ML080730486
From kanterella
Jump to navigation
Jump to search
ML080730486 | |
Person / Time | |
---|---|
Site: | Palo Verde |
Issue date: | 08/05/2003 |
From: | Tilford R - No Known Affiliation |
To: | Mccain J NRC/EDO, NRC/OCM, NRC/SECY, US SEN (Senate) |
References | |
FOIA/PA-2008-0118, G20030485, LTR-03-0531 | |
Download: ML080730486 (7) | |
Similar Documents at Palo Verde | |
---|---|
Category:Letter
MONTHYEARML24295A0362024-10-23023 October 2024
[Table view]Regulatory Audit Plan in Support of Relief Request No. 71; Resubmittal of Relief Request-30 IR 05000528/20244022024-10-22022 October 2024 Security Baseline Inspection Report 05000528/2024402 and 05000529/2024402 and 05000530/2024402 ML24296B2142024-10-22022 October 2024 Transmittal of Valve Relief Request (VRR) - 02: Alternative Request Allowing Normally Closed Valves with a Safety Function to Close to Be Exercise Tested Once Per Refueling Cycle ML24296B2152024-10-22022 October 2024 Transmittal of Valve Relief Request (VRR) - 03: Alternative Request Allowing Removal of the Lower Acceptance Criteria Threshold from Solenoid-Operated Valves ML24296B2172024-10-18018 October 2024 Submittal of Unit 1 Core Operating Limits Report, Revision 34, Unit 2 Core Operating Limits Report, Revision 26, and Unit 3 Core Operating Limits Report, Revision 3 ML24292A2192024-10-18018 October 2024 Core Operating Limits Report Revision 34, 26 and 33 ML24292A0322024-10-17017 October 2024 Th Refueling Outage Steam Generator Tube Inspection Report ML24285A2562024-10-11011 October 2024 License Renewal - Alloy 600 Management Program Plan Response to Request for Additional Information IR 07200044/20244012024-10-0808 October 2024 Independent Spent Fuel Storage Installation Security Inspection Report 07200044/2024401 ML24269A1542024-09-27027 September 2024 Summary of Presubmittal Meeting with Arizona Public Service Company to Discuss Proposed Life-of-Plant Alternatives for a Pressurizer Thermowell Nozzle Repair at Palo Verde Nuclear Generating Station, Unit 1 ML24262A0972024-09-23023 September 2024 Notification of Post-Approval Site Inspection for License Renewal and Request for Information Inspection (05000529/2024011) ML24241A2542024-08-28028 August 2024 Inservice Inspection Request for Information ML24241A2782024-08-28028 August 2024 License Amendment Request to Revise the Technical Specifications 3.5.1 and 3.5.2 Safety Injection Tank Pressure Bands, and to Use GOTHIC Code ML24240A2682024-08-27027 August 2024 Transmittal of Technical Specification Bases Revision 79 IR 05000528/20240052024-08-22022 August 2024 Updated Inspection Plan for Palo Verde Nuclear Generating Station - Units 1, 2, and 3 (Report 05000528/2024005, 05000529/2024005, 05000530/2024005) 05000530/LER-2024-001-01, Inoperable Boron Dilution Alarm System(Bdas) with Technical Specification Violation2024-08-21021 August 2024 Inoperable Boron Dilution Alarm System(Bdas) with Technical Specification Violation ML24208A0612024-08-20020 August 2024 Issuance of Amendment Nos. 224, 224, and 224 Regarding Revision to Technical Specifications 3.5.1, 3.5.2 and 3.6.5 IR 05000528/20244042024-08-0808 August 2024 Cybersecurity Inspection Report 05000528/2024404, 05000529/2024404 and 05000530/2024404 ML24213A3232024-07-31031 July 2024 Transmittal of Relief Request (RR) No. 71: Re-Submittal of RR-30 ML24213A3292024-07-31031 July 2024 Transmittal of Relief Request (RR) No. 72: Re-Submittal of RR-39 IR 05000528/20240022024-07-29029 July 2024 Integrated Inspection Report 05000528/2024002 and 05000529/2024002 and 05000530/2024002 ML24173A3302024-07-24024 July 2024 Pressurizer Surge Line Inspection Program ML24159A4702024-07-17017 July 2024 Issuance of Amendment Nos. 