Text
INDIANA Indiana Michigan Power INDIANACook Nuclear Plant MICHIGAN One Cook Place Bridgman, MI 49106 AEPcom A unit of American Electric Power February 13, 2008 AEP:NRC:8382 10 CFR 50.90 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Mail Stop O-PI-17 Washington, DC 20555-0001
Subject:
Donald C. Cook Nuclear Plant Units 1 and 2 Docket Nos. 50-315 and 50-316 Supplement to License Amendment Request to Add Surveillance Requirement When Offsite Power is Provided via Backfeed Through Main Transformer when Unit is Shutdown or During Fuel Movement (TAC Nos. MD6317 and MD6318).
Reference:
Letter from J. N. Jensen, Indiana Michigan Power Company, to U. S. Nuclear Regulatory Commission Document Control Desk, "License Amendment Request to Add Surveillance Requirement When Offsite Power is Provided via Backfeed Through Main Transformer when Unit is Shutdown or During Fuel Movement,"
AEP:NRC:7382, dated July 30, 2007 (ML072200257).
Dear Sir or Madam:
This letter supplements a previously submitted amendment request by removing a note from the proposed Technical Specification change.
By the referenced letter, Indiana Michigan Power Company (I&M), proposed to modify the Technical Specifications for Donald C. Cook Nuclear Plant Units 1 and 2 by adding a new Surveillance Requirement. The new Technical Specification Surveillance Requirement would be applicable when offsite electrical power is supplied to a unit via backfeed through the main transformer and the unit is in either Mode 5 or Mode 6, or during movement of irradiated fuel.
The new Surveillance Requirement states that one of two existing Surveillance Requirements, 3.8.1.9.a or 3.8.1.9.b, is applicable under these conditions.
Surveillance Requirement 3.8.1.9.a verifies the capability to automatically transfer the unit electric power distribution system from the auxiliary power source to the preferred offsite circuit. Surveillance Requirement 3.8.1.9.b verifies the capability to manually align the unit electric power system to the alternate offsite circuit.
The new Surveillance Requirement included a note stating "Not required to be performed."
The intent of this note was that the applicable existing Surveillance Requirement, 3.8.1.9.a or 3.8.1.9.b, must be current. Actual performance of existing Surveillance Requirement 3'8.1.9.a or 3.8.1.9.b A-0 f
U. S. Nuclear Regulatory Commission AEP:NRC: 8382 Page 2 would not be required unless the previous performance of existing Surveillance Requirement 3.8.1.9.a or 3.8.1.9.b had exceeded specified Frequency requirements or the previous performance of existing Surveillance Requirement 3.8.1.9.a or 3.8.1.9.b had been invalidated.
In response to a question from a Nuclear Regulatory Commission reviewer, I&M determined that the note in the new Surveillance Requirement is not needed to achieve this intent. Accordingly, I&M is providing new Unit I and Unit 2 Technical Specification pages 3.8.2-3, incorporating the previously proposed new Surveillance Requirement but without the previously proposed note. These pages are provided as Attachments IA and IB to this letter, and supersede the pages provided in Attachments 2A and 2B to the referenced letter. Due to the simplicity of the change, new pages marked to show changes from the existing Technical Specifications are not included. I&M intends to delete the paragraph discussing the note from the Technical Specification Bases change that was provided for information in Attachment 3 to the referenced letter.
The evaluation of significant hazards considerations and environmental considerations documented in the referenced letter remain valid because the intent of the proposed amendment is unaffected by this supplement.
The enclosure to this letter provides an affirmation statement. Copies of this letter and its enclosure and attachments are being transmitted to the Michigan Public Service Commission and Michigan Department of Environmental Quality, in accordance with the requirements of 10 CFR 50.91. There are no new regulatory commitments made in this letter. Should you have any questions, please contact Mr. James M. Petro, Jr., Regulatory Affairs Manager, at (269) 466-2491.
