ML080650319
| ML080650319 | |
| Person / Time | |
|---|---|
| Site: | Watts Bar |
| Issue date: | 02/26/2008 |
| From: | Brandon M Tennessee Valley Authority |
| To: | Document Control Desk, Office of Nuclear Reactor Regulation |
| References | |
| Download: ML080650319 (2) | |
Text
SAFEGUARDS INFORMATION Tennessee Valley Authority, Post Office Box 2000, Spring City, Tennessee 37381-2000 FEB 2 6 2008 10 CFR 50.54(p)
U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D. C. 20555-0001 Gentlemen:
In the Matter of the
)
Docket No. 50-390 Tennessee Valley Authority
)
50-391 WATTS BAR NUCLEAR PLANT (WBN) UNIT 1 AND 2 - SECURITY, TRAINING AND QUALIFICATION PLAN, AND SAFEGUARDS CONTINGENCY PLAN, REVISION 7 Pursuant to 10 CFR 50.54(p), this letter provides Revision 7 of the Security, Training and Qualification Plan, and Safeguards Contingency Plan. This revision incorporates the correction to add the section number and title for the "Security Patrols" section, as committed in our December 14, 2007 letter, which provided additional information related to Revision 6 of the WBN Security Plan. TVA has evaluated the changes and does not consider the revision to decrease the overall effectiveness of the plan.
This letter contains Safeguards Information as defined in 10 CFR 73.21. TVA, therefore, requests that the Enclosure to this letter be withheld from public disclosure. The enclosed plan revision is being sent by certified mail and the signed receipt will signify that NRC has received this information.
There are no regulatory commitments associated with this submittal. If you have any questions concerning this matter, please contact me at (423) 365-1824.
Sincerely, M. K. Brandon Manager, Site Licensing and Industry Affairs SAFEGUARDS INFORMATION SAFEGUARDS INFORMATION CLASSIFICATION DOES NOT APPLY TO THIS PAGE WHEN SEPARATED FROM THE ENCLOSURE.
Printed on recycled paper
SAFEGUARDS INFORMATION U.S. Nuclear Regulatory Commission Page 2 FEB 2 6 2008 Enclosure cc:
(Enclosure)
NRC Resident Inspector Watts Bar Nuclear Plant 1260 Nuclear Plant Road Spring City, Tennessee 37381 U.S. Nuclear Regulatory Commission Region II Sam Nunn Atlanta Federal Center 61 Forsyth St., SW, Suite 23T85 Atlanta, Georgia 30303 cc:
(w/o Enclosure)
ATTN: Margaret H. Chernoff, Senior Project Manager U.S. Nuclear Regulatory Commission Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation MS 0-8 H4-A Washington, DC 20555-0001 SAFEGUARDS INFORMATION SAFEGUARDS INFORMATION CLASSIFICATION DOES NOT APPLY TO THIS PAGE WHEN SEPARATED FROM THE ENCLOSURE.