Appendix C, Rev. 9 Job Performance Measure Form ES-C-1 Worksheet Page 1 of 7 Facility: Davis-Besse Task No: 076-002-04-0100 Task

Title:

Loss of Service Water Loop 1 to Primary Loads Job Performance Measure No: A K/A

Reference:

062 AA1.02 (3.1/3.1)

Examinee:

NRC Examiner:

Facility Evaluator:

Date:

Method of testing:

Simulated Performance ___

Actual Performance _X_

Classroom ___

Simulator _X_

Plant ___

Read to the examinee:

I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues.

When you complete the task successfully, the objective for this job performance measure will be satisfied.

Initial Conditions:

The plant is in Mode 1 All systems are in a normal lineup, except that Service Water Pump 3 is out of service for maintenance Component Cooling Water Pump 1 is running and supplying primary equipment Component Cooling Water Pump 2 is in standby Task Standard: Swap non-essential Component Cooling Water loads from Loop 1 to Loop 2 due to a loss of Service Water Pump 1 Required Materials:

General

References:

DB-OP-02511, Loss of Service Water Pumps/System Initiating Cue:

Service Water Pump 1 has tripped The Unit Supervisor directs you to perform Step 4.1.3 of DB-OP-02511, Loss of Service Water Pumps Time Critical Task: No Validation Time: 20 Minutes

Appendix C, Rev. 9 Job Performance Measure Form ES-C-1 Worksheet Page 2 of 7 SIMULATOR INSTRUCTIONS INITIAL CONDITION:

100% power Service Water Pump 3 out of service ADDITIONAL SETUP/DEVIATION FROM INITIAL CONDITION:

Service Water Loop 1 on primary loads Place RED tags on Service Water Pump 3 control switches Trip/Stop Service Water Pump 1 by inserting malfunction IMF KEP103 Stop CAC 1 or 3 as 1 and close SW 1366 or SW 1368 MALFUNCTIONS/FAILURE TO INSERT:

Fail Component Cooling Water Loop 1 Temperature indicator, TI 1489, to 118°F using IMF KA20C Fail SW Header 2 pressure transmitter (PT-2809) to < 50 psig by inserting malfunction IMF KEP9E 0.293 ACTION/CUES:

None

Appendix C, Rev. 9 Job Performance Measure Form ES-C-1 Worksheet Page 3 of 7 CUE SHEET INITIAL CONDITIONS:

The plant is in Mode 1 All systems are in a normal lineup, except that Service Water Pump 3 is out of service for maintenance Component Cooling Water Pump 1 is running and supplying primary equipment Component Cooling Water Pump 2 is in standby INITIATING CUES:

Service Water Pump 1 has tripped The Unit Supervisor directs you to perform Step 4.1.3 of DB-OP-02511, Loss of Service Water Pumps

Appendix C, Rev. 9 Job Performance Measure Form ES-C-1 Worksheet Page 4 of 7 Performance Information Denote critical steps with a check mark Start Time

1.

PERFORMANCE STEP: Start Component Cooling Water Pump 2 STANDARD: Component Cooling Water Pump 2 control switch, HIS 1418, rotated clockwise to START CUE:

None SAT UNSAT Sequence of steps 2, 3, and 4 is not critical

2.

PERFORMANCE STEP: Shift non-essential loads to Component Cooling Water Loop 2 STANDARD: Push OPEN on HIS 5096, CC Line 2 Discharge Isolation Valve CUE:

None SAT UNSAT

3.

PERFORMANCE STEP: Shift non-essential loads to Component Cooling Water Loop 2 STANDARD: Push OPEN on HIS 5098, CC Line 2 Return Isolation Valve CUE:

None SAT UNSAT

4.

PERFORMANCE STEP: Shift non-essential loads to Component Cooling Water Loop 2 STANDARD: Push open on HIS 2649, CC From Aux. Bldg. to Line 2 Isolation CUE:

None SAT UNSAT

Appendix C, Rev. 9 Job Performance Measure Form ES-C-1 Worksheet Page 5 of 7 Sequence of steps 5, 6, and 7 is not critical

5.

PERFORMANCE STEP: Isolate Component Cooling Water Loop 1 STANDARD: Push CLOSE on HIS 5095, CC Line 1 Discharge Isolation Valve CUE:

None SAT UNSAT

6.

PERFORMANCE STEP: Isolate Component Cooling Water Loop 1 STANDARD: Push CLOSE on HIS 5097, CC Line 1 Return Isolation Valve CUE:

None SAT UNSAT

7.

PERFORMANCE STEP: Isolate Component Cooling Water Loop 1 STANDARD: Push CLOSE on HIS 2645, CC from Aux. Bldg. to Line 1 Isolation Valve CUE:

None SAT UNSAT

8.

PERFORMANCE STEP: Determine if Component Cooling Water Pump 1 is to remain running STANDARD: Communicate with the Unit Supervisor CUE:

The Unit Supervisor directs you to stop Component Cooling Water Pump 1 SAT UNSAT

Appendix C, Rev. 9 Job Performance Measure Form ES-C-1 Worksheet Page 6 of 7

9.

PERFORMANCE STEP: Recognize Service Water Loop 2 Header pressure is less than 50 psig STANDARD: Display Computer Point P946 CUE:

None SAT UNSAT

10. PERFORMANCE STEP: Verify CT 2955 is OPEN STANDARD: Depress the OPEN pushbutton on HIS 2955 CUE:

None SAT UNSAT TERMINATING CUES: This JPM is complete. (Terminated by the evaluator)

END TIME

Appendix C, Rev. 9 Job Performance Measure Form ES-C-1 Worksheet Page 7 of 7 Verification of Completion Job Performance Measure No.:

A Examinees Name:

Examiners Name:

Date Performed:

Facility Evaluator:

Number of Attempts:

Time to Complete:

Question Documentation:

Question:______________________________________________________________

Response:______________________________________________________________

Result: Satisfactory/Unsatisfactory Examiners Signature and Date: _______________________________________

Appendix C, Rev. 9 Job Performance Measure Form ES-C-1 Worksheet Page 1 of 7 Facility: Davis-Besse Task No: 000-058-05-0100 Task

Title:

Transfer LPI Suction to the Emergency Sump during a Large Break LOCA K/A

Reference:

011 EA 1.11 (4.2/4.2)

Job Performance Measure No:

B Examinee:

NRC Examiner:

Facility Evaluator:

Date:

Method of testing:

Simulated Performance ___

Actual Performance _X_

Classroom ___

Simulator _X_

Plant ___

Read to the examinee:

I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues.

