ML080560049

From kanterella
Jump to navigation Jump to search
Public Version - OUO-SRI - Operation Inspection Report for Safe Shutdown Impoundment Dam - Federal Energy Regulatory Commission (FERC) - Results of 6/6/2007 Inspection
ML080560049
Person / Time
Site: Comanche Peak  Luminant icon.png
Issue date: 02/27/2008
From: Hiltz T
NRC/NRR/ADRO/DORL/LPLIV
To: Blevins M
Luminant Generation Co
Singal, Balwant, 415-3016, NRR/DORL/LPL4
Shared Package
ML080560025 List:
References
Download: ML080560049 (2)


Text

ktREG&

I UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 February 27, 2008 Mr. M. R. Blevins Executive Vice President

& Chief Nuclear Officer Luminant Generation Company LLC ATTN: Regulatory Affairs P. 0. Box 1002 Glen Rose, TX 76043

SUBJECT:

COMANCHE PEAK STEAM ELECTRIC STATION, UNITS 1 AND 2 -

OPERATION INSPECTION REPORT FOR SAFE SHUTDOWN IMPOUNDMENT DAM

Dear Mr. Blevins:

  • Enclosed is a copy of the Operation Inspection Report-for Safe Shutdown Impoundment Dam (SSID) prepared by the Federal Energy Regulatory Commission (FERC) for the U.S. Nuclear Regulatory Commission., The enclosure contains the results of an inspection on June 6, 2007, on SSID at Comanche Peak Steam Electric Station, Units 1 and 2. The inspection included the SSID zioned earth and rock-fill dam and the equalization canal. During the inspection, no conditions were observed that would adversely affect the safety of the dam or the nuclear facility. The maintenance of the impoundment appeared to be satisfactory.

At FERC's request, the enclosure is not being made publicly available since it contains critical energy infrastructure information.

Sincerely, Thomas G. Hiltz, Chi f Plant Licensing Branch IV.

Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-445 and 50-446

Enclosure:

As stated cc w/o endl: See next page The enclosure transmitted herewith contains Security-Related information.

When separated from the enclosure, this document is decontrolled.

UCI OUL" ¶TcUnIT: ~LA.

Comanche Peak Steam Electric Station (10/2007) cc w/o endl:

Senior Resident Inspector Ms. Susan M. Jablonski U.S. Nuclear Regulatory Commission Office of Permitting, Remediation.

P.O. Box 2159 and Registration Glen Rose, TX 76403-2159 Texas, Commission on Environmental Quality Regional Administrator, Region IV MC-122 U.S. Nuclear Regulatory Commission P.O. Box 13087 611 Ryan Plaza Drive, Suite 400 Austin, T.X*7871 1-3087 Arlington, TX 76011 Anthony P.' Jones Mr. Fred W. Madden, Director Chief Boiler Inspector Regulatory Affairs Texas Department of Licensing Luminant Generation Company LLC and Regulation P.O. Box 1002 Boiler Division Glen Rose, TX 76043 E.O. Thompson State Office Building P.O. Box 12157 Timothy P. Matthews, Esq. Austin, TX 78711 Morgan Lewis 1111 Pennsylvania Avenue, NW Washington, DC 20004 County Judge P.O. Box 851.

Glen Rose, TX 76043 Environmental and Natural Resources Policy Director Office of the Governor P.O. Box 12428 Austin, TX 78711-3189 Mr. Richard A. Ratliff, Chief Bureau of Radiation Control Texas Dep artment of Health 1100 West 49th Street Austin, TX 78756-3189 Mr. Brian Almon Public Utility Commission William B. Travis Building P.O. Box 13326 1701 North Congress Avenue Austin, TX 78701-3326