Initial Schedule for Review of TSTF-506
ML081230083
Person / Time
Site: Technical Specifications Task Force
Issue date: 05/02/2008
From: Robert Elliott
NRC/NRR/ADRO/DIRS/ITSB
To:
Technical Specifications Task Force
Hamm, Matthew DIRS/ITSB 415-1472
References
TAC MD8343
Download: ML081230083 (3)


Text

May 02, 2008 Technical Specifications Task Force (TSTF) 11921 Rockville Pike, Suite 100 Rockville, MD 20852

SUBJECT:

ACCEPTANCE FOR REVIEW AND ESTABLISHMENT OF MILESTONE SCHEDULE FOR TSTF TRAVELER 506, REVISION 0, REVISE PRIMARY CONTAINMENT AND DRYWELL HYDROGEN IGNITER SPECIFICATION TO NOT REQUIRE RECOMBINERS. (TAC NO.

MD8343)

Dear Members of the TSTF,

By letter dated March 04, 2008 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML080640769), the Technical Specifications Task Force (TSTF) requested that the Nuclear Regulatory Commission (NRC) review and approve TSTF Traveler 506, Revision 0, Revise Primary Containment and Drywell Hydrogen Igniter Specification to Not Require Recombiners under the Consolidated Line Item Improvement Process (CLIIP).

NRC Technical staff have completed a preliminary review of your submission and have determined that it is an appropriate submission in that it contains adequate information in order to initiate a more comprehensive review. The enclosed review milestone schedule for the review of TSTF-506, Revision 0 has been established, and Technical Assignment Control (TAC) MD8343 has been assigned for this task. Current estimates are that it will take approximately 220 man-hours for the NRC to process TSTF-506, Revision 0.

Section 170.21 of Title 10 of the Code of Federal Regulations requires that TSTF Travelers are subject to fees based on the full cost of the review. You did not request a fee exemption; therefore, staff hours will be billed as requested to the Boiling Water Reactor Owners Group.

Should circumstances lead to anticipated or actual schedule slippage, the causing party should promptly inform and coordinate with the other party to reach a new agreement and publish an appropriately revised schedule. This is of particular importance in connection with TSTF response to NRC staff requests for additional information (RAIs) as failure to provide a timely responsive reply, in accordance with the agreed schedule, or to successfully negotiate a revised schedule, may result in termination of the review process and closure of the TAC. Early completion of any activity will not necessitate schedule revision. Schedule revisions that change the projected Notice of Availability date by more than 2 weeks will be published by letter similar to this and will remain in effect unless superseded by another published schedule.

TSTF 2 Mr. Matthew Hamm (301-415-1472; Email: Matthew.Hamm@nrc.gov) has been assigned as the ITSB project lead. Please contact Mr. Hamm in coordinating activities specific to this review.

Sincerely,

/RA/

Robert Elliott, Chief Technical Specifications Branch Division of Inspection and Regional Support Office of Nuclear Reactor Regulation

Enclosure:

As stated cc: See next page

ML081230083 OFFICE ITSB:DIRS BC:ITSB:DIRS NAME MHamm RElliott DATE 5/02/2008 5/02/2008

MILESTONE SCHEDULE FOR TSTF TRAVELER 506, REVISION 0, REVISE PRIMARY CONTAINMENT AND DRYWELL HYDROGEN IGNITER SPECIFICATION TO NOT REQUIRE RECOMBINERS.

MILESTONE SCHEDULE DATE Application 3/4/2008 Request For Additional Information (RAIs) if needed 8/8/2008 RAI Response from TSTF 11/10/2008 Issue Notice For Comment on Model Safety 1/12/2009 Evaluation and Model Application Issue Notice of Availability for Model Safety 4/13/2009 Evaluation and Model Application Close Out TAC 4/13/2009 Enclosure

Technical Specifications Task Force Mailing List cc:

Techncial Specifications Task Force Donald R. Hoffman 11921 Rockville, Pike EXCEL Services Corporation Suite 100 11921 Rockville Pike, Suite 100 Rockville, MD 20852 Rockville, MD 20852 tstf@excelservices.com donaldh@excelservices.com George G. Yates Brian Mann AmerenUE Callaway Plant EXCEL Services Corporation Junction Hwy. CC and Hwy. O 11921 Rockville Pike, Suite 100 Mail Code CA-460 Rockville, MD 20852 P.O. Box 620 brianm@excelservices.com Fulton, MO 65251 gyates@ameren.com John Messina First Energy Nuclear Operating Company 76 South Main Street Mail Sto: Akron-GO-14 Akron, OH 44308 jmessina@firstenergycorp.com David Bice Entergy N-GSB64 Russellville, AR 72802 dbice@entergy.com Reene= V. Gambrell Duke Energy Mailcode: ON03RC 7800 Rochester Highway Seneca, SC 29672 RVGambrell@duke-energy.com