When you complete the task successfully, the objective for this job performance measure will be satisfied.

Initial Conditions:

A large break LOCA has occurred and the BWST level is approaching nine feet Both MU pumps and HPI pumps have been stopped in accordance with Specific Rules Section 1 of Attachment 7 of DB-OP-02000 has been completed Task Standard:

Transfer LPI Suction to the Emergency Sump during a Large Break LOCA when the BWST reaches 9 feet Required Materials:

General

References:

Attachment 7 of DB-OP-02000, RPS, SFAS, SFRCS TRIP, OR SG TUBE RUPTURE Initiating Cue:

Annunciator "BWST LO-LO LVL, XFER TO EMER SUMP" (5-3-A) has been received The Unit Supervisor directs you to transfer LPI suction to the emergency sump in accordance with Section 2 of DB-OP-02000, Attachment 7 Time Critical Task: Yes/No Validation Time: 7 Minutes

Appendix C, Rev. 9 Job Performance Measure Form ES-C-1 Worksheet SIMULATOR INSTRUCTIONS INITIAL CONDITION:

Initiate a large break LOCA and ensure CTMT Spray is on ADDITIONAL SETUP/DEVIATION FROM INITIAL CONDITION:

Ensure DH 9A, DH 9B, DH 7A, DH7B and HP 31 are energized At ~12 ft. in the BWST:

Block and stop both HPI pumps Stop both Makeup pumps and stop their oil pumps Freeze the simulator when at least two SFAS channels have tripped on Low BWST level Leave the simulator frozen until the examinee is ready to start the JPM MALFUNCTIONS/FAILURE TO INSERT:

Open both hot leg leak valves at the same time, IMF HH41 1.0 and IMF HH40 1.0 Fail open DH7B, IMF BD7BC ACTION/CUES:

Step 7: Delete fail open malfunction on DH7B when the trainee depresses the close pushbutton on HIS DH7B, DMF BD7BC Page 2 of 7

Appendix C, Rev. 9 Job Performance Measure Form ES-C-1 Worksheet CUE SHEET INITIAL CONDITIONS:

A large break LOCA has occurred and the BWST level is approaching nine feet Both MU pumps and HPI pumps have been stopped in accordance with Specific Rules Section 1 of Attachment 7 of DB-OP-02000 has been completed INITIATING CUES:

Annunciator "BWST LO-LO LVL, XFER TO EMER SUMP" (5-3-A) has been received The Unit Supervisor directs you to transfer LPI suction to the emergency sump in accordance with Section 2 of DB-OP-02000, Attachment 7 Page 3 of 7

Appendix C, Rev. 9 Job Performance Measure Form ES-C-1 Worksheet Performance Information Denote critical steps with a check mark Start Time

1.

PERFORMANCE STEP: Verify both MU pumps are stopped STANDARD: Verify GREEN lights lit on HIS MU24A and HIS MU24B CUE: None SAT UNSAT

2.

PERFORMANCE STEP: Transfer MU Pump suctions to the MU tank STANDARD: Depress OFF and MUT on HIS 3971 and HIS 6405 CUE: None SAT UNSAT

3.

PERFORMANCE STEP: Verify Section 1 of Attachment 7 has been completed STANDARD: Verify per cue sheet section 1 is complete CUE:

(If asked) Section 1 is complete SAT UNSAT

4.

PERFORMANCE STEP: Block SFAS Level 2 on DH 7A, DH 9A, DH 7B and DH 9B STANDARD: Depress BLOCK pushbuttons for DH 7A or DH 9A and DH 7B or DH 9B CUE: None SAT UNSAT Page 4 of 7

Appendix C, Rev. 9 Job Performance Measure Form ES-C-1 Worksheet

5.

PERFORMANCE STEP: Open DH 9A and DH 9B STANDARD: Depress the OPEN pushbuttons on HIS DH9A and HIS DH9B CUE: None SAT UNSAT

6.

PERFORMANCE STEP: Verify that DH 7A and DH 7B start to close as DH 9A and DH 9B start to open STANDARD: Recognize DH7A starts to close (HIS DH7A RED light OFF) and DB7B fails to close (HIS DH7B RED light stays ON)

CUE: (I/S Cue) - Delete the failure of DH7B when the CLOSE pushbutton is depressed SAT UNSAT

7.

PERFORMANCE STEP: Close DH7B STANDARD: Depress the CLOSE pushbutton on HIS DH7B when DH9B is open CUE: None SAT UNSAT

8.

PERFORMANCE STEP: Verify the transfer is complete.

STANDARD: Check the RED indicating lights on HIS DH9A and HIS DH9B are LIT and the GREEN indicating lights on HIS DH7A and HIS DH7B are LIT Check low pressure injection flow CUE: None.

SAT UNSAT

9.

PERFORMANCE STEP: Verify CS pump discharge valves go to the throttle position STANDARD: Check IL 1530 and IL 1531 are LIT CUE: None.

SAT UNSAT Page 5 of 7

Appendix C, Rev. 9 Job Performance Measure Form ES-C-1 Worksheet

10. PERFORMANCE STEP: Close HPI pump Minimum Recirc Valves STANDARD: Depress the CLOSE pushbutton on HIS HP32 and HIS HP31 CUE: None SAT UNSAT
11. PERFORMANCE STEP: Close MU CTMT isolation valves STANDARD: Depress the CLOSE pushbutton on HIS MU 6422 and HIS MU 6421 CUE:

None SAT UNSAT

12. PERFORMANCE STEP: Close HPI Injection Valves STANDARD: Depress and hold the CLOSE pushbutton on HIS HP 2A, HIS HP 2B, HIS HP 2C and HIS HP 2D until only the Green light is lit CUE: None SAT UNSAT TERMINATING CUES: This JPM is complete. (Terminated by the evaluator)

END TIME Page 6 of 7

Appendix C, Rev. 9 Job Performance Measure Form ES-C-1 Worksheet Verification of Completion Job Performance Measure No.

B Examinees Name:

Examiners Name:

Date Performed:

Facility Evaluator:

Number of Attempts:

Time to Complete:

Question Documentation:

Question:_____________________________________________________________

Response:_____________________________________________________________

Result: Satisfactory/Unsatisfactory Examiners signature and date: _______________________________________

Page 7 of 7

Appendix C, Rev. 9 Job Performance Measure Form ES-C-1 Worksheet Page 1 of 7 Facility: Davis-Besse Task No: 012-007-01-0100 Task

Title:

Place the Reactor Protection System in Shutdown Bypass K/A

Reference:

012 A4.03 (3.6/3.6)

Job Performance Measure No:

C Examinee:

NRC Examiner:

Facility Evaluator:

Date:

Method of testing:

Simulated Performance ___

Actual Performance _X_

Classroom ___

Simulator _X_

Plant ___

Read to the examinee:

I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.

