Notification of Inspection (NRC Inspection Report 05000313-08-003 and 05000368-08-003) and Request for Information
ML080420505
Person / Time
Site: Arkansas Nuclear  Entergy icon.png
Issue date: 02/11/2008
From: Russ Bywater
Region 4 Engineering Branch 1
To: Mitchell T
Entergy Operations
References
IR-08-003
Download: ML080420505 (11)


See also: IR 05000313/2008003

Text

UNITED STATES

NU CLE AR RE GU LATOR Y C O M M I S S I O N

R EGI ON I V

611 R YAN PLAZA D R IV E, SU ITE 400

AR LI N GTON , TEXAS 76011-4005

February 11, 2008

Timothy G. Mitchell

Vice President Operations

Arkansas Nuclear One

Entergy Operations, Inc.

1448 S.R. 333

Russellville, AR 72802-0967

SUBJECT: ARKANSAS NUCLEAR ONE - NOTIFICATION OF INSPECTION (NRC

INSPECTION REPORT 05000313/2008003 AND 05000368/2008003) AND

REQUEST FOR INFORMATION

Dear Mr. Mitchel:

From March 17 - 28, 2008, reactor inspectors from NRCs Region IV office will perform the

baseline inservice inspection at Arkansas Nuclear One, Unit 2, using NRC Inspection

Procedure 71111.08 and Temporary Instruction 2515/172, Rector Coolant System Dissimilar

Metal Butt Welds. Experience has shown that this inspection is resource intensive both for the

NRC inspectors and your staff. In order to minimize the impact to your onsite resources and to

ensure a productive inspection, we have enclosed a request for documents needed for this

inspection. These documents have been divided into two groups. The first group (Section A of

the enclosure) identifies information to be provided prior to the inspection to ensure that the

inspectors are adequately prepared. The second group (Section B of the enclosure) identifies

the information the inspectors will need upon arrival at the site. It is important that all of these

documents are up to date and complete in order to minimize the number of additional

documents requested during the preparation and/or the onsite portions of the inspection.

We have discussed the schedule for these inspection activities with your staff and understand

that our regulatory contact for this inspection will be Mr. Fred Vanbuskirk of your licensing

organization. Our inspection dates are subject to change based on your updated schedule of

outage activities. If there are any questions about this inspection or the material requested,

please contact the lead inspector Wayne Sifre at (817) 860-8193 (wcs@nrc.gov).

Entergy Operations, Inc. -2-

In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its

enclosure will be available electronically for public inspection in the NRC Public Document

Room or from the Publicly Available Records (PARS) component of NRC's document system

(ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-

rm/adams.html (the Public Electronic Reading Room).

Sincerely,

/RA/

Russell L. Bywater, Chief

Engineering Branch 1

Division of Reactor Safety

Dockets: 50-313; 50-368

Licenses: DPR-51; NPF-6

Enclosure:

Inservice Inspection Document Request

cc: w/enclosure

Senior Vice President

Entergy Operations, Inc.

P.O. Box 31995

Jackson, MS 39286-1995

Senior Vice President

& Chief Operating Officer

Entergy Operations, Inc.

P.O. Box 31995

Jackson, MS 39286-1995

Vice President

Operations Support

Entergy Operations, Inc.

P.O. Box 31995

Jackson, MS 39286-1995

Site Vice President

Entergy Operations, Inc.

Arkansas Nuclear One

1448 S. R. 333

Russellville, AR 72802

Entergy Operations, Inc. -3-

General Manager Plant Operations

Entergy Operations, Inc.

Arkansas Nuclear One

1448 S. R. 333

Russellville, AR 72802

Director, Nuclear Safety Assurance

Entergy Operations, Inc.

Arkansas Nuclear One

1448 S. R. 333

Russellville, AR 72802

Manager, Licensing

Entergy Operations, Inc.

Arkansas Nuclear One

1448 S. R. 333

Russellville, AR 72802

Director, Nuclear Safety & Licensing

Entergy Operations, Inc.

