Transmittal of Waterford, Unit 3, Supplemental Response to NRC Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors
ML080650614
Person / Time
Site: Waterford Entergy icon.png
Issue date: 02/29/2008
From: Cook K
Entergy Nuclear South, Entergy Operations
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
GL-04-002, W3F1-2008-0018
Download: ML080650614 (3)


Text

Entergy Nuclear South Entergy Operations Inc.

17265 River Road Killona, LA 70057 Tel 504 739 6247 Fax 504 739 6698 kcook@entergy.corn Kimberly S. Cook Director, Nuclear Safety Assurance Nuclear Safety Assurance Waterford 3 Attachment I Contains 10CFR2.390 Proprietary Information W3F1 -2008-0018 February 29, 2008 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555-0001

Subject:

Supplemental Response to NRC Generic Letter 2004-02 "Potential Impact of Debris Blockage on Emergency Recirculation during Design Basis Accidents at Pressurized-Water Reactors" Waterford Steam Electric Station, Unit 3 (Waterford 3)

Docket No. 50-382 License No. NPF-38

Dear Sir or Madam:

The purpose of this letter is to provide Entergy's supplemental response to Generic Letter 2004-02, "Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors (PWRs)," dated September 13, 2004 for Waterford 3 (W-3) per NRC letter to NEI dated November 30, 2007. The NRC letter to NEI authorized licensees up to two months beyond December 31, 2007 to provide the supplemental responses.

This submittal has been prepared per the Revised Content Guide for Generic Letter 2004-02 Supplemental Responses dated November 2007.

The supplemental response provides the requested information in the revised content guide and provides responses to open items identified in the NRC-W3 GL 2004-02 audit report dated January 28, 2008. Some of the technical analysis for the GL 2004-02 is not complete.

Accordingly some of the requested information in the content guide and the responses to the NRC-W3 GL 2004-02 audit report open items can not be completed at this time. A complete supplemental response will be provided to the NRC per the NRC extension granted to W3 on December 10, 2007. The strainer head-loss testing and analyses will be completed by the end of Waterford 3 spring 2008 refueling outage RF15 (Mode 1). Entergy will update its licensing basis to reflect resolution of Waterford 3 GSI-1 91 issues within 60 days of completion of the Waterford 3 RF15 (Mode 1). And per the Revised Content Guide, the remaining information (final supplemental response) will be provided to the NRC within 90 days of completion of all actions needed to address GL 2004-02. The final supplemental response will provide the basis for the NRC's final assessment of W3 conformance with GL 2004-02.

W3F1-2008-0018 Page 2 provides the details of the supplemental response and includes proprietary information. The proprietary information was provided to Entergy in a GE Hitachi Nuclear Energy (GEH).transmittal that is referenced by an affidavit. GEH requests the enclosed proprietary information identified in Attachment 1 be withheld from public disclosure in accordance with the provisions of 10CFR 2.390 and 10CFR 9.17. Attachment 2 is the non-proprietary version of the response. Attachment 3 contains the affidavit for withholding the proprietary information contained in Attachment 1.

New commitments contained in this submittal are summarized in Attachment 4.

I declare under penalty of perjury that the foregoing is true and correct. Executed on February 29, 2008.

Sinc KSC/G -- ssf Attachment(s):

1.

Supplemental Response to NRC GL 2004-02 (Proprietary InformatiorI) 2.

3.

4.

Supplemental Response to NRC GL 2003-02 (Non-Proprietary Information)

Affidavit Regulatory Commitments

W3F1-2008-0018 Page 3 (w/o Attachment 1) (w/Attachments 2 through 4) cc:

Mr. Elmo E. Collins, Jr.

Regional Administrator U. S. Nuclear Regulatory Commission Region IV 611 Ryan Plaza Drive, Suite 400 Arlington, TX 76011-8064 NRC Senior Resident Inspector Waterford Steam Electric Station Unit 3 P.O. Box 822 Killona, LA 70066-0751 U. S. Nuclear Regulatory Commission Attn: Mr. N. Kalyanam Mail Stop O-07D1 Washington, DC 20555-0001 Wise, Carter, Child & Caraway ATTN: J. Smith P.O. Box 651 Jackson, MS 39205 Winston & Strawn ATTN: N.S. Reynolds 1700 K Street, NW Washington, DC 20006-3817 Morgan, Lewis & Bockius LLP ATTN: T.C. Poindexter 1111 Pennsylvania Avenue, NW Washington, DC 20004