Initial Conditions:

A plant shutdown and cooldown is in progress RCS pressure is between 1700 and 1750 psig Task Standard: Place all four RPS channels in Shutdown Bypass in accordance with Section 3.3 of DB-OP-06403, RPS and NI Operating Procedure Required Materials:

General

References:

DB-OP-06403, RPS and NI Operating Procedure Initiating Cue:

The Unit Supervisor has directed you to place all four RPS Channels in Shutdown Bypass in accordance with Section 3.3 of DB-OP-06403, RPS and NI Operating Procedure Time Critical Task: No Validation Time: 13 Minutes

Appendix C, Rev. 9 Job Performance Measure Form ES-C-1 Worksheet SIMULATOR INSTRUCTIONS INITIAL CONDITION:

Mode 3, Post Trip ADDITIONAL SETUP/DEVIATION FROM INITIAL CONDITION:

Depressurize the RCS to 1750 psig Maintain RCS pressure between 1700 and 1750 psig Use CTS for spray valve fail to position, cycle IMF HV00E between 0.2 and 0 to provide some spray flow If necessary, use Pressurizer heaters to raise pressure MALFUNCTIONS/FAILURE TO INSERT:

None ACTION/CUES:

Sign off steps 3.3.1, 3.3.2, 3.3.3, 3.3.4, and 3.3.5 in DB-OP-06403 Page 2 of 7

Appendix C, Rev. 9 Job Performance Measure Form ES-C-1 Worksheet CUE SHEET INITIAL CONDITIONS:

A plant shutdown and cooldown is in progress RCS pressure is between 1700 and 1750 psig INITIATING CUES:

The Unit Supervisor directs you to place all four RPS Channels in Shutdown Bypass in accordance with Section 3.3 of DB-OP-06403, RPS and NI Operating Procedure Page 3 of 7

Appendix C, Rev. 9 Job Performance Measure Form ES-C-1 Worksheet Performance Information Denote critical steps with a check mark Start Time

1.

PERFORMANCE STEP: Obtain keys to RPS cabinet doors and RPS S/D bypass keys STANDARD: Obtain the correct keys from the Control Room key cabinet CUE: None SAT UNSAT Sequence of RPS Channels is not critical for step 2

2.

PERFORMANCE STEP: Place RPS Channels in shutdown bypass.

STANDARD: At the shutdown bypass key switch module, insert the key and rotate the key operated bypass switch to "Bypass" CH1 _____ CH2 _____ CH3 _____ CH4 _____

CUE: None SAT UNSAT Sequence of RPS Channels is not critical for step 3

3. PERFORMANCE STEP: Check the Shutdown Bypass Auxiliary Relay Module lights are bright STANDARD: Visual check of the top three lights on the Shutdown Bypass Auxiliary Relay Module in each RPS Channel CH1 _____ CH2 _____ CH3 _____ CH4 _____

CUE: None SAT UNSAT Sequence of RPS Channels is not critical for step 4 Page 4 of 7

Appendix C, Rev. 9 Job Performance Measure Form ES-C-1 Worksheet

4.

PERFORMANCE STEP: Reset S/D bypass high pressure trip bistable STANDARD: Depress the Output State and Output Memory reset switches on the SHUTDOWN BYPASS HIGH PRESSURE TRIP BISTABLE COMMENTS: Only OUTPUT STATE reset is critical.

CH1 _____ CH2 _____ CH3 _____ CH4 _____

CUE: None.

SAT UNSAT Sequence of RPS Channels is not critical for step 5

5. PERFORMANCE STEP: Check the Output State lights and Output Memory lights are dim STANDARD: Visual check of the Output State light and Output Memory light in each RPS Channel CH1 _____ CH2 _____ CH3 _____ CH4 _____

CUE: None SAT UNSAT Sequence of RPS Channels is not critical for step 6

6.

PERFORMANCE STEP: Reset Reactor Trip modules STANDARD: Reactor Trip module Toggle switch to "RESET" OR Obtain the Manual Bypass Key Insert the key and rotate the Manual Bypass Key Switch rotated to actuate the bypass relay for each RPS channel Rotated the Manual Bypass Key Switch back to the non-bypassed position COMMENTS: Either method acceptable CH1 _____ CH2 _____ CH3 _____ CH4 _____

CUE: None SAT UNSAT Page 5 of 7

Appendix C, Rev. 9 Job Performance Measure Form ES-C-1 Worksheet

7.

PERFORMANCE STEP: Verify the channel Protective Subsystem light at the top of each RPS cabinet is dim STANDARD: Visual observation of Protective Subsystem light status (on panel and top of cabinet) for each RPS cabinet CH1 _____ CH2 _____ CH3 _____ CH4 _____

CUE: None SAT UNSAT

8.

PERFORMANCE STEP: Lock the doors and return key STANDARD: Doors locked and key returned CH1 _____ CH2 _____ CH3 _____ CH4 _____

CUE: The Unit Supervisor is referring to DB-OP-06402, CRD Operating Procedure to reset the Reactor Trip breakers and CRD electronic trip devices SAT UNSAT TERMINATING CUES: This JPM is complete (terminated by the candidate)

END TIME Page 6 of 7

Appendix C, Rev. 9 Job Performance Measure Form ES-C-1 Worksheet Verification of Completion Job Performance Measure No.

C Examinees Name:

Examiners Name:

Date Performed:

Facility Evaluator:

Number of Attempts:

Time to Complete:

Question Documentation:

Question:_____________________________________________________________

Response:_____________________________________________________________

Result: Satisfactory/Unsatisfactory Examiners signature and date: _______________________________________

Page 7 of 7

Appendix C, Rev. 9 Job Performance Measure Form ES-C-1 Worksheet Page 1 of 8 Facility: Davis-Besse Task No: 013-005-05-0100 Task

Title:

Manually Initiate the Safety Features Actuation System K/A

Reference:

013 A4.03 (4.5/4.7)

Job Performance Measure No:

D Examinee:

NRC Examiner:

Facility Evaluator:

Date:

Method of testing:

Simulated Performance ___

Actual Performance _X_

Classroom ___

Simulator _X_

Plant ___

Read to the examinee:

I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues.

When you complete the task successfully, the objective for this job performance measure will be satisfied.

