ML080440414
| ML080440414 | |
| Person / Time | |
|---|---|
| Site: | San Onofre |
| Issue date: | 02/11/2008 |
| From: | Ridenoure R Southern California Edison Co |
| To: | Document Control Desk, Office of Nuclear Reactor Regulation |
| References | |
| BL-07-001 | |
| Download: ML080440414 (20) | |
Text
J SOUTHERN CALIFORNIA EDISON An EDISON INTERNATIONAL Company Ross T. Ridenoure VP and Site Manager San Onofre Nuclear Generating Station WITHHOLD FROM PUBLIC DISCLOSURE UNDER 10 CFR § 2.390(do)(1 NOTICE: This letter may be decontrolled upon separation from its enclosure.
February 11, 2008 U. S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, D. C. 20555-0001
Subject:
Docket Nos. 50-361 and 50-362 NRC Bulletin 2007-01 San Onofre Nuclear Generating Station, Units 2 and 3
Dear Sir or Madam:
NRC Bulletin 2007-01 was issued to all holders of operating licenses for nuclear power reactors on December 12, 2007. The purpose of this letter is to provide Southern California Edison's (SCE) response to the subject Bulletin for the San Onofre Nuclear Generating Station, Units 2 and 3.
There are no regulatory commitments made in this letter.
SCE's response is given in the enclosure to this letter and contains security related information. Consistent with NRC Regulatory Information Summary 2005-26, SCE requests that the enclosure to this letter be withheld from public disclosure under 10 CFR § 2.390(d)(1).
If you have any questions or require additional information, please contact Ms. L. T. Conklin at (949) 368-9443.
Mail Drop D45 PO. Box 128 San Clemente, CA 92672 WITHHOLD FROM PUBLIC DISCLOSURE 949-368-6255 PAX 86255 UNDER 10 CFR § 2.390(d)(1)
Fax: 949-368-6183 NOTICE: This letter may be decontrolled upon separation from its enclosure.
Ross.Ridenoure@sce.com Ki czi
WITHHOLD FROM PUBLIC DISCLOSURE UNDER 10 CFR § 2.390(d)(1)
NOTICE: This letter may be decontrolled upon separation from its enclosure.
Document Control Desk February 11, 2008 In accordance with 10 CFR § 50.54(f), the following affirmation is provided:
I declare under penalty of perjury that the foregoing is true and correct.
Executed on February 11, 2008.
ice Prde t and ite Manager S1,outhern C iforn i XEidison
Enclosure:
SCE's Response to NRC Bulletin 2007-01 cc:
E. E. Collins, Regional Administrator, NRC Region IV N. Kalyanam, NRR Project Manager, San Onofre Units 2 & 3 C. C. Osterholtz, NRC Senior Resident Inspector, San Onofre Units 2 & 3 WITHHOLD FROM PUBLIC DISCLOSURE UNDER 10 CFR § 2.390(d)(1)
NOTICE: This letter may be decontrolled upon separation from its enclosure.