MONTHYEARML0729703392007-10-19019 October 2007 License Amendment Request, Revise Local Power Range Monitor Calibration Frequency Project stage: Request ML0809906682008-03-0404 March 2008 License Amendment Request - Revised LPRM Calibration Frequency Supplemental Response - Global Nuclear Fuel Report - Gnf S-0000-0082-2744, Rev. 0, Limerick LPRM Calibration Interval Extension Support, (Non-Proprietary Version) Project stage: Supplement ML0808505652008-03-14014 March 2008 License Amendment Request - Revise LPRM Calibration Frequency, Supplemental Response - Global Nuclear Fuel Report - Limerick LPRM Calibration Interval Extension Support. Project stage: Supplement ML0808702442008-03-14014 March 2008 License Amendment Request, Revise LPRM Calibration Interval - Global Nuclear Fuel Report Limerick LPRM Calibration Interval Extension Support Project stage: Request ML0809906672008-03-26026 March 2008 Transmittal of Limerick, Units 1 & 2 - License Amendment Request - Revised LPRM Calibration Frequency Supplemental Response - Global Nuclear Fuel Report - Gnf S-0000-0082-2744, Rev. 0, Limerick LPRM Calibration Interval Extension Support. Project stage: Supplement ML0815701822008-06-0505 June 2008 Electronic Transmission, Draft Request for Additional Information Regarding Local Power Range Monitor Calibration Frequency Revision Project stage: Draft RAI ML0816305572008-06-20020 June 2008 Request for Additional Information Regarding Proposed Local Power Range Monitor Calibration Frequency Revision Project stage: RAI ML0820702012008-07-18018 July 2008 Response to Request for Additional Information Concerning License Amendment Request to Revise Local Power Range Monitor Calibration Frequency Project stage: Response to RAI ML0827503992008-10-28028 October 2008 Request for Withholding Information from Public Disclosure Regarding Limerick Generating Station, Units 1 and 2 Project stage: Withholding Request Acceptance ML0827503852008-10-28028 October 2008 Issuance of Amendments 195 & 156 Extend Local Power Range Monitor Calibration Interval Project stage: Approval 2008-03-26
[Table View] |
|
---|
Category:Letter
MONTHYEARIR 05000352/20243012024-02-0202 February 2024 Initial Operator Licensing Examination Report 05000352/2024301 and 05000353/2024301 IR 05000352/20230042024-01-31031 January 2024 Integrated Inspection Report 05000352/2023004 and 05000353/2023004 IR 05000352/20240112024-01-31031 January 2024 Information Request to Support Post-Approval Site Inspection for License Renewal; Inspection Report 05000352/2024011 ML24026A2962024-01-26026 January 2024 Supplement to License Amendment Request to Revise the Licensing and Design Basis to Incorporate the Replacement of Existing Safety-Related Analog Control Systems with a Single Digital Plant Protection System (PPS)- Syrs, . ML24004A0342024-01-17017 January 2024 Exemption from Select Requirements of 10 CFR Part 73 (EPID L-2023-LLE-0026 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) IR 05000352/20230102024-01-11011 January 2024 Age-Related Degradation Report 05000352/2023010 and 05000353/2023010 IR 05000352/20234012023-12-21021 December 2023 Cybersecurity Inspection Report 05000352/2023401 and 05000353/2023401 ML23321A2362023-12-14014 December 2023 Issuance of Amendment Nos. 262 and 224 Adoption of TSTF-477, Revision 3 and Associated Technical Specification Changes ML23278A1292023-12-14014 December 2023 Units 1 & 2; Limerick, Units 1 & 2; Nine Mile Point, Units 1 & 2; and Peach Bottom, Units 2 & 3 -Revision to Approved Alternatives to Use Boiling Water Reactor Vessel and Internals Project Guidelines ML23333A2182023-11-29029 November 2023 Operator Licensing Examination Approval ML23325A2062023-11-21021 November 2023 Supplement to License Amendment Request to Revise the Licensing and Design Basis to Incorporate the Replacement of Existing Safety-Related Analog Control Systems with a Single Digital Plant Protection System ML23313A0432023-11-13013 November 2023 Summary of Regulatory Audit in Support of Amendment Request for Control Room Air Conditioning Technical Specifications ML23317A1192023-11-10010 November 2023 Constellation Energy Generation, LLC - 2023 Annual Report - Guarantees of Payment of Deferred Premiums IR 05000352/20230032023-10-27027 October 2023 Integrated Inspection Report 05000352/2023003 and 05000353/2023003 and Independent Spent Fuel Storage Installation Inspection 07200065/2023001 ML23297A1722023-10-24024 October 2023 Request for Information for a Biennial Problem Identification and Resolution Inspection; Inspection Report 05000352/2024010 and 05000353/2024010 IR 