Initial Conditions:

A loss of coolant accident has occurred resulting in a loss of Subcooling Margin Subcooling Margin was subsequently regained The following valves have been blocked and reopened:

Containment Sample Valves CV 5010A through E and CV 5011A through E PZR and Quench Tank Sample Valves, RC 240A, RC 240B and RC 232 Letdown Isolation Valves MU2A and MU3 Task Standard:

At the system level, reset SFAS and manually initiate SFAS due to an increase in the RCS leak size OR at the equipment level, place all SFAS actuated components in their required SFAS position Required Materials:

General

References:

Attachment 9 of DB-OP-02000, RPS, SFAS, SFRCS TRIP, OR SG TUBE RUPTURE

Appendix C, Rev. 9 Job Performance Measure Form ES-C-1 Worksheet Initiating Cue:

Due to a change in leak size, RCS pressure is dropping rapidly and Containment pressure is increasing rapidly The Unit Supervisor directs you to manually actuate all SFAS components including the Containment Spray System Time Critical Task: No Validation Time: 6 Minutes Page 2 of 8

Appendix C, Rev. 9 Job Performance Measure Form ES-C-1 Worksheet SIMULATOR INSTRUCTIONS INITIAL CONDITION:

Full Power Steady State ADDITIONAL SETUP/DEVIATION FROM INITIAL CONDITION:

Verify the following conditions:

1. Block and open CV 5010A through E, CV 5011A through E.
2. Block and open RC240A, RC240B, RC232.
3.

Block and open MU2A and MU3.

4.

Freeze the simulator once conditions established.

5.

Run the simulation when directed.

MALFUNCTIONS/FAILURE TO INSERT:

Insert a RCS Hot Leg leak - IMF HH40 0.0004 Trip the Reactor - IMF L4TRC ACTION/CUES:

None Page 3 of 8

Appendix C, Rev. 9 Job Performance Measure Form ES-C-1 Worksheet CUE SHEET INITIAL CONDITIONS:

A loss of coolant accident has occurred resulting in a loss of Subcooling Margin Subcooling Margin was subsequently regained CTMT Sample Valves, CV 5010A through E and CV 5011A through E, have been blocked and reopened Pressurizer and Quench Tank Sample Valves, RC 240A, RC 240B and RC 232, have been blocked and reopened Letdown Isolation Valves, MU2A and MU3, have been blocked and reopened INITIATING CUES:

Due to a change in leak size, RCS pressure is dropping rapidly and Containment pressure is increasing rapidly The Unit Supervisor directs you to manually actuate all SFAS components including the Containment Spray System Page 4 of 8

Appendix C, Rev. 9 Job Performance Measure Form ES-C-1 Worksheet Performance Information Denote critical steps with a check mark Start Time

1.

PERFORMANCE STEP: Locate the correct procedure section STANDARD: Identifies DB-OP-02000, Attachment 9, as the correct procedure section COMMENT: Candidate may elect to perform from memory or from the posted operator aid Candidate may elect to actuate components at the equipment level. If this is done, go to step 8 of this JPM CUE: Provide examinee a copy of DB-OP-02000, Attachment 9 SAT UNSAT Sequence of steps 2 and 3 is not critical

2.

PERFORMANCE STEP: Reset SFAS at the system level STANDARD: Depress RESET on HIS 2022B COMMENT: Steps 2 and 3 must be performed prior to steps 3 or 4 CUE: None SAT UNSAT

3.

PERFORMANCE STEP: Reset SFAS at the system level STANDARD: Push RESET on HIS 2023B COMMENT: Operator may elect to actuate individual components. If this is done, ensure all components are actuated Step 2 must be performed prior to steps 3 or 4 CUE: None SAT UNSAT Page 5 of 8

Appendix C, Rev. 9 Job Performance Measure Form ES-C-1 Worksheet Sequence of steps 4 and 5 is not critical

4.

PERFORMANCE STEP: Trip Actuation Channel 1 for all components except Containment Spray STANDARD: Push TRIP pushbutton on HIS 2022A CUE: None SAT UNSAT

5.

PERFORMANCE STEP: Trip Actuation Channel 2 for all components except Containment spray STANDARD: Push TRIP pushbutton on HIS 2023A CUE: None SAT UNSAT Sequence of steps 6 and 7 is not critical

6.

PERFORMANCE STEP: Manually actuate Train 1 Containment Spray STANDARD: Push TRIP on HIS 2020A COMMENT: Also acceptable to manually Containment Spray Pump 1 CUE: None SAT UNSAT

7.

PERFORMANCE STEP: Manually actuate Train 2 Containment Spray STANDARD: Push TRIP on HIS 2021A COMMENT: Also acceptable to manually Containment Spray Pump 2 CUE: None SAT UNSAT Page 6 of 8

Appendix C, Rev. 9 Job Performance Measure Form ES-C-1 Worksheet Sequence of components is not critical in step 8

8.

PERFORMANCE STEP: Actuate SFAS components at the Equipment level Containment Spray STANDARD: Push CLOSE pushbutton on HIS 5010A Push CLOSE pushbutton on HIS 5010B Push CLOSE pushbutton on HIS 5010C Push CLOSE pushbutton on HIS 5010D Push CLOSE pushbutton on HIS 5010E Push CLOSE pushbutton on HIS 5011A Push CLOSE pushbutton on HIS 5011B Push CLOSE pushbutton on HIS 5011C Push CLOSE pushbutton on HIS 5011D Push CLOSE pushbutton on HIS 5011E Push CLOSE pushbutton on HIS RC240A Push CLOSE pushbutton on HIS RC240B Push CLOSE pushbutton on HIS RC232 Push CLOSE pushbutton on HIS MU2A Push CLOSE pushbutton on HIS MU3 Start Containment Spray Pump 1 using HIS 1533 Start Containment Spray Pump 2 using HIS 1532 COMMENT: This step is not required if SFAS was actuated at the system level CUE: None SAT UNSAT TERMINATING CUES: This JPM is complete. (Terminated by the Candidate)

END TIME Page 7 of 8

Appendix C, Rev. 9 Job Performance Measure Form ES-C-1 Worksheet Verification of Completion Job Performance Measure No.

