Letter Sequence Other |
---|
|
|
MONTHYEARNL-07-2168, License Amendment Request to Revise Technical Specifications (TS) 3.3.2, ESFAS Instrumentation, and TS 3.5.4, Refueling Water Storage Tank (Rwst).2008-01-0909 January 2008 License Amendment Request to Revise Technical Specifications (TS) 3.3.2, ESFAS Instrumentation, and TS 3.5.4, Refueling Water Storage Tank (Rwst). Project stage: Request ML0802901802008-01-28028 January 2008 RAI for LAR TS RWST Low Level (GSI 191) Project stage: RAI NL-08-0143, Response to NRC Request for Additional Information Regarding License Amendment Request to Revise Technical Specifications (TS) 3.3.2, ESFAS Instrumentation, and TS 3.5.4. Refueling Water Storage Tank (Rwst).2008-02-0606 February 2008 Response to NRC Request for Additional Information Regarding License Amendment Request to Revise Technical Specifications (TS) 3.3.2, ESFAS Instrumentation, and TS 3.5.4. Refueling Water Storage Tank (Rwst). Project stage: Response to RAI NL-08-0300, Response to NRC Request for Additional Information Regarding License Amendment Request to Revise Technical Specification (TS) 3.3.2, ESFAS Instrumentation, and TS 3.5.4, Refueling Water Storage Tank (Rwst).2008-03-0505 March 2008 Response to NRC Request for Additional Information Regarding License Amendment Request to Revise Technical Specification (TS) 3.3.2, ESFAS Instrumentation, and TS 3.5.4, Refueling Water Storage Tank (Rwst). Project stage: Response to RAI ML0806605122008-03-10010 March 2008 Request for Withholding Information from Public Disclosure, Response to Request for Additional Information Regarding Technical Specifications 3.3.2 and 3.5.4, MD7772 and MD7773 Project stage: RAI NL-08-0769, Response to NRC Request for Additional Information Regarding License Amendment Request to Revise Technical Specification (TS) 3.3.2, ESFAS Instrumentation, and TS 3.5.4. Refueling Water Storage Tank (Rwst).2008-05-22022 May 2008 Response to NRC Request for Additional Information Regarding License Amendment Request to Revise Technical Specification (TS) 3.3.2, ESFAS Instrumentation, and TS 3.5.4. Refueling Water Storage Tank (Rwst). Project stage: Response to RAI ML0808801802008-07-0707 July 2008 Issuance of Amendments 151 and 132 Regarding Revision to Technical Specification to Lower the Normal Trip Setpoint of the Refueling Water Storage Tank Project stage: Approval ML0808801982008-07-0707 July 2008 Tech Spec Pages for Amendments 151 and 132 Regarding Revision to Technical Specification to Lower the Normal Trip Setpoint of the Refueling Water Storage Tank Project stage: Other 2008-03-10
[Table View] |
|
---|
Category:Technical Specifications
MONTHYEARML23317A2072023-12-22022 December 2023 Issuance of Amendments 223 and 206 Regarding Revision to Technical Specifications to Adopt TSTF-339-A, Relocate Technical Specification Parameters to the COLR Consistent with WCAP-1448 ML23243B0572023-12-19019 December 2023 VEGP Unit 4 Amendment Attachment ML23243A9802023-12-19019 December 2023 VEGP Unit 3 Amendment Attachment ML23268A0572023-11-0707 November 2023 Issuance of Amendments 194 & 191 Request for License Amendment Relocation of Technical Specification 3.7.9, Spent Fuel Pool Makeup Water Sources (LAR-23-003) ML23093A0282023-08-0101 August 2023 Issuance of Amendments Nos. 220 and 203, Regarding Use of Accident Tolerant Fuel Lead Test Assemblies ML23159A0992023-07-31031 July 2023 Attachment - Vogtle Electric Generating Plant, Unit 3 Amendment No. 192 (LAR 23-001) ML23158A2092023-07-19019 July 2023 LAR-23-005 U/4 Amd 189 Timing of TS Effectiveness Prior to Initial Criticality Amendment Attachment NL-23-0506, to Non-Voluntary License Amendment Request: Technical Specification Revision to Adopt WCAP-17661-P-A, Improved RAOC and CAOC Fq Surveillance Technical Specifications2023-07-0505 July 2023 to Non-Voluntary License Amendment Request: Technical Specification Revision to Adopt WCAP-17661-P-A, Improved RAOC and CAOC Fq Surveillance Technical Specifications ML23115A1492023-06-15015 June 2023 Issuance of Amendments No. 218 and 201 Regarding