05000352/20235012023-10-17017 October 2023 Emergency Preparedness Biennial Exercise Inspection Report 05000352/2023501 and 05000353/2023501 RS-23-097, Constellation Energy Generation, LLC, Advisement of Leadership Changes and Submittal of Updated Standard Practice Procedures Plans2023-10-12012 October 2023 Constellation Energy Generation, LLC, Advisement of Leadership Changes and Submittal of Updated Standard Practice Procedures Plans ML23279A0612023-10-0505 October 2023 Paragon Energy Solutions LLC, Part 21 Final Report Re Potential Defect with Eaton Jd and Hjd Series Molded Case Circuit Breakers (Mccbs) ML23276A5162023-10-0303 October 2023 Federal Emergency Management Agency Level 1 Finding from 2023 Evaluated Emergency Preparedness Exercise ML23275A1082023-09-29029 September 2023 FEMA Level 1 Findings Limerick NPP- Boyertown/Colebrookdale ML23241A9452023-09-27027 September 2023 Generation Station, Units 1 and 2 Regulatory Audit Plan Supporting Review of the Equipment Qualification Portion of Limerick Digital Instrumentation and Controls License Amendment Request ML23269A0522023-09-26026 September 2023 Request for Information and Notification of Conduct of IP 71111.21.N.04, Age-Related Degradation, Reference Inspection Report 05000352/2023010 and 05000353/2023010 ML23255A0952023-09-12012 September 2023 Resubmittal of License Amendment Request to Revise the Licensing and Design Basis to Incorporate the Replacement of Existing Safety-Related Analog Control Systems with a Single Digital Plant Protection System (PPS) to Address ML23254A0242023-09-0606 September 2023 Paragon Energy Solutions LLC, Potential Defect with Eaton Jd and Hjd Series Molded Case Circuit Breakers (Mccbs) ML23249A1002023-09-0606 September 2023 Requalification Program Inspection IR 05000352/20230052023-08-31031 August 2023 Updated Inspection Plan for Limerick Generating Station, Units 1 and 2 (Report 05000352/2023005 and 05000353/2023005) ML23248A2082023-08-31031 August 2023 UFSAR Cover Page ML23242A2172023-08-30030 August 2023 Response to Request for Additional Information for Application to Adopt TSTF-477, Revision 3, Add Action for Two Inoperable Control Room AC Subsystems and Associated Technical Specification Changes NMP2L2851, Relief Request Associated with Successive Inspections for Generic Letter 88-01 / BWRVIP-75-A Augmented Examinations2023-08-25025 August 2023 Relief Request Associated with Successive Inspections for Generic Letter 88-01 / BWRVIP-75-A Augmented Examinations ML23228A0942023-08-16016 August 2023 Response to Request for Additional Information for Supplemental License Amendment Request to Revise Technical Specifications and Exemption Request from Requirements of 10CFR50.62 ATWS Rule to Support the . IR 05000352/20230022023-08-14014 August 2023 Integrated Inspection Report 05000352/2023002 and 05000353/2023002 ML23220A0182023-08-0808 August 2023 Information Request for the Cybersecurity Baseline Inspection, Notification to Perform Inspection 05000352/2023401 and 05000353/2023401 RS-23-087, Revision to Approved Alternatives Associated with the Use of the BWRVIP Guidelines in Lieu of Specific ASME Code Requirements on Reactor2023-08-0404 August 2023 Revision to Approved Alternatives Associated with the Use of the BWRVIP Guidelines in Lieu of Specific ASME Code Requirements on Reactor ML23212B2362023-07-31031 July 2023 Supplement to License Amendment Request to Revise the Licensing and Design Basis to Incorporate the Replacement of Existing Safety-Related Analog Control Systems with a Single Digital Plant Protection System - WEC Documents ML23212B1052023-07-31031 July 2023 Supplement to License Amendment Request to Revise Technical Specifications and Exemption Request from Requirements of 10CFR50.62 ATWS Rule to Support the Digital Modernization Project Installation - Revise ML23202A2192023-07-21021 July 2023 Response to Request for Additional Information for Supplemental License Amendment Request to Revise Technical Specifications and Exemption Request from Requirements of 10CFR50.62 ATWS Rule to Support the . ML23193B0122023-07-20020 July 2023 Audit Plan in Support of Review of License Amendment Request and Exemption Request for Digital Instrumentation and Controls Installation Support (Epids L-2023-LLA-0025 and L-2023-LLE-0005) ML23187A0962023-07-19019 July 2023 Generation Station, Unit Nos. 1 and 2 - Revised Estimated Review Completion Date Concerning License Amendment Request to Replace Existing Safety-Related Analog Control Systems with a Single Digital Plant Protection System ML23208A1522023-07-0606 July 2023 PEMA Letter Dated 7-6-23 Re Limerick Exercise 9-26-23 ML23177A2242023-06-26026 June 2023 Supplement to License Amendment Request to Revise the Licensing and Design Basis to Incorporate the Replacement of Existing Safety-Related Analog Control Systems with a Single Digital Plant Protection . ML23145A1972023-06-23023 June 2023 Correction to the Renewed Facility Operating License Pages in Amendment Nos. 255, 256, 257, 258, 259, and 260 2024-02-02