223, 223, and 223 Revision to Technical Specifications 3.5.1 and 3.5.2 Using Risk Informed Process for Evaluations ML24198A0662024-07-16016 July 2024 Program Review - Simulator Testing Methodology ML24193A3442024-07-11011 July 2024 Fourth 10-Year Interval, Second Period Owner’S Activity Report Number 3R24 ML24129A0522024-07-0303 July 2024 Review of the Spring 2023 Steam Generator Tube Inspection Report IR 05000528/20240042024-06-25025 June 2024 Notification of Inspection (NRC Inspection Report 05000528/2024004, 05000529/2024004, 05000530/2024004) 05000530/LER-2024-002, Invalid Specified System Actuation of Train B Emergency Diesel Generator2024-06-25025 June 2024 Invalid Specified System Actuation of Train B Emergency Diesel Generator ML24177A3212024-06-25025 June 2024 Independent Spent Fuel Storage Installation, Registration of Dry Spent Fuel Transportable Storage Canisters Identification Numbers AMZDFX180, AMZDFX181, AMZDFX182 Vertical Concrete Cask Identification Nu ML24177A3222024-06-25025 June 2024 Invalid Specified System Actuation of Train B Emergency Diesel Generator ML24170A9962024-06-18018 June 2024 Response to Second Request for Additional Information to Revise Technical Specifications (TS) 3.5.1, Safety Injection Tanks (Sits) – Operating, TS 3.5.2, Safety Injection Tanks (Sits) – Shutdown a ML24129A2062024-06-14014 June 2024 Issuance of Amendment Nos. 222, 222, and 222 Revision to Technical Specifications to Adopt TSTF-266-A 05000530/LER-2024-001, Inoperable Boron Dilution Alarm System(Bdas) with Technical Specification Violation2024-06-0505 June 2024 Inoperable Boron Dilution Alarm System(Bdas) with Technical Specification Violation ML24159A0262024-06-0303 June 2024 Annual Report of Guarantee of Payment of Deferred Premium 05000529/LER-2024-001, Valid Specified System Actuations of Unit 2 Train B Emergency Diesel Generator and Train B Auxiliary Feedwater2024-05-23023 May 2024 Valid Specified System Actuations of Unit 2 Train B Emergency Diesel Generator and Train B Auxiliary Feedwater ML24135A2482024-05-14014 May 2024 Response to Second Request for Additional Information to Proposed Method to Manage Environmentally Assisted Fatigue for the Pressurizer Surge Line ML24164A2582024-05-0909 May 2024 10-PV-2024-04 Post-Exam Comments ML24129A1482024-05-0707 May 2024 And Independent Spent Fuel Storage Installation Registration of Dry Spent Fuel Storage Casks with Applied Changes ML24128A2702024-05-0707 May 2024 Docket Nos. Stn 50-528/529/530 - Response to NRC Regulatory Issue Summary (RIS) 2024-01, Preparation and Scheduling of Operator Licensing Examinations IR 05000528/20240012024-05-0202 May 2024 Independent Spent Fuel Storage Installation, Integrated Inspection Report 05000528/2024001, 05000529/2024001, 05000530/2024001, 07200044/2024001, and Exercise of Enforcement Discretion ML24119A0022024-04-26026 April 2024 2023 Annual Environmental Operating Report ML24116A2082024-04-24024 April 2024 Independent Spent Fuel Storage Installation, Annual Radioactive Effluent Release Report 2023 ML24109A0712024-04-22022 April 2024 NRC Initial Operator Licensing Examination Approval 05000528/2024301, 05000529/2024301, and 05000530/2024301 IR 05000528/20244012024-04-22022 April 2024 Security Baseline Inspection Report 05000528/2024401 and 05000529/2024401 and 05000530/2024401 (Cover Letter) ML24112A0012024-04-19019 April 2024 Core Operating Limits Report, Revision 32 ML24108A1982024-04-16016 April 2024 Independent Spent Fuel Storage Installation - Registration of Dry Spent Fuel Storage Casks with Applied Changes Authorized by an Amended Certificate of Compliance ML24103A2482024-04-12012 April 2024 Emergency Core Cooling System Performance Evaluation Models, 10 CFR 50.46(a)(3)(ii) Annual Report for 2023 ML24131A0972024-04-10010 April 2024 Annual Radiological Environmental Operating Report 2023 ML24096A2202024-04-0505 April 2024 Transmittal of Technical Specification Bases Revision 78 ML24032A1542024-04-0303 April 2024 Exemption from Select Requirements of 10 CFR Part 73 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting) 2024-09-27 Category:Congressional Correspondence MONTHYEARML20084L1502020-03-18018 March 2020