D Examinees Name:

Examiners Name:

Date Performed:

Facility Evaluator:

Number of Attempts:

Time to Complete:

Question Documentation:

Question:_____________________________________________________________

Response:_____________________________________________________________

Result: Satisfactory/Unsatisfactory Examiners signature and date: _______________________________________

Page 8 of 8

Appendix C, Rev. 9 Job Performance Measure Form ES-C-1 Worksheet Page 1 of 7 Facility: Davis-Besse Task No: 029-010-01-0100 Task

Title:

Start the Containment Purge System in Mode 5 K/A

Reference:

029 A2.03 (2.7/3.1)

Job Performance Measure No:

E Examinee:

NRC Examiner:

Facility Evaluator:

Date:

Method of testing:

Simulated Performance ___

Actual Performance _X_

Classroom ___

Simulator _X_

Plant ___

Read to the examinee:

I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues.

When you complete the task successfully, the objective for this job performance measure will be satisfied.

Initial Conditions:

Mode 5 Task Standard:

Align Containment Purge dampers and start the Containment Purge System on Containment Required Materials:

General

References:

DB-OP-06503, Containment Purge System Procedure Initiating Cue:

The Unit Supervisor directs you to initiate a Containment Vessel purge per section 3.1 DB-OP-06503, Containment Purge System Procedure The Incore Instrument Tank will not be purged at this time Outside air temperature is 55°F All prerequisite steps have been completed for section 3.1 Time Critical Task: No Validation Time: 10 Minutes

Appendix C, Rev. 9 Job Performance Measure Form ES-C-1 Worksheet SIMULATOR INSTRUCTIONS INITIAL CONDITION:

Mode 5 ADDITIONAL SETUP/DEVIATION FROM INITIAL CONDITION:

Turn off Containment Purge Supply and Exhaust Fans Close dampers CV 5004, 5016, 5009 and 5021 Install fuses in SFAS cabinets Verify dampers CV 5005, 5006, 5007, and 5008 closed MALFUNCTIONS/FAILURE TO INSERT:

None ACTION/CUES:

Page 2 of 7

Appendix C, Rev. 9 Job Performance Measure Form ES-C-1 Worksheet CUE SHEET INITIAL CONDITIONS:

The plant is in Mode 5 INITIATING CUES:

The Unit Supervisor directs you to initiate a Containment Vessel purge per section 3.1 DB-OP-06503, Containment Purge System Procedure The Incore Instrument Tank will not be purged at this time Outside air temperature is 55°F All prerequisite steps have been completed for section 3.1 Page 3 of 7

Appendix C, Rev. 9 Job Performance Measure Form ES-C-1 Worksheet Performance Information Denote critical steps with a check mark Start Time

1.

PERFORMANCE STEP: Make a plant announcement STANDARD: Use the GAI-TRONICS announce starting of Containment Purge CUE: None SAT UNSAT Sequence of steps 2, 3, 4 and 5 is not critical

2.

PERFORMANCE STEP: Open the Containment Purge Isolation valve CV 5008 STANDARD: Press the OPEN pushbutton on HIS 5008 CUE: None SAT UNSAT

3.

PERFORMANCE STEP: Open the Containment Purge Isolation valve, CV 5006 STANDARD: Press the OPEN pushbutton on HIS 5006 CUE: None SAT UNSAT

4.

PERFORMANCE STEP: Open the Containment Purge Isolation valve, CV 5005 STANDARD: Press the OPEN pushbutton on HIS 5005 CUE: None SAT UNSAT Page 4 of 7

Appendix C, Rev. 9 Job Performance Measure Form ES-C-1 Worksheet

5.

PERFORMANCE STEP: Open the Containment Purge Isolation valve, CV 5007 STANDARD: Press the OPEN pushbutton on HIS 5007 CUE: None SAT UNSAT

6.

PERFORMANCE STEP: Start Containment Purge Exhaust Fan STANDARD: Turn handswitch HIS 5013 to START CUE: None SAT UNSAT

7.

PERFORMANCE STEP: Verify automatic actions occur STANDARD: Visually verify RED indicating light for Containment Purge Exhaust Fan ON COMMENTS: The fan will start in approximately 120 seconds CUE: None SAT UNSAT

8.

PERFORMANCE STEP: Start the Containment Purge Supply Fan STANDARD: Within 20 seconds after the exhaust fan starts, turn handswitch HIS 5003 to START CUE: None SAT UNSAT Page 5 of 7

Appendix C, Rev. 9 Job Performance Measure Form ES-C-1 Worksheet

9.

PERFORMANCE STEP: Verify automatic actions occur.

STANDARD: Visually verify RED indicating light for Containment Purge Supply Fan ON CUE: None SAT UNSAT TERMINATING CUES: This JPM is complete. (Terminated by the Candidate)

END TIME Page 6 of 7

Appendix C, Rev. 9 Job Performance Measure Form ES-C-1 Worksheet Verification of Completion Job Performance Measure No.

E Examinees Name:

Examiners Name:

Date Performed:

Facility Evaluator:

Number of Attempts:

Time to Complete:

Question Documentation:

Question:_____________________________________________________________

Response:_____________________________________________________________

Result: Satisfactory/Unsatisfactory Examiners signature and date: _______________________________________

Page 7 of 7

Appendix C, Rev. 9 Job Performance Measure Form ES-C-1 Worksheet Page 1 of 7 Facility: Davis-Besse Task No: 001-046-04-0100 Task

Title:

Recover from a CRD Sequence Fault K/A

Reference:

001 A2.14 (3.7/3.9)

Job Performance Measure No:

F Examinee:

NRC Examiner:

Facility Evaluator:

Date:

Method of testing:

Simulated Performance ___

Actual Performance _X_

Classroom ___

Simulator _X_

Plant ___

Read to the examinee:

I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues.

When you complete the task successfully, the objective for this job performance measure will be satisfied.

Initial Conditions:

The plant is in Mode 2 A Reactor startup is in progress Task Standard:

Reset the Relative Position Indication for Control Rod Group 5 during a Reactor startup Required Materials:

General

References:

DB-OP-02005, Primary Instrumentation Alarm Panel 5 Annunciators Initiating Cue:

The Unit Supervisor directs you to respond to Annunciator 5-6-E CRD SEQ FAULT in accordance with DB-OP-02005 Primary Instrumentation Alarm Panel 5 Annunciators Time Critical Task: No Validation Time: 14 Minutes

Appendix C, Rev. 9 Job Performance Measure Form ES-C-1 Worksheet SIMULATOR INSTRUCTIONS INITIAL CONDITION:

Mode 2 with a Reactor startup in progress ADDITIONAL SETUP/DEVIATION FROM INITIAL CONDITION:

Establish a startup IC with control rod group 6 around 2% withdrawn Lower group 5 RPI to 60%

Withdraw group 6 until the CRD SEQ FAULT annunciator comes IN MALFUNCTIONS/FAILURE TO INSERT:

None ACTION/CUES:

None Page 2 of 7

Appendix C, Rev. 9 Job Performance Measure Form ES-C-1 Worksheet CUE SHEET INITIAL CONDITIONS:

The plant is in Mode 2 A Reactor startup is in progress Annunciator 5-6-E CRD SEQ FAULT has just been received INITIATING CUES:

The Unit Supervisor directs you to respond to Annunciator 5-6-E CRD SEQ FAULT in accordance with DB-OP-02005 Primary Instrumentation Alarm Panel 5 Annunciators Page 3 of 7

Appendix C, Rev. 9 Job Performance Measure Form ES-C-1 Worksheet Performance Information Denote critical steps with a check mark Start Time

1.

