ML080840023

From kanterella
Jump to navigation Jump to search

Tech Spec Pages for Amendment No. 276, Revise Technical Specification 6.6.5, Core Operating Limits Report, to Add Analytical Methods to Support Implementation of Next Generation Fuel
ML080840023
Person / Time
Site: Arkansas Nuclear Entergy icon.png
Issue date: 03/26/2008
From:
NRC/NRR/ADRO/DORL/LPLIV
To:
Wang, A B, NRR/DORL/LPLIV, 415-1445
Shared Package
ML080840014 List:
References
TAC MD6220, TAC MD6268
Download: ML080840023 (4)


Text

3 (4) EOI, pursuant to the Act and 10 CFR Parts 30, 40 and 70 to receive, possess and use at any time any byproduct, source and special nuclear material as sealed neutron sources for reactor startup, sealed sources for reactor instrumentation and radiation monitoring equipment calibration, and as fission detectors in amounts as required; (5) EOI, pursuant to the Act and 10 CFR Parts 30, 40 and 70, to receive, possess, and use in amounts as required any byproduct, source or special nuclear material without restriction to chemical or physical form, for sample analysis or instrument calibration or associated with radioactive apparatus or components; and (6) EOI, pursuant to the Act and 10 CFR Parts 30 and 70, to possess, but not separate, such byproduct and special nuclear materials as may be produced by the operation of the facility.

C. This renewed license shall be deemed to contain and is subject to conditions specified in the following Commission regulations in 10 CFR Chapter 1; Part 20, Section 30.34 of Part 30, Section 40.41 of Part 40, Sections 50.54 and 50.59 of Part 50, and Section 70.32 of Part 70; and is subject to all applicable provisions of the Act and to the rules, regulations, and orders of the Commission now or hereafter in effect; and is subject to the additional conditions specified or incorporated below:

(1) Maximum Power Level EOI is authorized to operate the facility at steady state reactor core power levels not in excess of 3026 megawatts thermal. Prior to attaining this power level EOI shall comply with the conditions in Paragraph 2.C.(3).

(2) Technical Specifications The Technical Specifications contained in Appendix A, as revised through Amendment No. 276 are hereby incorporated in the renewed license. The licensee shall operate the facility in accordance with the Technical Specifications.

Exemptive 2nd paragraph of 2.C.2 deleted per Amendment 20, 3/3/81.

(3) Additional Conditions The matters specified in the following conditions shall be completed to the satisfaction of the Commission within the stated time periods following issuance of the renewed license or within the operational restrictions indicated.

The removal of these conditions shall be made by an amendment to the renewed license supported by a favorable evaluation by the Commission.

2.C.(3)(a) Deleted per Amendment 24, 6/19/81.

Renewed License No. NPF-6 Amendment No. 276 Revised by letter dated July 18, 2007

ADMINISTRATIVE CONTROLS 6.6 REPORTING REQUIREMENTS 6.6.1 DELETED 6.6.2 Annual Radiological Environmental Operating Report (Note: A single submittal may be made for ANO. The submittal should combine sections common to both units.)

The Annual Radiological Environmental Operating Report covering the operation of the unit during the previous calendar year shall be submitted by May 15 of each year. The report shall include summaries, interpretations, and analyses of trends of the results of the radiological environmental monitoring program for the reporting period. The material provided shall be consistent with the objectives outlined in the Offsite Dose Calculation Manual (ODCM), and in 10 CFR 50, Appendix I, Sections IV.B.2, IV.B.3, and IV.C.

The Annual Radiological Environmental Operating Report shall include the results of analyses of all radiological environmental samples and of all environmental radiation measurements taken during the period pursuant to the locations specified in the table and figures in the ODCM, as well as summarized and tabulated results of these analyses and measurements. In the event that some individual results are not available for inclusion with the report, the report shall be submitted noting and explaining the reasons for the missing results. The missing data shall be submitted in a supplementary report as soon as possible.

6.6.3 Radioactive Effluent Release Report (Note: A single submittal may be made for ANO. The submittal shall combine sections common to both units. The submittal shall specify the releases of radioactive material from each unit.)

The Radioactive Effluent Release Report covering the operation of the unit in the previous year shall be submitted prior to May 1 of each year in accordance with 10 CFR 50.36a. The report shall include a summary of the quantities of radioactive liquid and gaseous effluents and solid waste released from the unit. The material provided shall be consistent with the objectives outlined in the ODCM and Process Control Program and in conformance with 10 CFR 50.36a and 10 CFR 50, Appendix I, Section IV.B.1.

6.6.4 DELETED ARKANSAS - UNIT 2 6-19 Amendment No. 255,259, 276

ADMINISTRATIVE CONTROLS 6.6.5 CORE OPERATING LIMITS REPORT (COLR)

a. Core operating limits shall be established prior to each reload cycle, or prior to any remaining part of a reload cycle, and shall be documented in the COLR for the following:

3.1.1.1 Shutdown Margin - Tavg > 200qF 3.1.1.2 Shutdown Margin - Tavg d 200qF 3.1.1.4 Moderator Temperature Coefficient 3.1.3.1 CEA Position 3.1.3.6 Regulating and Group P CEA Insertion Limits 3.2.1 Linear Heat Rate 3.2.3 Azimuthal Power - Tq 3.2.4 DNBR Margin 3.2.7 Axial Shape Index

b. The analytical methods used to determine the core operating limits shall be those previously reviewed and approved by the NRC, specifically those described in the following documents:
1) Qualification of the PHOENIX-P/ANC Nuclear Design System for Pressurized Water Reactor Cores (WCAP-11596-P-A), ANC: A Westinghouse Advanced Nodal Computer Code (WCAP-10965-P-A), and ANC: A Westinghouse Advanced Nodal Computer Code: Enhancements to ANC Rod Power Recovery (WCAP-10965-P-A Addendum 1)

(Methodology for Specifications 3.1.1.1 and 3.1.1.2 for Shutdown Margins, 3.1.1.4 for MTC, 3.1.3.6 for Regulating and Group P CEA Insertion Limits, and 3.2.4.b for DNBR Margin).

