Tech Spec Pages for Amendments 151 and 132 Regarding Revision to Technical Specification to Lower the Normal Trip Setpoint of the Refueling Water Storage Tank
ML080880198
Person / Time
Site: Vogtle  Southern Nuclear icon.png
Issue date: 07/07/2008
From:
NRC/NRR/ADRO/DORL/LPLII-1
To:
Lingam, Siva NRR/DORL 415-1564
Shared Package
ML080880179 List:
References
TAC MD7772, TAC MD7773
Download: ML080880198 (4)


Text

(2) Technical Specifications and Environmental Protection Plan The Technical S,,'"ifications contained in Appendix A, as revised through Amendment No.15,'and the Environmental Protection Plan contained in Appendix B, both of which-are attached hereto, are hereby incorporated into this license. Southern Nuclear shall operate the facility in accordance with the Technical Specifications and the Environmental Protection Plan.

(3) Southern Nuclear Operating Company shall be capable of establishing containment hydrogen monitoring within 90 minutes of initiating safety injection following a loss of coolant accident.

(4) DELETED (5) DELETED (6) DELETED (7) DELETED (8) DELETED (9) DELETED (10) Mitigation Strategy License Condition The licensee shall develop and maintain strategies for addressing large fires and explosions and that include the following key areas:

(a) Fire fighting response strategy with the following elements:

1. Pre-defined coordinated fire response strategy and guidance
2. Assessment of mutual aid fire fighting assets
3. Designated staging areas for equipment and materials
4. Command and control
5. Training of response personnel (b) Operations to mitigate fuel damage considering the following:

1.. Protection and use of personnel assets

2. Communications
3. Minimizing fire spread
4. Procedures for implementing integrated fire response strategy
5. Identification of readily-available pre-staged equipment
6. Training on integrated fire response strategy
7. Spent fuel pool mitigation measures (c) Actions to minimize release to include consideration of:

I. Water spray scrubbing

2. Dose to onsite responders Amendment No. 151

C. This license shall be deemed to contain and is subject to the conditions specified in the Commission's regulations set forth in 10 CFR Chapter I and'is subject to all applicable provisions of the Act and to the rules, regulations, and orders of the Commission now or hereafter in effect, and is subject to the additional conditions specified or incorporated below.

(1) Maximum Power Level Southern Nuclear is authorized to operate the facility at reactor core power levels not in excess of 3625.6 megawatts thermal (100 percent power) in accordance with the conditions specified herein.

(2) Technical Specifications and Environmental Protection Plan The Technical Specifications contained in Appendix A, as revised through Amendment NV. 132 and the Environmental Protection Plan contained in Appendix B, both of which are attached hereto, are hereby incorporated into this license. Southern Nuclear shall operate the facility in accordance with the Technical Specifications and the Environmental Protection Plan.

The Surveillance Requirements (SRs) contained in the Appendix A Technical Specifications and listed below are not required to be performed immediately upon implementation of Amendment No. 74. The SRs listed below shall be successfully' demonstrated prior to the time and condition specified below for each.-

a) DELETED b) DELETED c) SR 3.8.1.20 shall be successfully demonstrated at the first regularly scheduled performance after implementation of this license amendment.

(3) Southern Nuclear Operating Company shall be capable of establishing containment hydrogen monitoring within 90 minutes of initiating safety injection following a loss of coolant accident.

(4) Mitigation Strategy License Condition The licensee shall develop and maintain strategies for addressing large fires and explosions and that include the following key areas:

(a) Fire fighting response strategy with the following elements:

1. Pre-defined coordinated fire response strategy and guidance
2. Assessment of mdituarAld fire figlkting assets
3. Designated staging areas for equipment and materials
4. Command and control
5. Training of response personnel Amendment No. 132

ESFAS Instrumentation 3.3.2 Table 3.3.2-1 (page 6 of 7)

Engineered Safety Feature Actuation System Instrumentation APPLICABLE MODES OR OTHER NOMINAL SPECIFIED REQUIRED SURVEILLANCE ALLOWABLE TRIP FUNCTION CONDITIONS CHANNELS CONDITIONS REQUIREMENTS VALUE SETPOINT(i)

6. Auxiliary Feedwater (continued)
c. Safety Injection Refer to Function 1 (Safety Injection) for all initiation functions and requirements.
d. Trip of all Main 1 ,2 (g) 1 per pump J SR 3.3.2.6 NA NA Feedwater Pumps
7. Semi-automatic Switchover to Containment Sump
a. Automatic 1 ,2,3, 4 (h) 2 C. SR 3.3.2.2 NA NA Actuation Logic SR 3.3.2.3 and Actuation SR 3.3.2.5 Relays
b. Refueling 1,2,3,4 4 K SR 3.3.2.1 s 216.6 in. 213.5 in.

Water Storage SR 3.3.2.4 and Tank (RWST) SR 3.3.2.7 > 210.4 in.

Level-Low SR 3.3.2.8 Low(J)

Coincident with Refer to Function 1 (Safety Injection) for all initiation functions and requirements.

Safety Injection (continued)

(g) When the Main Feedwater System is operating to supply the SGs.

(h) In MODE 4, only 1 train is required to be OPERABLE to support semi-automatic switchover for the RHR pump that is required to be OPERABLE in accordance with Specification 3.5.3, ECCS-shutdown.

(i) A channel is OPERABLE with an actual Trip Setpoint value outside its calibration tolerance band provided the Trip Setpoint value is conservative with respect to its associated Allowable Value and the channel is readjusted to within the established calibration tolerance band of the Nominal Trip Setpoint. A Trip Setpoint may be set more conservative than the Nominal Trip Setpoint as necessary in response to plant conditions.

U) Two channels may be inoperable for a limited period of time during implementation of Amendments 1 5 l and 132 until four Required Channels have been adjusted for each unit. I Vogtle Units 1 and 2 3.3.2-14 Amendment No. 15 1 (Unit 1)

Amendment No. 132 (Unit 2)

RWST 3.5.4 ACTIONS (continued)

CONDITION REQUIRED ACTION COMPLETION TIME E. Required Action and E.1 Be in MODE 3. 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> associated Completion Time of Condition A or D AND not met.

E.2 Be in MODE 5. 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br /> SURVEILLANCE REQUIREMENTS

.. SURVEILLANCE ... . . .. .... I FREQUENCY ........

SR 3.5.4.1 --- NOTE Only required to be performed when ambient air temperature is < 40 0 F.

Verify RWST borated water temperature is 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />

> 44°F and : 116 0F.

SR 3.5.4.2 Verify RWST borated water volume is _>686,000 7 days I gallons.

SR 3.5.4.3 Verify RWST boron concentration is _>2400 ppm 7 days and 5 2600 ppm.

SR 3.5.4.4 Verify each sludge mixing pump isolation valve 18 months automatically closes on an actual or simulated RWST Low-Level signal.

Vogtle Units 1 and 2 3.5.4-2 Amendment No. 151(Unit 1)