Revision to Technical Specifications to Use Online Monitoring Methodology NL-23-0385, License Amendment Request: More Restrictive Action for Technical Specification 3.1.9 (LAR-23-006R1)2023-05-17017 May 2023 License Amendment Request: More Restrictive Action for Technical Specification 3.1.9 (LAR-23-006R1) ML23072A2752023-05-0101 May 2023 Attachment to Enclosure 1 - VEGP U3 Amendment 191 LAR-22-005 ML23037A0902023-02-0808 February 2023 Amend Attachment - Vogtle 3 Amend No. 190, Tech Spec Exceptions for In-Containment Refueling Water Storage Tank Operability Prior to Initial Criticality (Exigent Circumstances) ML23037A9212023-02-0606 February 2023 SNC Presentation - Draft Vogtle TSTF-339 LAR - Pre-Submittal Meeting - February 13 2023 ML23013A2192023-01-13013 January 2023 Amendment No. 189 - Amendment Attachment ND-22-0219, Technical Specifications Setpoint Report2022-08-11011 August 2022 Technical Specifications Setpoint Report ML22116A0842022-07-0505 July 2022 Issuance of Amendment Nos. 215 and 198, Regarding Revision to Technical Specification 3.7.2, Main Steam Isolation Valves (Msivs) ML22069A0042022-04-27027 April 2022 Issuance of Amendments Revision to TSs to Adopt TSTF-269-A, Rev. 2, Allow Administrative Means of Position Verification for Locked or Sealed Valves ML21349A5182022-02-0202 February 2022 Issuance of Amendments Regarding Revision to Technical Specifications to Adopt TSTF-554, Revise RCS Leakage ML21316A0552022-01-0505 January 2022 1 & 2, and Vogtle Electric Generating Plant, 1 & 2 - Issuance of Amendments Regarding Revision to Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube Inspections (EPID L-2021-LLA-0163 ML21270A0862021-11-18018 November 2021 Issuance of Amendments Regarding Revision to Technical Specifications 5.7, High Radiation, Administrative Controls NL-21-0385, Application to Revise Technical Specifications to Adopt TSTF-554, Revise Reactor Coolant Leakage Requirements2021-09-29029 September 2021 Application to Revise Technical Specifications to Adopt TSTF-554, Revise Reactor Coolant Leakage Requirements ML20247J4632020-10-14014 October 2020 Attachment - Vogtle Electric Generating Plant Unit 4 Amendment 183 (LAR-20-004) ML20247J4602020-10-14014 October 2020 Attachment - Vogtle Electric Generating Plant Unit 3 Amendment 185 (LAR-20-004) ND-20-0668, Request for License Amendment for Vacuum Relief Valve Technical Specification Changes (LAR-20-005)2020-06-19019 June 2020 Request for License Amendment for Vacuum Relief Valve Technical Specification Changes (LAR-20-005) ML20013G7122020-02-0303 February 2020 Amendment 173 (LAR-19-016) ML19337C3222020-01-29029 January 2020 Issuance of Amendments Revision to Technical Specifications to Adopt TSTF-563 ML19298A1042019-10-25025 October 2019 Attachment - VEGP U4 Amendment XX5 (LAR-19-001) NL-19-1183, Response to Request for Additional Information Regarding End State Revision from Hot Shutdown to Cold Shutdown2019-10-17017 October 2019 Response to Request for Additional Information Regarding End State Revision from Hot Shutdown to Cold Shutdown ND-19-1129, Supplement to the Request for License Amendment Regarding Protection and Safety Monitoring System Surveillance Requirement Reduction Technical Specification ...2019-10-0707 October 2019 Supplement to the Request for License Amendment Regarding Protection and Safety Monitoring System Surveillance Requirement Reduction Technical Specification ... ML19238A3482019-09-27027 September 2019 Attachment - Vogtle Electric Generating Plant Unit 3 (LAR-19-004) ML19238A3492019-09-27027 September 2019 Attachment - Vogtle Electric Generating Plant Unit 4 (LAR-19-004) ML19063C6402019-04-11011 April 2019 Attachment - Vogtle Electric Generating Plant Unit 3 Amendment 158 (LAR-18-027) ML19063C6412019-04-11011 April 2019 Attachment - VEGP U4 Amendment 156 (LAR-18-027) ML19038A4572019-02-25025 February 2019 Attachment - Vogtle Electric Generating Plant, Units 4 (LAR 18-025) ML19038A4552019-02-25025 February 2019 Attachment - Vogtle Electric Generating Plant, Units 3 (LAR 18-025) ML19035A7602019-02-22022 