ML081150091

From kanterella
Jump to navigation Jump to search

Proposed Stretch Power Uprate to Millstone Power Station, Unit 3
ML081150091
Person / Time
Site: Millstone Dominion icon.png
Issue date: 04/23/2008
From: Gillespie F
NRC/ACNW&M, Advisory Committee on Reactor Safeguards
To: Reyes L
NRC/EDO
Bessette, D. ACRS, 301-8065
References
Download: ML081150091 (1)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION ADVISORY COMMITTEE ON REACTOR SAFEGUARDS ADVISORY COMMITTEE ON NUCLEAR WASTE AND MATERIALS WASHINGTON, DC 20555 - 0001 April 23, 2008 MEMORANDUM TO: Luis A. Reyes Executive Director for Operations FROM: Frank P. Gillespie, Executive Director /RA/

Advisory Committee on Reactor Safeguards Advisory Committee on Nuclear Waste & Materials

SUBJECT:

PROPOSED STRETCH POWER UPRATE TO MILLSTONE POWER STATION, UNIT 3 During the 551st meeting of the Advisory Committee on Reactor Safeguards, April 10-12, 2008, the Committee considered the staffs draft safety evaluation regarding the Dominion Nuclear Connecticut, Inc. application to increase the maximum authorized power level of Millstone Power Station, Unit 3, from 3,411 MWt to 3,650 MWt. The Committee decided to review the Millstone Unit 3 stretch power uprate application and the associated NRC staffs safety evaluation.

Reference:

Memorandum from Harold K. Chernoff, Chief, Plant Licensing Branch 1-2, Division of Operating Reactor Licensing, Office of Nuclear Reactor Regulation (NRR) to Cayetano Santos, Chief, Reactor Safety Branch, Advisory Committee on Reactor Safeguards, transmitting, Safety Evaluation by NRR Related to Amendment to Facility Operating License No. NPF-49 Dominion Nuclear Connecticut, Incorporated Millstone Power Station, Unit 3, Docket No. 50-423, April 2, 2008 cc: A. Vietti-Cook, SECY V. Ordaz, OEDO D. Diaz-Toro, OEDO H. Chernoff, NRR J. Lamb, NRR C. Burkhalter, NRR M. Khanna, NRO J. Mitchell, RES CONTACT: David E. Bessette, ACRS 301-415-8065

MEMORANDUM TO: Luis A. Reyes Executive Director for Operations FROM: Frank P. Gillespie, Executive Director Advisory Committee on Reactor Safeguards Advisory Committee on Nuclear Waste & Materials

SUBJECT:

PROPOSED STRETCH POWER UPRATE TO MILLSTONE POWER STATION, UNIT 3 During the 551st meeting of the Advisory Committee on Reactor Safeguards, April 10-12, 2008, the Committee considered the staffs draft safety evaluation regarding the Dominion Nuclear Connecticut, Inc. application to increase the maximum authorized power level of Millstone Power Station, Unit 3, from 3,411 MWt to 3,650 MWt. The Committee decided to review the Millstone Unit 3 stretch power uprate application and the associated NRC staffs safety evaluation.

Reference:

Memorandum from Harold K. Chernoff, Chief, Plant Licensing Branch 1-2, Division of Operating Reactor Licensing, Office of Nuclear Reactor Regulation (NRR) to Cayetano Santos, Chief, Reactor Safety Branch, Advisory Committee on Reactor Safeguards, transmitting, Safety Evaluation by NRR Related to Amendment to Facility Operating License No. NPF-49 Dominion Nuclear Connecticut, Incorporated Millstone Power Station, Unit 3, Docket No. 50-423, April 2, 2008 cc: A. Vietti-Cook, SECY V. Ordaz, OEDO D. Diaz-Toro, OEDO H. Chernoff, NRR J. Lamb, NRR C. Burkhalter, NRR M. Khanna, NRO J. Mitchell, RES CONTACT: David E. Bessette, ACRS 301-415-8065 DOCUMENT NAME: G:\ACRS LTRS\551 ACRS\memo\Millstone memo.doc ADAMS ML081150091 To receive a copy of this document, indicate in the box: "C" = Copy without attachment/enclosure "E" = Copy with attachment/enclosure "N" = No copy

  • See previous concurrence
  • Zena Abdullahi OFFICE ACRS ACRS ACRS/SUNSI ACRS/ACNW&M NAME DBessette CSantos GShukla FGillespie DATE 04/16/08 04/16/08 04/16/08 04/23/08 OFFICIAL RECORD COPY