PERFORMANCE STEP: Locate the correct procedure section STANDARD: Go to the section of DB-OP-02005 for annunciator 5-6-E COMMENT:

Provide the candidate a copy of the procedure section for annunciator 5-6-E from DB-OP-02005 CUE: (If asked) Rod Control Panel was in MANUAL prior to the alarm (If asked) SEQ BYPASS operation is NOT required at this time SAT UNSAT

2. PERFORMANCE STEP: Determine that Group 5 rods are initiating the Sequence Fault signal STANDARD: Compare Group 5 API and RPI indication by positioning the toggle switch between ABSOLUTE and RELATIVE CUE: The Unit Supervisor directs you to reset the RPI for the rods that are initiating the CRD Sequence Fault signal SAT UNSAT
3.

PERFORMANCE STEP: Verify Rod Control Panel is in SEQ BYPASS STANDARD: Depress SEQ BYPASS button CUE: None SAT UNSAT Page 4 of 7

Appendix C, Rev. 9 Job Performance Measure Form ES-C-1 Worksheet

4.

PERFORMANCE STEP: Select Group 5 STANDARD: Rotate the GROUP SELECT switch to the 5 position CUE: None SAT UNSAT

6.

PERFORMANCE STEP: Select all rods in Group 5 STANDARD: Rotate the SINGLE SELECT switch to the ALL position CUE: None SAT UNSAT

7. PERFORMANCE STEP: Select Relative Position Indication on the PI Panel STANDARD: Move the POSITION INDICATION SELECT toggle switch to the RELATIVE position CUE: None SAT UNSAT
8.

PERFORMANCE STEP: Align Group 5 RPI with Group 5 API STANDARD: RPI RESET switch held to RAISE until group 5 RPI is approximately equal to API and the CRD Control Panel SEQ INHIBIT light is OFF COMMENT:

Multiple adjustments may be made to align Group 5 API and RPI CUE: None SAT UNSAT Page 5 of 7

Appendix C, Rev. 9 Job Performance Measure Form ES-C-1 Worksheet

9. PERFORMANCE STEP: Select Absolute Position Indication on the PI Panel STANDARD: Move the POSITION INDICATION SELECT toggle switch to the ABSOLUTE position CUE: None SAT UNSAT
10.

PERFORMANCE STEP: Place the Rod Control Panel in the SEQUENCE mode STANDARD: Depress the SEQ pushbutton on Rod Control Panel CUE: None SAT UNSAT

11.

PERFORMANCE STEP: Turn SINGLE SELECT switch to OFF STANDARD: SINGLE SELECT switch rotated to OFF CUE: None SAT UNSAT

12.

PERFORMANCE STEP: Turn GROUP SELECT switch to OFF STANDARD: GROUP SELECT switch rotated to OFF CUE: None SAT UNSAT

13.

PERFORMANCE STEP: Determine that rod group overlap is satisfactory.

STANDARD: Compare group 5 and 6 API. Determine that overlap is 20-30%

COMMENT:

No overlap adjustment should be necessary from special IC CUE: None SAT UNSAT TERMINATING CUES: This JPM is complete. (Terminated by the Candidate)

END TIME Page 6 of 7

Appendix C, Rev. 9 Job Performance Measure Form ES-C-1 Worksheet Verification of Completion Job Performance Measure No.

F Examinees Name:

Examiners Name:

Date Performed:

Facility Evaluator:

Number of Attempts:

Time to Complete:

Question Documentation:

Question:_____________________________________________________________

Response:_____________________________________________________________

Result: Satisfactory/Unsatisfactory Examiners signature and date: _______________________________________

Page 7 of 7

Appendix C, Rev. 9 Job Performance Measure Form ES-C-1 Worksheet Page 1 of 6 Facility: Davis-Besse Task No: 000-079-04-0100 Task

Title:

Station Vent High Radiation Response K/A

Reference:

071 A3.03 (3.6/3.8)

Job Performance Measure No:

G Examinee:

NRC Examiner:

Facility Evaluator:

Date:

Method of testing:

Simulated Performance ___

Actual Performance _X_

Classroom ___

Simulator _X_

Plant ___

Read to the examinee:

I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues.

When you complete the task successfully, the objective for this job performance measure will be satisfied.

Initial Conditions:

The plant is in Mode A leak has developed on the Waste Gas Decay Tank High radiation has been detected in the Auxiliary Building and in the Station Vent.

Annunciator 9-3-A, UNIT VENT RAD HI has alarmed Task Standard:

Shutdown normal Control Room Ventilation and start Control Room Emergency Ventilation due to high radiation in the Station Vent Required Materials:

General

References:

DB-OP-02009 Initiating Cue:

The Unit Supervisor directs you to implement alarm procedure DB-OP-02009 Plant Services Alarm Panel 9 Annunciators for annunciator 9-3-A Time Critical Task: No Validation Time: 9 Minutes

Appendix C, Rev. 9 Job Performance Measure Form ES-C-1 Worksheet SIMULATOR INSTRUCTIONS INITIAL CONDITION:

Any Mode ADDITIONAL SETUP/DEVIATION FROM INITIAL CONDITION:

Raise Activity in WGDT #3 to maximum AA65B 1-3 MED RAD UCS, CB=500 IMF CDG4E 0.001 IMF CDI4E 0.001 IMF CD43B IMF CD44B IMF CD45B IMF CD47B IMF CD48B IMF CD49B MALFUNCTIONS/FAILURE TO INSERT:

Insert leak on #3 WGDT IMF AA65I 0.1 Override ON Annunciator 9-3-A UNIT VENT RAD HI ACTION/CUES:

Page 2 of 6

Appendix C, Rev. 9 Job Performance Measure Form ES-C-1 Worksheet CUE SHEET INITIAL CONDITIONS:

The plant is in Mode A leak has developed on the Waste Gas Decay Tank High radiation has been detected in the Auxiliary Building and in the Station Vent.

