May 1, 2008 MEETING

SUMMARY

LICENSEE: DOMINION NUCLEAR CONNECTICUT, INC.

FACILITY: MILLSTONE POWER STATION

SUBJECT:

SUMMARY

OF APRIL 17, 2008, ANNUAL ASSESSMENT MEETING WITH DOMINION NUCLEAR CONNECTICUT, INC.

On April 17, 2008, at 2:00 p.m., the Annual Assessment Meeting was conducted at the Waterford Town Hall, Waterford, CT, between the Nuclear Regulatory Commission and Dominion Nuclear Connecticut, Inc.. The NRC requested this meeting with the management of Dominion to discuss the NRCs Annual Assessment of the performance of the Millstone Power Station in 2007.

The NRC presented and discussed its assessment of the safety performance of Millstone for the period from January 1 through December 31, 2007. The NRC presentations included a discussion of the Reactor Oversight Process (ROP), a summary of national performance assessment results, and the results of the NRCs performance assessment of Millstone. As part of this regulatory performance meeting, Dominion presented its perspective regarding the plants performance and operational goals for 2008.

The public was invited to observe the meeting and at the end of the meeting was offered the opportunity to communicate with the NRC regarding Dominions performance at Millstone and the role of the agency in ensuring safe plant operations. Specific questions/topics raised by the Connecticut Coalition Against Millstone (CCAM) included, but were not limited to:

  • The status of the licensees efforts concerning the identification of tritium in a building foundation sump.
  • The April 6, 2008 Unusual Event.
  • CCAM asked what the NRC does to monitor and assess the health of the population in the area of the Millstone Station and the health of former workers.
  • CCAM requested that the NRC review and respond to a review of a DEP report regarding environmental and health impacts in the Millstone area. CCAM stated they would forward the review to the NRC.

The NRC's assessment letter can be found in ADAMS with an Accession Number of ML080630630. The annual assessment meeting notice, with the attached meeting agenda, can be found in ADAMS with Accession Number ML080920073.

2 The NRC slides of the meeting can be found with Accession Number ML080880100. ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html.

Sincerely,

/RA/

Raymond J. Powell, Chief Projects Branch 5 Division of Reactor Projects

Enclosures:

1. Meeting Attendees
2. NRC Slides

Enclosure 1 Meeting Attendees Name Organization Ray Powell Nuclear Regulatory Commission (NRC)

Steve Shaffer Nuclear Regulatory Commission (NRC)

Jamie Benjamin Nuclear Regulatory Commission (NRC)

Jim Krafty Nuclear Regulatory Commission (NRC)

Barry Norris Nuclear Regulatory Commission (NRC)

Carleen Sanders Nuclear Regulatory Commission (NRC)

Juan Ayala Nuclear Regulatory Commission (NRC)

John Hughey Nuclear Regulatory Commission (NRC)

Marlayna Vaaler Nuclear Regulatory Commission (NRC)

Alan Price Dominion Nuclear Connecticut, Inc.

Skip Jordan Dominion Nuclear Connecticut, Inc.

Rich Griffin Dominion Nuclear Connecticut, Inc.

Bob MacManus Dominion Nuclear Connecticut, Inc.

Jeff Langan Dominion Nuclear Connecticut, Inc.

Tom Cleary Dominion Nuclear Connecticut, Inc.

Dan Steward Town of Waterford Bill Sheehan Nuclear Energy Advisory Council (NEAC)

Nancy Burton Connecticut Coalition Against Millstone (CCAM)

Ward Lindsey Self Park Honan Self

2 The NRC slides of the meeting can be found with Accession Number ML080880100. ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html.

Sincerely,

/RA/

Raymond J. Powell, Chief Projects Branch 5 Division of Reactor Projects

Enclosures:

1. Meeting Attendees
2. NRC Slides Distribution S. Collins, RA M. Dapas, DRA D. Lew, DRP J. Clifford, DRP R. Powell, DRP B. Norris, DRP J. Ayala, DRP C. Sanders, DRP J. Hughey , NRR M. Vaaler, NRR N. Sieller, DRP S. Shaffer, DRP, SRI J. Benjamin, DRP, RI J. Krafty, DRP, RI C. Kowalyshyn, DRP, OA Region I Docket Room (with concurrences)

SUNSI Review Complete: RJP (Reviewer=s Initials)

DOCUMENT NAME: T:\DRP\BRANCH5\Annual Assessment Meeting Summaries\Millstone AA Meeting Summary.doc After declaring this document AAn Official Agency Record@ it will be released to the Public.

To receive a copy of this document, indicate in the box: "C" = Copy without attachment/enclosure "E" = Copy with attachment/enclosure "N" = No copy OFFICE RI/DRP RI/DRP NAME BNorris/NSS FOR RPowell/RJP DATE 05/01/08 05/01/08 OFFICIAL RECORD COPY