.

o Determine 0VC03CB RUN light LIT.

o Verify 0WO01PB, MCR Chilled Water Pump 0B, RUN light LIT.

o Verify 0WO01CB, MCR Chiller 0B, RUN light LIT.

SIM-222 Page 2 of 10

PERFORMANCE STEP STANDARD CIRCLE APPLICABLE

  • 4. Verify 0B VC Train Damper Perform the following at SAT UNSAT N/A Alignment 1PM06J: Comments:

o Verify 0VC08Y, M/U Air Filter 0B Outlet Damper 0B, OPEN and CLOSED lights LIT.

o Verify 0VC16Y/282Y/09Y/313Y, M/U Air Source Normal/M/U Air Filter, FILTER light LIT.

o Verify 0VC09Y, Turbine Building Air to M/U Filter Isolation Damper, OPEN light LIT.

o Verify 0VC313Y, Outside Air to M/U Filter Isolation Damper, CLOSED light LIT.

  • Determine Recirc Charcoal Absorber is not aligned.
  • Place Recirc Charcoal Absorber Select Switch 0VC44Y/05Y/06Y to ABSORB.

o Verify 0VC44Y, Recirc Charcoal Absorber Bypass Damper, CLOSED light LIT.

o Verify 0VC05Y, Recirc Charcoal Absorber Inlet Damper, OPEN light LIT.

o Verify 0VC06Y, Recirc Charcoal Absorber Outlet Damper, OPEN light LIT.

o Verify MCR pressure >

+0.125 H2O on 0PDI-VC038.

SIM-222 Page 3 of 10

PERFORMANCE STEP STANDARD CIRCLE APPLICABLE

5. Verify Aux Building Ventilation Perform the following at SAT UNSAT N/A Aligned for Emergency Operation. 0PM02J: Comments:
  • Determines NO Inaccessible Plenum Charcoal Booster Fans operating.

EVALUATOR NOTE: The examinee may elect to immediately start the Aux Building Charcoal Booster Fans rather than starting the fans per BwOP VA-5. OP-AA-101-111, ROLES AND RESPONSIBILITIES OF ON SHIFT PERSONNEL, step 4.6.2.5, directs Reactor Operators to manually initiate safety systems automatic actions when operating parameters exceed the systems automatic initiation setpoints and the initiation does not occur.

If the examinee elects to immediately start the Aux Building Charcoal Booster Fans, refer to JPM step 6 actions listed on this page.

If the examinee elects to start the Aux Building Charcoal Booster Fans per BwOP VA-5, refer to JPM step 6 actions listed on JPM pages 6 - 7.

  • 6. Start Aux Building Charcoal Perform the following at SAT UNSAT N/A Booster Fans (1BwEP-0 step 22 0PM02J: Comments:

Action Expected Response

  • Start ONE fan in plenum A column) as follows:
  • Place 0VA03CA C/S to start:
  • Verify 0VA022Y OPEN
  • Verify 0VA020Y CLOSED

- OR -

  • Place 0VA03CB C/S to start:
  • Verify 0VA023Y OPEN
  • Verify 0VA436Y CLOSED
  • Start ONE fan in plenum C as follows:
  • Place 0VA03CE C/S to start:
  • Verify 0VA067Y OPEN
  • Verify 0VA052Y CLOSED

- OR -

  • Place 0VA03CF C/S to start:
  • Verify 0VA072Y OPEN
  • Verify 0VA438Y CLOSED SIM-222 Page 4 of 10

PERFORMANCE STEP STANDARD CIRCLE APPLICABLE

  • 6. Start Aux Building Charcoal Locate and open BwOP VA-5. SAT UNSAT N/A Booster Fans. (BwOP VA-5) Refer to BwOP VA-5. Comments:

Perform the following at 0PM02J:

  • Verify NO Inaccessible Plenum Charcoal Booster Fans operating.
  • Verify two inaccessible plenums aligned:
  • 0VA084Y OPEN.

o 0VA085Y CLOSED CUE: After examinee locates

  • 0VA086Y OPEN.

procedure, provide copy.

  • Verify fan control dampers CUE: All prerequisites, CLOSED.

precautions, and limitations and actions

  • 0VA023Y (if starting are met. 0VA03CA)
  • 0VA022Y (if starting 0VA03CB)
  • 0VA072Y (if starting 0VA03CE)
  • 0VA067Y (if starting 0VA03CF)
  • Start ONE fan in plenum A as follows:

CUE: 0VA03CA transfer switch is in remote. o Verify 0VA03CA transfer switch in remote

  • Place 0VA03CA C/S to start:
  • Verify 0VA022Y OPEN OR THROTTLED
  • Verify 0VA020Y CLOSED CUE: 0VA03CB transfer switch - OR -

is in remote.

o Verify 0VA03CB transfer switch in remote

  • Place 0VA03CB C/S to start:
  • Verify 0VA023Y OPEN OR THROTTLED
  • Verify 0VA436Y CLOSED EVALUATOR NOTE: JPM step 6 actions for starting 0C Plenum Charcoal Booster Fans per BwOP VA-5 are continued on the next page.

SIM-222 Page 5 of 10

PERFORMANCE STEP STANDARD CIRCLE APPLICABLE

  • 6. Start Aux Building Charcoal
  • Start ONE fan in plenum C Booster Fans. (BwOP VA-5) as follows:

o Verify 0VA03CE CUE: 0VA03CE transfer switch transfer switch in is in remote. remote

  • Place 0VA03CE C/S to start:
  • Verify 0VA067Y OPEN OR THROTTLED
  • Verify 0VA052Y CLOSED CUE: 0VA03CF transfer switch - OR -

is in remote. o Verify 0VA03CF transfer switch in remote

  • Place 0VA03CF C/S to start:
  • Verify 0VA072Y OPEN OR THROTTLED
  • Verify 0VA438Y CLOSED SIM-222 Page 6 of 10

PERFORMANCE STEP STANDARD CIRCLE APPLICABLE

7. Verify FHB Ventilation Aligned for Perform the following at SAT UNSAT N/A Emergency Operation 0PM02J: Comments:
  • Determines NO FHB Charcoal Absorber aligned.