Annunciator 9-3-A, UNIT VENT RAD HI has alarmed INITIATING CUES:

The Unit Supervisor directs you to implement alarm procedure DB-OP-02009 Plant Services Alarm Panel 9 Annunciators for annunciator 9-3-A Page 3 of 6

Appendix C, Rev. 9 Job Performance Measure Form ES-C-1 Worksheet Performance Information Denote critical steps with a check mark Start Time Sequence of steps 1, 2, 3, and 4 is not critical

1.

PERFORMANCE STEP: Verify Control Room Ventilation Unit 1 has shutdown STANDARD: Depress HIS 5316 CONTROL ROOM VENT SYS 1 CUE: None SAT UNSAT

2.

PERFORMANCE STEP: Verify Control Room HVAC dampers have closed STANDARD: Depress CLOSE on HIS 5301 HA 5301A-H, 5361A&B CUE: None SAT UNSAT

3.

PERFORMANCE STEP: Verify Control Room Ventilation Unit 2 has shutdown STANDARD: Visual check of HIS 5317 CONTROL ROOM VENT SYS 2 green light lit CUE: None SAT UNSAT

4.

PERFORMANCE STEP: Verify Control Room HVAC dampers have closed STANDARD: Depress CLOSE on HIS 5311 HA 5311A-H, 5362A&B CUE: The Unit Supervisor has assigned another Operator to refer to DB-OP-06412 for actions for a Radioactive Release Event The Unit Supervisor directs you to continue in this procedure SAT UNSAT Page 4 of 6

Appendix C, Rev. 9 Job Performance Measure Form ES-C-1 Worksheet Sequence of steps 5 and 6 is not critical

5.

PERFORMANCE STEP: Start Control Room Emergency Ventilation System Train 1 STANDARD: Rotate HIS 5261 CONTROL ROOM EMER VENT FAN 1 to START CUE:

(If asked) The Unit Supervisor has assigned an Equipment Operator to refer to DB-OP-06505 to perform the required local actions for the startup of Control Room Emergency Ventilation System Train 1 The Unit Supervisor directs you to continue in this procedure SAT UNSAT

6.

PERFORMANCE STEP: Start Control Room Emergency Ventilation System Train 2 STANDARD: Rotate HIS 5262 CONTROL ROOM EMER VENT FAN 2 to START CUE:

The Unit Supervisor has assigned an Equipment Operator to refer to DB-OP-06505 to perform the required local actions for the startup of Control Room Emergency Ventilation System Train 2 The Unit Supervisor directs you to continue in this procedure (If asked) None of the following activities are in progress:

WGDT Batch Release Containment Purge Boric Acid Evaporator operation SAT UNSAT

7.

PERFORMANCE STEP: Go to RA-EP-02861 Radiological Incidents STANDARD: Indicate intent to implement RA-EP-02861 CUE: The Unit Supervisor has implemented RA-EP-02861 Radiological Incidents SAT UNSAT TERMINATING CUES: This JPM is complete. (Terminated by the evaluator)

END TIME Page 5 of 6

Appendix C, Rev. 9 Job Performance Measure Form ES-C-1 Worksheet Verification of Completion Job Performance Measure No.

G Examinees Name:

Examiners Name:

Date Performed:

Facility Evaluator:

Number of Attempts:

Time to Complete:

Question Documentation:

Question:_____________________________________________________________

Response:_____________________________________________________________

Result: Satisfactory/Unsatisfactory Examiners signature and date: _______________________________________

Page 6 of 6

Appendix C, Rev. 9 Job Performance Measure Form ES-C-1 Worksheet Facility: Davis-Besse Task No: 045-004-01-0100 Task

Title:

Synchronize the Main Generator to the Grid K/A

Reference:

062 A4.07 (3.1/3.1)

Job Performance Measure No:

H Examinee:

NRC Examiner:

Facility Evaluator:

Date:

Method of testing:

Simulated Performance ___

Actual Performance _X_

Classroom ___

Simulator _X_

Plant ___

Read to the examinee:

I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues.

When you complete the task successfully, the objective for this job performance measure will be satisfied.

Initial Conditions:

A plant startup is in progress Reactor power is 18% power The Main Turbine is rolling at 1800 RPM Section 3.1 of DB-OP-06301, Generator and Exciter Operating Procedure, has been completed to prepare the Main Generator and Exciter for startup Task Standard:

Synchronize the Main Generator to the grid and apply an initial load to the Generator Required Materials:

General

References:

DB-OP-06301, Generator and Exciter Operating Procedure Initiating Cue:

The Unit Supervisor directs you to synchronize the Main Generator to the grid and apply initial load in accordance with section 3.2 of DB-OP-06301 Time Critical Task: No Validation Time: 21 Minutes

Appendix C, Rev. 9 Job Performance Measure Form ES-C-1 Worksheet SIMULATOR INSTRUCTIONS INITIAL CONDITION:

Reactor power at 18% power ADDITIONAL SETUP/DEVIATION FROM INITIAL CONDITION:

DB-OP-06901 has been completed up to step 3.63 Main Turbine is rolling at 1800 RPM Section 3.1 of DB-OP-06301 is complete The prerequisites of Section 3.2 of DB-OP-06301 are complete MALFUNCTIONS/FAILURE TO INSERT:

None ACTION/CUES:

Step 9 -

Role play as the System Dispatcher to acknowledge the Generator is ready to be synchronized Step 10 - Role play as the CAS operator to acknowledge that breaker operation in the switchyard is about to be performed Step 11 - Role play as an Equipment Operator to close ABS 34620

Appendix C, Rev. 9 Job Performance Measure Form ES-C-1 Worksheet CUE SHEET INITIAL CONDITIONS:

A plant startup is in progress Reactor power is 18% power The Main Turbine is rolling at 1800 RPM Section 3.1 of DB-OP-06301, Generator and Exciter Operating Procedure, has been completed to prepare the Main Generator and Exciter for startup INITIATING CUES:

The Unit Supervisor directs you to synchronize the Main Generator to the grid and apply initial load in accordance with section 3.2 of DB-OP-06301 Section 3.2 prerequisites have been completed

Appendix C, Rev. 9 Job Performance Measure Form ES-C-1 Worksheet Performance Information Denote critical steps with a check mark Start Time Sequence of steps 1 and 2 is not critical

1.

PERFORMANCE STEP: Open ACB 34560, Generator Breaker to Bus J STANDARD: Rotate HIS 6111 to the TRIP position CUE: (If asked) The Shift Manager is referring to Tech Spec 3.8.1.1 for A.C. Sources SAT UNSAT

2.