2) "CE Method for Control Element Assembly Ejection Analysis,"

CENPD-0190-A (Methodology for Specification 3.1.3.6 for Regulating and Group P CEA Insertion Limits and 3.2.3 for Azimuthal Power Tilt).

3) "Modified Statistical Combination of Uncertainties, CEN-356(V)-P-A, Revision 01-P-A (Methodology for Specification 3.2.4.c and 3.2.4.d for DNBR Margin and 3.2.7 for ASI).
4) "Calculative Methods for the CE Large Break LOCA Evaluation Model,"

CENPD-132-P (Methodology for Specification 3.1.1.4 for MTC, 3.2.1 for Linear Heat Rate, 3.2.3 for Azimuthal Power Tilt, and 3.2.7 for ASI).

5) "Calculative Methods for the CE Small Break LOCA Evaluation Model,"

CENPD-137-P (Methodology for Specification 3.1.1.4 for MTC, 3.2.1 for Linear Heat Rate, 3.2.3 for Azimuthal Power Tilt, and 3.2.7 for ASI).

6) "CESEC-Digital Simulation of a Combustion Engineering Nuclear Steam Supply System" (Methodology for Specifications 3.1.1.1 and 3.1.1.2 for Shutdown Margin, 3.1.1.4 for MTC, 3.1.3.1 for CEA Position, 3.1.3.6 for Regulating CEA and Group P Insertion Limits, and 3.2.4.b for DNBR Margin).

ARKANSAS - UNIT 2 6-20 Amendment No. 255,257,259, 276

ADMINISTRATIVE CONTROLS 6.6.5 CORE OPERATING LIMITS REPORT (COLR) (Continued)

7) Technical Manual for the CENTS Code, CENPD 282-P-A (Methodology for Specifications 3.1.1.1 and 3.1.1.2 for Shutdown Margin, 3.1.1.4 for MTC, 3.1.3.1 for CEA Position, 3.1.3.6 for Regulating and Group P Insertion Limits, and 3.2.4.b for DNBR Margin.
8) Implementation of ZIRLO Material Cladding in CE Nuclear Power Fuel Assembly Designs, CENPD-404-P-A (modifies CENPD-132-P and CENPD-137-P as methodology for Specification 3.1.1.4 for MTC, 3.2.1 for Linear Heat Rate, 3.2.3 for Azimuthal Power Tilt, and 3.2.7 for ASI).
9) Qualification of the Two-Dimensional Transport Code PARAGON, WCAP-16045-P-A (may be used as a replacement for the PHOENIX-P lattice code as the methodology for Specifications 3.1.1.1 and 3.1.1.2 for Shutdown Margins, 3.1.1.4 for MTC, 3.1.3.6 for Regulating and Group P CEA Insertion Limits, and 3.2.4.b for DNBR Margin).
10) Implementation of Zirconium Diboride Burnable Absorber Coatings in CE Nuclear Power Fuel Assembly Designs, WCAP-16072-P-A (Methodology for Specification 3.1.1.4 for MTC, 3.2.1 for Linear Heat Rate, 3.2.3 for Azimuthal Tilt, and 3.2.7 for ASI).
11) CE 16 x 16 Next Generation Fuel Core Reference Report, WCAP-16500-P-A (Methodology for Specification 3.1.1.4 for MTC, 3.2.1 for Linear Heat Rate, 3.2.3 for Azimuthal Power Tilt, 3.2.4.b, 3.2.4.c and 3.2.4.d for DNBR Margin, and 3.2.7 for ASI).
12) Optimized ZIRLOTM, WCAP-12610-P-A and CENPD-404-P-A Addendum 1-A (Methodology for Specification 3.1.1.4 for MTC, 3.2.1 for Linear Heat Rate, 3.2.3 for Azimuthal Power Tilt, and 3.2.7 for ASI).
13) Westinghouse Correlations WSSV and WSSV-T for Predicting Critical Heat Flux in Rod Bundles with Side-Supported Mixing Vanes, WCAP-16523-P-A (Methodology for Specification 3.2.4.b, 3.2.4.c and 3.2.4.d for DNBR Margin).
14) ABB Critical Heat Flux Correlations for PWR Fuel, CENPD-387-P-A (Methodology for Specification 3.2.4.b, 3.2.4.c and 3.2.4.d for DNBR Margin and 3.2.7 for ASI).
15) Calculative Methods for the CE Nuclear Power Large Break LOCA Evaluation Model - Improvement to 1999 Large Break LOCA EM Steam Cooling Model for Less Than 1 in/sec Core Reflood, CENPD-132, Supplement 4-P-A, Addendum 1-P-A (Methodology for Specification 3.1.1.4 for MTC, 3.2.1 for Linear Heat Rate, 3.2.3 for Azimuthal Power Tilt, and 3.2.7 for ASI).
c. The core operating limits shall be determined such that all applicable limits (e.g.

fuel thermal mechanical limits, core thermal hydraulic limits, Emergency Core Cooling System (ECCS) limits, nuclear limits such as SDM, transient analysis limits, and accident analysis limits) of the safety analysis are met.

d. The COLR, including any midcycle revisions or supplements, shall be provided upon issuance for each reload cycle to the NRC.

ARKANSAS - UNIT 2 6-21 Amendment No. 255,257, 276