February 2019 Attachment for Amendment 153 - LAR-18-024 ML19035A7582019-02-22022 February 2019 Attachment for Amendment 154 - LAR-18-024 ML18351A1942019-01-15015 January 2019 Attachment - Vogtle Electric Generating Plant Unit 4 LAR 18-017 ML18351A1922019-01-15015 January 2019 Attachment - Vogtle Electric Generating Plant Unit 3 LAR 18-017 ML18341A0832018-12-18018 December 2018 Attachment - Vogtle Electric Generating Plant - Unit 3 Amendment 149(LAR-18-022) ML18341A0852018-12-18018 December 2018 Attachment - Vogtle Electric Generating Plant, Unit 4 Amendment 148 (LAR-18-022) ML18296A4182018-11-13013 November 2018 Attachment - Vogtle Electric Generating Plant Unit 4 ML18296A4172018-11-13013 November 2018 Attachment - Vogtle Electric Generating Plant Unit 3 ML18263A0392018-10-29029 October 2018 Issuance of Amendments to Extend the Containment Type a Leak Rate Test Frequency to 15 Years and Type C Leak Rate Test Frequency to 75 Months (CAC Nos. MG0240 and MG0241; EPID L-2017-LLA-0295) ML18180A0622018-08-10010 August 2018 Issuance of Amendment Nos. 196 and 179 Regarding Application of the Seismic Probabilistic Risk Assessment Into the Previously Approved 10 CFR.50.69. Categorization Process ML18173A3062018-07-26026 July 2018 Attachment - Vogtle Electric Generating Plant, Unit 4 Amendment 134 (LAR-18-003) ML18173A3042018-07-26026 July 2018 Attachment - Vogtle Electric Generating Plant, Unit 3 Amendment 135 (LAR-18-003) ML18082B3772018-07-19019 July 2018 Attachment - Vogtle Electric Generating Plant Unit 3 Amendment 134(LAR-18-005) ML18082B3792018-07-19019 July 2018 Attachment - Vogtle Electric Generating Plant Unit 4 Amendment 133(LAR-18-005) ML18156A1482018-07-10010 July 2018 Attachment - Vogtle Electric Generating Plant Unit 4 (LAR 17-044) 2023-08-01
[Table view] |
Text
(2) Technical Specifications and Environmental Protection Plan The Technical S,,'"ifications contained in Appendix A, as revised through Amendment No.15,'and the Environmental Protection Plan contained in Appendix B, both of which-are attached hereto, are hereby incorporated into this license. Southern Nuclear shall operate the facility in accordance with the Technical Specifications and the Environmental Protection Plan.
(3) Southern Nuclear Operating Company shall be capable of establishing containment hydrogen monitoring within 90 minutes of initiating safety injection following a loss of coolant accident.
(4) DELETED (5) DELETED (6) DELETED (7) DELETED (8) DELETED (9) DELETED (10) Mitigation Strategy License Condition The licensee shall develop and maintain strategies for addressing large fires and explosions and that include the following key areas:
(a) Fire fighting response strategy with the following elements:
- 1. Pre-defined coordinated fire response strategy and guidance
- 2. Assessment of mutual aid fire fighting assets
- 3. Designated staging areas for equipment and materials
- 4. Command and control
- 5. Training of response personnel (b) Operations to mitigate fuel damage considering the following:
1.. Protection and use of personnel assets
- 2. Communications
- 3. Minimizing fire spread
- 4. Procedures for implementing integrated fire response strategy
- 5. Identification of readily-available pre-staged equipment
- 6. Training on integrated fire response strategy
- 7. Spent fuel pool mitigation measures (c) Actions to minimize release to include consideration of:
I. Water spray scrubbing
- 2. Dose to onsite responders Amendment No. 151
C. This license shall be deemed to contain and is subject to the conditions specified in the Commission's regulations set forth in 10 CFR Chapter I and'is subject to all applicable provisions of the Act and to the rules, regulations, and orders of the Commission now or hereafter in effect, and is subject to the additional conditions specified or incorporated below.
(1) Maximum Power Level Southern Nuclear is authorized to operate the facility at reactor core power levels not in excess of 3625.6 megawatts thermal (100 percent power) in accordance with the conditions specified herein.
