April 2, 2008 LICENSEE: Entergy Nuclear Operations, Inc.
FACILITY: Indian Point Nuclear Generating Unit Nos. 2 and 3
SUBJECT:
SUMMARY
OF TELEPHONE CONFERENCE CALL HELD ON MARCH 7, 2008, BETWEEN THE U.S. NUCLEAR REGULATORY COMMISSION AND ENTERGY NUCLEAR OPERATIONS, INC., CONCERNING RESPONSES TO REQUEST FOR ADDITIONAL INFORMATION RELATED TO THE INDIAN POINT NUCLEAR GENERATING UNIT NOS. 2 AND 3, LICENSE RENEWAL APPLICATION -
CONTAINMENT INSERVICE INSPECTION, BORAFLEX, AND STRUCTURES The U.S. Nuclear Regulatory Commission (NRC or the staff) and representatives of Entergy Nuclear Operations Inc., held a telephone conference call on March 7, 2008, to obtain clarification on Entergys response to a request for additional information (RAI) regarding the Indian Point license renewal application (LRA). By letter dated January 4, 2008, Entergy submitted its response to the RAI regarding containment in-service inspection and main feedwater system, and by letter dated February 27, 2008, its response to the RAI regarding structures. The staff reviewed the information contained therein, and requested additional information/clarification on a few items. provides a listing of the participants, and Enclosure 2 contains a listing of the items discussed with the applicant, including a brief description of the resolution of the items.
The applicant had an opportunity to comment on this summary.
/RA/
Kimberly Green, Safety Project Manager Projects Branch 2 Division of License Renewal Office of Nuclear Reactor Regulation Docket Nos. 50-247 and 50-286
Enclosures:
As stated cc w/encls: See next page
ML080840568 OFFICE LA:DLR PM:RPB2:DLR BC:RPB2:DLR NAME SFigueroa KGreen RFranovich w/comments DATE 03/26/08 04/02/08 04/02/08
TELEPHONE CONFERENCE CALL INDIAN POINT NUCLEAR GENERATING UNIT NOS. 2 AND 3 LICENSE RENEWAL APPLICATION LIST OF PARTICIPANTS MARCH 7, 2008 PARTICIPANTS AFFILIATIONS Kim Green U.S. Nuclear Regulatory Commission (NRC)
John Burke NRC Emma Wong NRC Steve Jones NRC Stan Gardocki NRC Mike Stroud Entergy Nuclear Operations, Inc. (Entergy)
Don Fronabarger Entergy Reza Ahrabli Entergy Alan Cox Entergy ENCLOSURE 1
CLARIFICATION ON RESPONSES TO REQUEST FOR ADDITIONAL INFORMATION INDIAN POINT NUCLEAR GENERATING UNIT NOS. 2 AND 3 LICENSE RENEWAL APPLICATION March 7, 2008 The U.S. Nuclear Regulatory Commission (NRC or the staff) and representatives of Entergy Nuclear Operations, Inc. held a telephone conference call on March 7, 2008, to discuss and clarify the following responses to a request for additional information (RAI) concerning the Indian Point Nuclear Generating Unit Nos. 2 and 3 license renewal application (LRA).
By letter dated December 7, 2007, the staff requested additional information regarding the Containment Inservice Inspection program and the main feedwater system, among other items.
By letter dated January 4, 2008, Entergy responded to the staffs RAI. By letter dated January 28, 2008, the staff requested additional information regarding certain structures, among other items. By letter dated February 27, 2008, Entergy responded to the staffs RAI.
Upon review of the information contained in Entergys response letters, the staff determined that additional clarification was warranted. The items requiring clarification are discussed below.
- 1. In response to RAI B.1.8-1, Entergy uses the term normally inaccessible. The staff asked for clarification on the term normally inaccessible.
Applicants clarification:
Entergy stated that normally inaccessible means that removal of a barrier would be required in order to perform remote visual inspections.
- 2. In response to RAI 2.4.3-1, the applicant states that components of the fuel storage building perform a component-level license renewal intended function if they are required to maintain pool water inventory. The staff does not believe that this function aligns with the commodity group intended functions listed in LRA Table 3.5.2-3 for commodities that would be in the fuel storage building. The staff asked the applicant to clarify the intended function of the fuel storage building.