[Table view]03-18-20 Letter to Senator Jeffrey Merkley, Et Al., from NRC Secretary Annette Vietti-Cook Re Palo Verde Lt NRC-2018-0214, LTR-20-0091 Senator Jeffrey Merkley, Et Al., Letter Request for an Evidentiary Hearing with the NRC in Relation to the Acquisition of El Paso Electric by the Infrastructure Investments Fund Us Holding 22020-03-10010 March 2020 LTR-20-0091 Senator Jeffrey Merkley, Et Al., Letter Request for an Evidentiary Hearing with the NRC in Relation to the Acquisition of El Paso Electric by the Infrastructure Investments Fund Us Holding 2 ML19350A5442019-12-0909 December 2019 12-09-19 Letter to Congresswoman Escobar from Annette Vietti-Cook Regarding the Application by El Paso Electric Company for Transfer of Its Palo Verde Nuclear Generating Station and Independent Spent Fuel Storage Installation Licenses ML19330E9682019-11-26026 November 2019 LTR-19-0460 Acknowledgement Letter to Representative Escobar Indirect Transfer of Control of Licenses to Sun Jupiter Holdings ML0717302802007-06-26026 June 2007 G20070420/LTR-07-0414/EDATS: SECY-2007-0203 - Sen. Richard G. Lugar Ltr. Security at Nuclear Plants - Palo Verde ML0716602822007-06-0404 June 2007 G20070420/LTR-07-0414/EDATS: SECY-2007-0203 - Ltr. Sen. Richard G. Lugar Security at Nuclear Plants - Palo Verde ML0713703632007-05-0707 May 2007 G20070343/LTR-07-0348/EDATS:SECY-2007-0145 - Ltr. Rep. John Shadegg Re Unauthorized Access to Palo Verde Related Data ML0600605712006-01-24024 January 2006 G20050884/LTR-05-0613 - Sen. Jon Kyl Ltr Re. Concerns West Valley Facility - Palo Verde (Dan Frenette) ML0531300772005-11-22022 November 2005 G20050739/LTR-05-0519 - Rep.Trent Franks Ltr. Re. Palo Verde Nuclear Generating Station ML0532700742005-11-13013 November 2005 G20050802/LTR-05-0570 - John Mccain Ltr Palo Verde Nuclear Generating Station - Recent Shutdown ML0536202132005-11-0303 November 2005 G20050884/LTR-05-0613 - Incoming Letter from Sen. Jon Kyl Concerns West Valley Facility - Palo Verde (Dan Frenette) ML0530004242005-10-17017 October 2005 G20050739/LTR-05-0519 - Incoming LTR - Rep. Trent Franks Palo Verde Nuclear Generating Station ML0513103772005-04-29029 April 2005 End-of-Cycle Public Meeting Invitation Letter for Palo Verde ML0508705172005-03-0202 March 2005 G20050210/LTR-05-0153 - Ltr. Sen. John Mccain Re Constituent'S Concerns Regarding Water Contamination at Palo Verdi Nuclear Power Plant ML0806602012004-08-11011 August 2004 Letter to Honorable Jon Mccain Regarding Palo Verde Nuclear Station and Constituent Seth Campbell ML0915507602003-08-0505 August 2003 Letter to Mccain, Palo Verde Nuclear Power Plant (1 Page) Attaching 8/4/03 Letter to Mccain (1 Page), 8/3/03 Arizona Republic Article, A-plant Unit Down After Outage Will Resume Operation Monday (1 Page) Copyright, Fax Cover Sheet to Angel ML0807304862003-08-0505 August 2003 G20030485/LTR-03-0531 - Ltr. Robert Titlford Palo Verdo Outage ML0235701542002-12-12012 December 2002 Comment (15) Submitted by Rep. Bruce Smith on Petition for Rulemaking PRM 50-79 Re Protection for Day Care Centers and Nursery Schools in Radiological Emergency 2020-03-18 |
Text
Retrieved from "https://kanterella.com/w/index.php?title=ML080730486&oldid=2657592"