(2) Technical Specifications and Environmental Protection Plan The Technical Specifications contained in Appendix A, as revised through Amendment NV. 132 and the Environmental Protection Plan contained in Appendix B, both of which are attached hereto, are hereby incorporated into this license. Southern Nuclear shall operate the facility in accordance with the Technical Specifications and the Environmental Protection Plan.
The Surveillance Requirements (SRs) contained in the Appendix A Technical Specifications and listed below are not required to be performed immediately upon implementation of Amendment No. 74. The SRs listed below shall be successfully' demonstrated prior to the time and condition specified below for each.-
a) DELETED b) DELETED c) SR 3.8.1.20 shall be successfully demonstrated at the first regularly scheduled performance after implementation of this license amendment.
(3) Southern Nuclear Operating Company shall be capable of establishing containment hydrogen monitoring within 90 minutes of initiating safety injection following a loss of coolant accident.
(4) Mitigation Strategy License Condition The licensee shall develop and maintain strategies for addressing large fires and explosions and that include the following key areas:
(a) Fire fighting response strategy with the following elements:
- 1. Pre-defined coordinated fire response strategy and guidance
- 2. Assessment of mdituarAld fire figlkting assets
- 3. Designated staging areas for equipment and materials
- 4. Command and control
- 5. Training of response personnel Amendment No. 132
ESFAS Instrumentation 3.3.2 Table 3.3.2-1 (page 6 of 7)
Engineered Safety Feature Actuation System Instrumentation APPLICABLE MODES OR OTHER NOMINAL SPECIFIED REQUIRED SURVEILLANCE ALLOWABLE TRIP FUNCTION CONDITIONS CHANNELS CONDITIONS REQUIREMENTS VALUE SETPOINT(i)
- 6. Auxiliary Feedwater (continued)
- c. Safety Injection Refer to Function 1 (Safety Injection) for all initiation functions and requirements.
- d. Trip of all Main 1 ,2 (g) 1 per pump J SR 3.3.2.6 NA NA Feedwater Pumps
- 7. Semi-automatic Switchover to Containment Sump
- a. Automatic 1 ,2,3, 4 (h) 2 C. SR 3.3.2.2 NA NA Actuation Logic SR 3.3.2.3 and Actuation SR 3.3.2.5 Relays
- b. Refueling 1,2,3,4 4 K SR 3.3.2.1 s 216.6 in. 213.5 in.
Water Storage SR 3.3.2.4 and Tank (RWST) SR 3.3.2.7 > 210.4 in.
Level-Low SR 3.3.2.8 Low(J)
Coincident with Refer to Function 1 (Safety Injection) for all initiation functions and requirements.
Safety Injection (continued)
(g) When the Main Feedwater System is operating to supply the SGs.
(h) In MODE 4, only 1 train is required to be OPERABLE to support semi-automatic switchover for the RHR pump that is required to be OPERABLE in accordance with Specification 3.5.3, ECCS-shutdown.
(i) A channel is OPERABLE with an actual Trip Setpoint value outside its calibration tolerance band provided the Trip Setpoint value is conservative with respect to its associated Allowable Value and the channel is readjusted to within the established calibration tolerance band of the Nominal Trip Setpoint. A Trip Setpoint may be set more conservative than the Nominal Trip Setpoint as necessary in response to plant conditions.
U) Two channels may be inoperable for a limited period of time during implementation of Amendments 1 5 l and 132 until four Required Channels have been adjusted for each unit. I Vogtle Units 1 and 2 3.3.2-14 Amendment No. 15 1 (Unit 1)
Amendment No. 132 (Unit 2)
RWST 3.5.4 ACTIONS (continued)
CONDITION REQUIRED ACTION COMPLETION TIME E. Required Action and E.1 Be in MODE 3. 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> associated Completion Time of Condition A or D AND not met.
E.2 Be in MODE 5. 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br /> SURVEILLANCE REQUIREMENTS
.. SURVEILLANCE ... . . .. .... I FREQUENCY ........
SR 3.5.4.1 --- NOTE Only required to be performed when ambient air temperature is < 40 0 F.
Verify RWST borated water temperature is 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />
> 44°F and : 116 0F.
SR 3.5.4.2 Verify RWST borated water volume is _>686,000 7 days I gallons.
SR 3.5.4.3 Verify RWST boron concentration is _>2400 ppm 7 days and 5 2600 ppm.
SR 3.5.4.4 Verify each sludge mixing pump isolation valve 18 months automatically closes on an actual or simulated RWST Low-Level signal.
Vogtle Units 1 and 2 3.5.4-2 Amendment No. 151(Unit 1)
Amendment No.132 (Unit 2)