Sincerely, ark A. Pf er Site Vice President JRW/rdw
Enclosure:
Affirmation Attachments:
IA. Donald C. Cook Nuclear Plant Unit 1 Technical Specification Pages With the Proposed Changes Incorporated lB. Donald C. Cook Nuclear Plant Unit 2 Technical Specification Pages With the Proposed Changes Incorporated
U. S. Nuclear Regulatory Commission AEP:NRC:8382 Page 3 c:
J. L. Caldwell, NRC Region 111 K, D. CLUTy, Ft. Wayne AEP, w/o enclosure/attachnments J. T. King, MPSC MDEQ - WHMD/RPMWS NRC Resident Inspector P. S. Tarn, NRC Washington, DC
Enclosure to AEP:NRC: 8382 AFFIRMATION I, Mark A. Peifer, being duly sworn, state that I am Site Vice President of Indiana Michigan Power Company (I&M), that I am authorized to sign and file this request with the Nuclear Regulatory Commission on behalf of I&M, and that the statements made and the matters set forth herein pertaining to I&M are true and correct to the best of my knowledge, information, and belief.
Indiana Michigan Power Company SWORN TO AND SUBSCRIBED BEFORE ME THIS DAYOF
,2008 Notary Public My Commission Expires RMEGAN D. WENDZEL WArtoýqf, ehnln County, my Cornmllssio Expires Jan. 21, 2009
...,-t. *
. 'i t
Yr
Attachment IA to AEP:NRC: 8382 DONALD C. COOK NUCLEAR PLANT UNIT 1 TECHNICAL SPECIFICATION PAGES WITH THE PROPOSED CHANGES INCORPORATED 3.8.2-3
AC Sources - Shutdown 3.8.2 SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.8.2.1
NOTE The following SRs are not required to be performed:
-SR 3.8.1.3, SR 3.8.1.10 through SR 3.8.1.12, SR 3.8.1.15 through SR 3.8.1.17, and SR 3.8.1.18.
For AC sources required to be OPERABLE, the SRs In accordance of Specification 3.8.1, "AC Sources -- Operating,"
with applicable except SR 3.8.1.9, SR 3.8.1.13, SR 3.8.1.14 (ESF SRs actuation signal portion only), SR 3.8.1.19, SR 3.8.1.20, SR 3.8.1.21; and SR 3.8.1.22, are applicable.
SR 3.8.2.2 One of the following SRs is applicable when the In accordance electrical distribution subsystem is being supplied by with applicable "backfeed" from an offsite source via the main SR transformer and a unit auxiliary transformer:
- a.
SR 3.8.1.9.a when the preferred offsite circuit is required to be OPERABLE by LCO 3.8.2.a, or
- b.
SR 3.8.1.9.b when the alternate offsite circuit is required to be OPERABLE by LCO 3.8.2.a.
Cook Nuclear Plant Unit 1 3.8.2-3 Amendment No. 2-&7;
Attachment I B to AEP:NRC: 8382 DONALD C. COOK NUCLEAR PLANT UNIT 2 TECHNICAL SPECIFICATION PAGES WITH THE PROPOSED CHANGES INCORPORATED 3.8.2-3
AC Sources - Shutdown 3.8.2 SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.8.2.1
-NOTE The following SRs are not required to be performed:
SR 3.8.1.3, SR 3.8.1.10 through SR 3.8.1.12, SR 3.8.1.15 through SR 3.8.1.17, and SR 3.8.1.18.
For AC sources required to be OPERABLE, the SRs of Specification 3.8.1, "AC Sources -- Operating,"
except SR 3.8.1.9, SR 3.8.1.13, SR 3.8.1.14 (ESF actuation signal portion only), SR 3.8.1.19, SR 3.8.1.20, SR 3.8.1.21, and SR 3.8.1.22, are applicable.
In accordance with applicable SRs SR 3.8.2.2 One of the following SRs is applicable when the electrical distribution subsystem is being supplied by "backfeed" from an offsite source via the main transformer and a unit auxiliary transformer:
- a.
SR 3.8.1.9.a when the preferred offsite circuit is required to be OPERABLE by LCO 3.8.2.a, or
- b.
SR 3.8.1.9.b when the alternate offsite circuit is required to be OPERABLE by LCO 3.8.2.a.
In accordance with applicable SR Cook Nuclear Plant Unit 2 3.8.2-3 Amendment No. 2-6-9,