Request from Dominion Nuclear Connecticut to File a Petition on April 18th, 2008
ML080980386
Person / Time
Site: Millstone Dominion icon.png
Issue date: 04/07/2008
From: Travieso-Diaz M
Dominion Nuclear Connecticut, Pillsbury, Winthrop, Shaw, Pittman, LLP
To: Abramson P, William Froehlich, Kennedy M
Atomic Safety and Licensing Board Panel
SECY RAS
Shared Package
ML080980383 List:
References
50-423-OLA, ASLBP 08-862-01-OLA-BD01, Power Station 50-423-OLA, RAS 638
Download: ML080980386 (2)


Text

2300 N Street NW Washington, DC 20037-1122 Tel 202.663.8000 Fax 202.663.8007 www.pillsburylaw.com Matias F. Travieso-Diaz Phone: 202.663.8142 matias.travieso-diaz@pillsburylaw.com April 7, 2008 Administrative Judge William J. Froehlich, Chair Atomic Safety and Licensing Board Panel Mail Stop - T-3 F23 U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 Administrative Judge Dr. Paul B. Abramson Atomic Safety and Licensing Board Panel Mail Stop - T-3 F23 U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 Administrative Judge Dr. Michael F. Kennedy Atomic Safety and Licensing Board Panel Mail Stop - T-3 F23 U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 In the Matter of Dominion Nuclear Connecticut, Inc.

(Millstone Power Station, Unit No. 3)

Docket No. 50-423-OLA

Dear Administrative Law Judges:

We are counsel for Applicant Dominion Nuclear Connecticut, Inc. (Dominion) in the above referenced proceeding. We are in receipt of the letter to the Board dated April 4, 2008 from Lloyd B. Subin, Counsel for the NRC Staff, indicating the Staffs understanding that, under the Commissions ruling in Dominion Nuclear Connecticut, Inc. (Millstone Nuclear Power Station, Units 1 and 2), CLI-06-4, 63 NRC 32, 38-39 (2006), the Staffs response to Connecticut Coalition Against Millstone and Nancy Burtons Petition to Intervene and Request for Hearing (Petition) in this proceeding would be due on April 18, 2008. Dominion respectfully requests that, should the Board agree with the Staffs position, Dominion be permitted to also file its response to the Petition on April 18, 2008. Simultaneous filings by Applicant and the Staff would contribute to the orderly administration of this proceeding, since any potential replies by Petitioners to the responses by Applicant and the Staff would be due on the same date, April 25, 2008. See 10 C.F.R. § 2.309(h)(2).

April 7, 2008 Page 2 Administrative Judges Froehlich, Abramson and F. Kennedy Enclosed with this letter are Notices of Appearance by the undersigned.

Sincerely,

/Original signed by Matias F. Travieso-Diaz/

David R. Lewis Matías F. Travieso-Díaz Stefanie M. Nelson Lillian M. Cuoco Counsel for Dominion Nuclear Connecticut, Inc.

cc: Service List Pillsbury Winthrop Shaw Pittman LLP