Fitness for Duty Program Performance Data Report for Period of July 1, 2007 Through December 31, 2007
ML080500145
Person / Time
Site: Ginna Constellation icon.png
Issue date: 02/11/2008
From: Teed R
Constellation Energy Nuclear Group, Ginna
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
Download: ML080500145 (4)


Text

Ronald C. Teed Director - Security R.E. Ginna Nuclear Power Plant, LLC 1503 Lake Road Ontario, New York 14519-9364 585.771.5223 Ron.Teed @constellation.com Constellation Energy*

Nuclear Generation Group February 11, 2008 U. S. Nuclear Regulatory Commission Washington, DC 20555 ATTENTION:

SUBJECT:

Document Control Desk R.E. Ginna Nuclear Power Plant Docket No. 50-244 Fitness for Duty Program Performance Data Report In accordance with the requirements set forth in 10 CFR 26.71 (d), R.E. Ginna Nuclear Power Plant, LLC has compiled and is submitting the enclosed semi-annual Fitness for Duty (FFD) Program Performance Data Report covering the period July 1, 2007 through December 31, 2007.

Should you have any questions regarding the information in this submittal, please contact Mr. Brian Weaver at (585) 771-5219.

Very truly yours, Ronald C. /eed

Attachment:

(1)

Fitness for Duty Program Performance Data Report cc:

S. J. Collins, NRC D. V. Pickett, NRC Resident Inspector, NRC lootola6'

ATTACHMENT (1)

FITNESS FOR DUTY PROGRAM PERFORMANCE DATA REPORT

ATTACHMENT (1)

FITNESS FOR DUTY PROGRAM PERFORMANCE DATA REPORT Personnel Subject to 10 CFR Part 26 COONSTELLATION ENERGY

-:1 2/31/2007 Company 6M[onths Ending R.E.Ginna Nciclear Power Plant I,4 Tammy H. Henderson, Fitess forDuySpecialist 35 77 Contact Name

¶ Phone)~

CUTOFFS: Screen/Confirmation (ng/ml)

[X] Appendix A to 10 CFR Part 26 Marijuana 50/15 Amphetamines Cocaine Phencyclidine Opiates Alcohol (% BAC)

Annual (Jan-Dec) Random testing rates: Employees & Contractors by 50%.

T Long-term Short-term Testing Results Licensee Employees Contractor Personnel*

IContractor Personnel Average Number with Unescorted Access 467 0

266 R.E. Ginna Nuclear Power Plant does not differentiate between long-term and short-term contractors. All contractors who have obtained unescorted access are considered short-term.

I employee "other" was a test conducted at the request of the Medical Review Officer during an adjudication of the employee.

Recollection of dilute samples.

Breakdown of Confirmed Positive Tests for Specific Substances Marijuana Cocaine Opiates Amphe-Phency-Alcohol Refusal Total tamines lidinetoesTta to test Licensee Employees 0

0 0

0 0

0 0

0 Long-Term Contractors*

0 0

0 0

0 0

0 0

Short-Term Contractors 0

0 0

0 0

0 0

0 Management Actions:

R.E. Ginna Nuclear Power Plant does not differentiate between long-term and short-term contractors. All contractors who have obtained unescorted access are considered short-term.

NRC Reportable Events (Per 10 CFR Part 26.73)

There were no reportable events during this performance data period.