EVALUATOR NOTE: The examinee may elect to immediately start the FHB Charcoal Booster Fans rather than starting the fans per BwOP VA-6. OP-AA-101-111, ROLES AND RESPONSIBILITIES OF ON SHIFT PERSONNEL, step 4.6.2.5, directs Reactor Operators to manually initiate safety systems automatic actions when operating parameters exceed the systems automatic initiation setpoints and the initiation does not occur.

If the examinee elects to immediately start the FHB Charcoal Booster Fans, refer to JPM step 9 actions listed on this page.

If the examinee elects to start the FHB Charcoal Booster Fans per BwOP VA-6, refer to JPM step 8 actions listed on JPM page 9.

  • 8. Start Fuel Handling Building Perform the following at SAT UNSAT N/A Charcoal Booster Fans. (1BwEP- 0PM02J: Comments:

0 step 23 Action Expected

  • Start ONE FHB Charcoal Response column) Booster Fan as follows:
  • Place 0VA04CA C/S to start:
  • Verify 0VA060Y OPEN
  • Verify 0VA057Y OPEN
  • Verify 0VA051Y CLOSED

- OR -

  • Place 0VA04CB C/S to start:
  • Verify 0VA055Y OPEN
  • Verify 0VA062Y OPEN
  • Verify 0VA435Y CLOSED SIM-222 Page 7 of 10

PERFORMANCE STEP STANDARD CIRCLE APPLICABLE

  • 8. Start Fuel Handling Building Locate and open BwOP VA-6. SAT UNSAT N/A Charcoal Booster Fans. (BwOP Refer to BwOP VA-6. Comments:

VA-6)

Perform the following at CUE: After examinee locates 0PM02J:

procedure, provide copy.

  • Align ONE FHB Exhaust CUE: All prerequisites, Plenum Pre-Filter as precautions, and follows:

limitations and actions are met.

  • Plenum A:
  • Verify 0VA058Y &

0VA059Y OPEN.

  • Verify 0VA053Y &

0VA054Y CLOSED

  • Plenum B:

NOTE: If examinee stops after

  • Verify 0VA053Y &

aligning FHB Exhaust 0VA054Y OPEN.

Plenum Pre-Filter, provide the following

  • Verify 0VA058Y &

cue: 0VA059Y CLOSED CUE: Unit 1 Unit Supervisor

  • Start 0VA04CA as follows:

directs you to start one

  • Verify 0VA062Y FHB Charcoal Booster CLOSED.

Fan.

  • Place 0VA04CA C/S to start:
  • Verify 0VA057Y OPEN
  • Verify 0VA060Y OPEN
  • Verify 0VA051Y CLOSED

- OR -

  • Start 0VA04CB as follows:
  • Verify 0VA057Y CLOSED.
  • Place 0VA04CB C/S to start:
  • Verify 0VA062Y OPEN
  • Verify 0VA055Y OPEN
  • Verify 0VA435Y CUE: As US, acknowledge CLOSED report. o Inform Unit Supervisor 1BwEP-0 steps 21-23 are complete.

CUE: THIS COMPLETES THIS JPM.

RECORD STOP TIME:

SIM-222 Page 8 of 10

SIMULATOR SETUP INSTRUCTIONS

  • Verify/perform TQ-BR-201-0113, BRAIDWOOD TRAINING DEPARTMENT SIMULATOR EXAMINATION SECURITY ACTIONS CHECKLIST.
  • Establish the conditions of IC-21, BOL 100% Power, Steady State, Equilibrium Xenon.
  • Complete items on Simulator Ready for Training Checklist.
  • Place simulator in RUN.
  • Insert IOR ZDISIL04A129S1 SILENCE to silence MCB main panel alarms.
  • Insert IOR ZDISIL04A123S1 SILENCE to silence MCB bypass permissive panel alarms.
  • Insert IRF RP44 OUT to disable Train A Slave Relay K602
  • Insert IRF RP70 OUT to disable Train B Slave Relay K602.
  • Insert IMF TH06A 1000 0 to initiate an RCS LOCA.
  • Manually actuate SI at 1PM05J or 1PM06J.
  • Take snapshot to 0 (if desired).
  • If running JPM repetitively, perform the following (or reset to IC-0 if snapshot used) before each performance:
  • Verify/Secure BOTH VC M/U Fans
  • Verify/Align BOTH VC Charcoal Absorbers to NORMAL
  • Verify/Secure ALL Aux Building Charcoal Booster Fans
  • Verify/Secure BOTH Fuel Handling Building Charcoal Booster Fan
  • Remove ALL place keeping marks from 1BwEP-0.

COMMENTS:

SIM-222 Page 9 of 10

JOB PERFORMANCE MEASURE TASK CONDITIONS:

1. You are the Unit 1 Assist NSO.
2. Unit 1 has experienced an RCS LOCA
3. 1BwEP-0, REACTOR TRIP OR SAFETY INJECTION, is in progress.

INITIATING CUES:

1. The Unit 1 Unit Supervisor has directed you to perform steps 21, 22, and 23 of 1BwEP-0.
2. Another NSO will monitor the remainder of the Main Control Board panels and address alarms as necessary.
3. Inform the Unit 1 Unit Supervisor when you have completed steps 21, 22, and 23 of 1BwEP-0.

SIM-222 Page 10 of 10