PERFORMANCE STEP: Open ACB 34561, Generator Breaker to Bus K STANDARD: Rotate HIS 6113 to the TRIP position CUE: (If asked) The Shift Manager is referring to Tech Spec 3.8.1.1 for A.C. Sources SAT UNSAT

3.

PERFORMANCE STEP: Verify TD-3B03 Disconnect 94AMX/G disconnects are closed STANDARD: Visual check of TD-3B03 knife switches in the CLOSED position CUE: TD-3B03 is closed SAT UNSAT

4.

PERFORMANCE STEP: Close the Exciter Field Breaker STANDARD: Rotate HIS 6021 to the CLOSE position CUE: None SAT UNSAT

Appendix C, Rev. 9 Job Performance Measure Form ES-C-1 Worksheet

5.

PERFORMANCE STEP: Close the Generator Field Breaker STANDARD: Rotate HIS 6010 to the CLOSE position CUE: None SAT UNSAT

6.

PERFORMANCE STEP: Raise Generator Voltage using the Manual Voltage Regulator STANDARD: Rotate HIS 6012 to the RAISE/LOWER position and increase/decrease to 24.5KV on EI 6000 CUE: None SAT UNSAT

7.

PERFORMANCE STEP: Null Generator Field Transfer Volts using the Automatic Voltage Regulator STANDARD: Rotate HIS 6014 to the RAISE/LOWER position and null indication on EI 6008 CUE: None.

SAT UNSAT

8.

PERFORMANCE STEP: Place the Main Generator Voltage Regulator in automatic STANDARD: Rotate HIS 6011 to AUTO position CUE: None.

SAT UNSAT

9.

PERFORMANCE STEP: Notify System Dispatcher the Generator is ready to be synchronized STANDARD: Communicate with the System Dispatcher CUE:

SAT UNSAT

Appendix C, Rev. 9 Job Performance Measure Form ES-C-1 Worksheet

10. PERFORMANCE STEP: Notify the CAS operator that breaker operation in the switchyard is about to be performed STANDARD: Communicate with the CAS operator CUE: None SAT UNSAT
11. PERFORMANCE STEP: Direct an Equipment Operator to close ABS 34620 in the 345 KV Switchyard STANDARD: Communicate with an Equipment Operator in the Switchyard to close ABS 34620 CUE: None SAT UNSAT
12. PERFORMANCE STEP: Turn on the synchroscope for ACB 34561 or ACB 34560 STANDARD: Rotate HIS 6113 to ON for ACB 34561 OR Rotate HIS 6111 to ON for ACB 34560 COMMENT:

Either ACB 34561or ACB 34560 can be used for synchronization CUE: (If asked) The Shift Manager directs you to synchronize the Main Generator using ACB 34560 SAT UNSAT

13. PERFORMANCE STEP: Match Generator voltage with Grid voltage by matching EI 6016, Incoming Volts, with EI 6018, Running Volts STANDARD: Rotate HIS 6014 to the RAISE/LOWER to match EI 6016 with EI 6018 CUE: None SAT UNSAT

Appendix C, Rev. 9 Job Performance Measure Form ES-C-1 Worksheet

14. PERFORMANCE STEP: Adjust Generator frequency to slightly higher value than the Grid frequency speed STANDARD: Rotate HIS 6022 to the RAISE or LOWER position to cause SY 6017, Synchroscope, to rotate slowly in the FAST direction COMMENT: May need to readjust HIS 6014 to maintain Running and Incoming Voltages matched CUE: None SAT UNSAT
15. PERFORMANCE STEP: Make a plant announcement STANDARD: Use the Gai-Tronics to inform all station personnel of the Generator Synchronization CUE: None SAT UNSAT
16. PERFORMANCE STEP: Close ACB 34561 or ACB 34560 STANDARD: Rotate HIS 6113 or HIS 6111 to the CLOSE position when the Synchroscope is at or just before the 12 o'clock position CUE: None SAT UNSAT
17. PERFORMANCE STEP: Raise the Generator loading rate STANDARD: Depress the LOADING RATE LIMIT 10% pushbutton CUE: None SAT UNSAT

Appendix C, Rev. 9 Job Performance Measure Form ES-C-1 Worksheet

18. PERFORMANCE STEP: Raise Generator Load to prevent a reverse power/anti-motoring trip STANDARD: Depress the INCREASE pushbutton on the LOAD CONTROL SELECTOR to raise Generator load to 50 MWE CUE: None SAT UNSAT
19. PERFORMANCE STEP: Turn off the synchroscope for ACB 34561 or ACB 34560 STANDARD: Rotate HIS 6113 to OFF for ACB 34561 OR Rotate HIS 6111 to OFF for ACB 34560 CUE: None SAT UNSAT
20. PERFORMANCE STEP: Turn on the synchroscope for ACB 34561 or ACB 34560 STANDARD: Rotate HIS 6113 to ON for ACB 34561 OR Rotate HIS 6111 to ON for ACB 34560 COMMENT: Turn on the synchroscope for the breaker that was NOT closed previously CUE: None SAT UNSAT
21. PERFORMANCE STEP: Check the synchroscope at the 12 o'clock position or synchroscope lights are OFF STANDARD: Visual check of the SY6017, Synchroscope and/or the SL6017A and SL6017B, Synchroscope lights CUE: None SAT UNSAT

Appendix C, Rev. 9 Job Performance Measure Form ES-C-1 Worksheet

22. PERFORMANCE STEP: Close ACB 34561 or ACB 34560 STANDARD: Rotate HIS 6113 or HIS 6111 to the CLOSE position COMMENT: Close the breaker that was NOT closed previously CUE: None SAT UNSAT
23. PERFORMANCE STEP: Turn off the synchroscope for ACB 34561 or ACB 34560 STANDARD: Rotate HIS 6113 to OFF for ACB 34561 OR Rotate HIS 6111 to OFF for ACB 34560 CUE: (If asked) The Shift Manager is referring to Tech Spec 3.8.1.1 for A.C. Sources SAT UNSAT TERMINATING CUES: This JPM is complete. (Terminated by the examiner)

END TIME

Appendix C, Rev. 9 Job Performance Measure Form ES-C-1 Worksheet Verification of Completion Job Performance Measure No.

H Examinees Name:

Examiners Name:

Date Performed:

Facility Evaluator:

Number of Attempts:

Time to Complete:

Question Documentation:

Question:_____________________________________________________________

Response:_____________________________________________________________

Result: Satisfactory/Unsatisfactory Examiners signature and date: _______________________________________