Applicants clarification:
Entergy stated that it understood the staffs request, and indicated that in the next LRA amendment, it will clarify the response.
- 3. In response to RAI 3.5A.2-1, Entergy states that the Unit 2 spent fuel pool does not have leak chase channels and therefore, no monitoring of leak chase channels can be performed for Unit 2. The monitoring of the spent fuel pool water level is credited along with the Water Chemistry Control - Primary and Secondary Program for managing the effects of aging on the Unit 2 spent fuel pool liner. The staff believes that the absence of leak chase channels is inconsistent with GALL, and therefore, Entergy should propose an equivalent monitoring and explain why the equivalent is acceptable.
ENCLOSURE 1
Applicants clarification:
Entergy stated that the original RAI asked about the liner, and not what are the long-term effects of borated water leakage on concrete. This would be a different RAI. Entergy stated that it will be sending a letter that would docket the question and answer database, and that its answer to audit item #360 might address the staffs concern with respect to the spent fuel pool. If the staff finds that the answer does not address its concern, the staff will send a new (reworded) RAI.
- 4. In response to RAIs 2.3A.4.2-1 and 2.3B.4.2-1, Entergy stated that the feedwater system valves, which are located upstream of the containment isolation check valves in nonsafety-related piping, are classified as safety-related because of their active function to provide feedwater isolation. They have no passive intended function for 54.4(a)(1) or (a)(3) since their failure would accomplish the safety function of preventing feedwater flow to the steam generators. The staff does not accept the use of the terms active and passive with respect to intended function. 10 CFR 54.4 does not include the use of these terms for the purposes of the scoping.
Applicants clarification:
Entergy indicated that it understood the staffs concern, and that it would clarify the response in the next LRA amendment.
During further review of the LRA and UFSAR, the staff identified the need for additional information. During the telephone call, the staff briefly discussed the issue with the applicant.
In Section 14.2.1 of the Indian Point 2 UFSAR, it states that projections for the boraflex absorbers are valid through the end of the year 2006. The staff asked Entergy if it has current projections. Entergy stated that it does have current projections. The staff stated that it will send a formal RAI requesting the information.
Letter to Entergy from K. Green, dated April 2, 2008 DISTRIBUTION:
SUBJECT:
SUMMARY
OF TELEPHONE CONFERENCE CALL HELD ON MARCH 7, 2008, BETWEEN THE U.S. NUCLEAR REGULATORY COMMISSION AND ENTERGY NUCLEAR OPERATIONS, INC., CONCERNING RESPONSES TO REQUEST FOR ADDITIONAL INFORMATION RELATED TO THE INDIAN POINT NUCLEAR GENERATING UNIT NOS. 2 AND 3, LICENSE RENEWAL APPLICATION - CONTAINMENT INSERVICE INSPECTION, BORAFLEX, AND STRUCTURES HARD COPY:
DLR RF E-MAIL:
PUBLIC RidsNrrDlr RidsNrrDlrRpb1 RidsNrrDlrRpb2 RidsNrrDlrRer1 RidsNrrDlrRer2 RidsNrrDlrRerb RidsNrrDlrRpob RidsNrrDciCvib RidsNrrDciCpnb RidsNrrDraAfpb RidsNrrDraAplb RidsNrrDeEmcb RidsNrrDeEeeb RidsNrrDssSrxb RidsNrrDssSbpb RidsNrrDssScvb RidsOgcMailCenter
RFranovich EDacus, OCA BPham GMeyer, RI KGreen MMcLaughlin, RI JCaverly NMcNamara, RI RAuluck DScrenci, RI OPA KChang NSheehan, RI OPA MKowal PCataldo, RI JBoska CHott, RI STurk, OGC DJackson, RI LSubin, OGC BWelling, RI BMizuno, OGC RConte, RI SBurnell, OPA ECobey, RI DMcIntyre, OPA MCox, RI TMensah, OEDO
Indian Point Nuclear Generating Units 2 and 3 cc:
Senior Vice President Mr. Paul Eddy Entergy Nuclear Operations, Inc. New York State Department P.O. Box 31995 of Public Service Jackson, MS 39286-1995 3 Empire State Plaza Albany, NY 12223-1350 Vice President Oversight Entergy Nuclear Operations, Inc. Regional Administrator, Region I P.O. Box 31995 U.S. Nuclear Regulatory Commission Jackson, MS 39286-1995 475 Allendale Road King of Prussia, PA 19406 Senior Manager, Nuclear Safety &
Licensing Senior Resident Inspectors Office Entergy Nuclear Operations, Inc. Indian Point 2 P.O. Box 31995 U.S. Nuclear Regulatory Commission Jackson, MS 39286-1995 P.O. Box 59 Buchanan, NY 10511 Senior Vice President and COO Entergy Nuclear Operations, Inc. Senior Resident Inspectors Office 440 Hamilton Avenue Indian Point 3 White Plains, NY 10601 U.S. Nuclear Regulatory Commission P.O. Box 59 Assistant General Counsel Buchanan, NY 10511 Entergy Nuclear Operations, Inc.