[Table view] |
Text
Exelon Nuclear www.exeloncorp.com Exeln 200 Exelon Way Nuclear Kennett Square, PA 19348 March 26, 2008 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555-0001 Limerick Generating Station, Units 1 and 2 Facility Operating License Nos. NPF-39 and NPF-85 Docket Nos. 50-352 and 50-353
Subject:
License Amendment Request - Revised LPRM Calibration Frequency Supplemental Response - Global Nuclear Fuel Report - GNF S-0000-0082-2744, Rev. 0, "Limerick LPRM Calibration Interval Extension Support," dated March 4, 2008
Reference:
- 1) Letter from Pamela B. Cowan, Exelon Generation Company, LLC, to U. S. Nuclear Regulatory Commission, "License Amendment Request -
Revise Local Power Range Monitor Calibration Frequency," dated October 19, 2007
- 2) Letter from Pamela B. Cowan, Exelon Generation Company, LLC, to U. S. Nuclear Regulatory Commission - License Amendment Request -
Revise LPRM Calibration Frequency, Supplemental Response - Global Nuclear Fuel Report - "Limerick LPRM Calibration Interval Extension Support,"
dated March 14, 2008 By letter dated October 19, 2007 (Reference 1), Exelon Generation Company, LLC (Exelon) requested changes to the Technical Specifications (TS), Appendix A of Facility Operating License Nos. NPF-39 and NPF-85 for Limerick Generating Station (LGS), Units 1 and 2, respectively. The proposed changes would increase the interval between Local Power Range Monitor (LPRM) calibrations from 1000 Effective Full Power Hours (EFPH) to 2000 EFPH.
By letter dated March 14, 2008 (Reference 2), Exelon submitted supplemental information in support of extending the LPRM calibration interval at LGS. The information provided was a Global Nuclear Fuel (GNF) report titled "LimerickLPRM CalibrationInterval Extension Support."
Subsequently, during a teleconference discussion with NRC and Exelon representatives on March 19, 2008, the NRC requested a copy of a document that was referenced in the GNF report (Reference 9 - GNF S-0000-0082-2744) submitted in the Reference 2 letter.
Attachment I transmittedherewith contains SUNSL When separatedfrom the attachment,this k- tW transmittaldocument is decontrolled.
U.S. Nuclear Regulatory Commission License Amendment Request - Revise LPRM Calibration Frequency Docket Nos. NPF-39 and NPF-85 March 26, 2008 Page 2 Accordingly, Attachment 1 contains the requested GNF report GNF S-0000-0082-2744, Rev. 0, "LimerickLPRM CalibrationInterval Extension Support,"dated March 4, 2008, which GNF considers to contain proprietary information. The proprietary information is identified by bracketed text. GNF requests that the proprietary information in Attachment 1 be withheld from public disclosure, in accordance with the requirements of 10 CFR 9.17(a)(4) and 10 CFR 2.390(a)(4). An original signed affidavit supporting this request is included in Attachment 1 to this letter. Attachment 2 to this letter provides a non-proprietary version of the subject GNF report.
Exelon has concluded that the information provided in this supplemental response does not impact the conclusions of the: 1) Technical Analysis, 2) No Significant Hazards Consideration under the standards set forth in 10 CFR 50.92(c), or 3) Environmental Consideration as provided in the Reference 1 submittal.
There are no regulatory commitments contained within this letter. If you have any further questions or require additional information, please contact Richard Gropp at 610-765-5557.
I declare under penalty of perjury that the foregoing is true and correct. Executed on the 26th day of March 2008.
Respectfully, Pamela B. Cowan Director - Licensing and Regulatory Affairs Exelon Generation Company, LLC : Global Nuclear Fuel Report GNF S-0000-0082-2744, Rev. 0, "Limerick LPRM Calibration Interval Extension Support" (Proprietary Version and supporting Affidavit) : Global Nuclear Fuel Report GNF S-0000-0082-2744, Rev. 0, "Limerick LPRM Calibration Interval Extension Support" (Non-Proprietary Version) cc: Regional Administrator - NRC Region I w/ Attachment 2 only NRC Senior Resident Inspector- LGS NRC Project Manager, NRR - LGS Director, Bureau of Radiation Protection - Pennsylvania Department of Environmental Protection