440 Hamilton Avenue Mr. Charles Donaldson, Esquire White Plains, NY 10601 Assistant Attorney General New York Department of Law Manager, Licensing 120 Broadway Entergy Nuclear Operations, Inc. New York, NY 10271 Indian Point Energy Center 450 Broadway, GSB Mr. Raymond L. Albanese P.O. Box 249 Four County Coordinator Buchanan, NY 10511-0249 200 Bradhurst Avenue Unit 4 Westchester County Mr. Paul D. Tonko Hawthorne, NY 10532 President and CEO New York State Energy Research and Mayor, Village of Buchanan Development Authority 236 Tate Avenue 17 Columbia Circle Buchanan, NY 10511 Albany, NY 12203-6399 Mr. William DiProfio Mr. John P. Spath PWR SRC Consultant New York State Energy, Research and 48 Bear Hill Road Development Authority Newton, NH 03858 17 Columbia Circle Albany, NY 12203-6399
Indian Point Nuclear Generating Units 2 and 3 cc:
Mr. Garry Randolph Robert Snook PWR SRC Consultant Assistant Attorney General 1750 Ben Franklin Drive, 7E Office of the Attorney General Sarasota, FL 34236 State of Connecticut 55 Elm Street Mr. William T. Russell P.O. Box 120 PWR SRC Consultant Hartford, CT 06141-0120 400 Plantation Lane Stevensville, MD 21666-3232 Ms. Kathryn M. Sutton, Esq.
Morgan, Lewis & Bockius, LLP Mr. Jim Riccio 1111 Pennsylvania Avenue, NW Greenpeace Washington, DC 20004 702 H Street, NW Suite 300 Mr. Paul M. Bessette, Esq.
Washington, DC 20001 Morgan, Lewis & Bockius, LLP 1111 Pennsylvania Avenue, NW Mr. Phillip Musegaas Washington, DC 20004 Riverkeeper, Inc.
828 South Broadway Mr. Martin J. ONeill, Esq.
Tarrytown, NY 10591 Morgan, Lewis & Bockius, LLP 1111 Pennsylvania Avenue, NW Mr. Mark Jacobs Washington, DC 20004 IPSEC 46 Highland Drive The Honorable Nita Lowey Garrison, NY 10524 222 Mamaroneck Avenue, Suite 310 White Plains, NY 10605 Mr. R. M. Waters Technical Specialist Licensing Joan Leary Matthews 450 Broadway Senior Counsel for Special Projects P.O. Box 0249 Office of General Counsel Buchanan, NY 10511-0249 NYS Department of Environmental Conservation Mr. Sherwood Martinelli 625 Broadway 351 Dyckman Albany, NY 12233-5500 Peekskill, NY 10566 Ms. Susan Shapiro, Esq.
21 Perlman Drive Spring Valley, NY 10977 John Sipos Assistant Attorney General New York State Department of Law Environmental Protection Bureau The Capitol Albany, NY 12224