1340 Echelon Parkway

Jackson, MS 39213-8298

Section Chief, Division of Health

Radiation Control Section

Arkansas Department of Health and

Human Services

4815 West Markham Street, Slot 30

Little Rock, AR 72205-3867

Section Chief, Division of Health

Emergency Management Section

Arkansas Department of Health

4815 West Markham Street, Slot 30

Little Rock, AR 72205-3867

County Judge of Pope County

Pope County Courthouse

100 West Main Street

Russellville, AR 72801

Entergy Operations, Inc. -4-

Electronic distribution by RIV:

Regional Administrator (EEC)

DRP Director (DDC)

DRS Director (RJC1)

DRS Deputy Director (ACC)

Senior Resident Inspector (AAS1)

Branch Chief, DRP/E (JAC)

Senior Project Engineer, DRP/E (GDR)

Senior Project Engineer, DRP/E (GBM)

Team Leader, DRP/TSS (CJP)

RITS Coordinator (MSH3)

SUNSI Review Completed: __Y___ ADAMS: 6 Yes No Initials: __WCS____

6 Publicly Available Non-Publicly Available Sensitive 6 Non-Sensitive

S:\DRS\REPORTS\AN2008003lt-wcs.doc

SRI:EB1 RI:EB1 C:EB1

WCSifre/lmb STGraves RLBywater

/RA/ /RA/ /RA/

2/7/08 2/11/08 2/11/08

OFFICIAL RECORD COPY T=Telephone E=E-mail F=Fax

INSERVICE INSPECTION DOCUMENT REQUEST

Inspection Dates: March 17, 2008 - March 28, 2008

Inspection Procedures: IP 71111.08 Inservice Inspection (ISI) Activities

TI 2515/172 Reactor Coolant Dissimilar Metal Butt Welds

Inspectors: W. Sifre, Senior Reactor Inspector (Lead Inspector - ISI)

S. Graves, Reactor Inspector

A. Information Requested for the In-Office Preparation Week

The following information should be sent to the Region IV office in hard copy or

electronic format (ims.certrec.com preferred), in care of W. Sifre, by February 25, 2008,

to facilitate the selection of specific items that will be reviewed during the onsite

inspection week. The inspector will select specific items from the information requested

below and then request from your staff additional documents needed during the onsite

inspection week (section B of this enclosure). We ask that the specific items selected

from the lists be available and ready for review on the first day of inspection. Please

provide requested documentation electronically if possible. If requested documents are

large and only hard copy formats are available, please inform the inspector(s), and

provide subject documentation during the first day of the onsite inspection. If you have

any questions regarding this information request, please call the inspector as soon as

possible.

A.1 ISI / Welding Programs and Schedule Information

a) A detailed schedule (including preliminary dates) of:

i) Nondestructive examinations (NDEs) planned for Class 1 & 2 systems

and containment, performed as part of your ASME Section XI, Risk

Informed (if applicable), and augmented ISI Programs during the

upcoming outage.

Provide a status summary of the NDE inspection activities vs. the

required inspection period percentages for this Interval by category per

ASME Section XI, IWX-2400 (Do not provide separately if other

documentation requested contains this information)

ii) Reactor pressure vessel head (RPVH) examinations planned for the

upcoming outage.

iii) Examinations planned for Alloy 82/182/600 components that are not

included in the Section XI scope. (If applicable)

-1- Enclosure

iv) Examinations planned as part of your Boric Acid Corrosion Control

Program (Mode 3 walkdowns, bolted connection walkdowns, etc.)

v) Welding activities that are scheduled to be completed during the

upcoming outage (ASME Class 1, 2, or 3 structures, systems, or

components (SSCs))

b) A copy of ASME Section XI Code Relief Requests and associated NRC Safety

Evaluations applicable to the examinations identified above.

c) A list of NDE reports (ultrasonic, radiography, magnetic particle, dye penetrant,

visual VT-1, VT-2, and VT-3) which have identified recordable indications

(geometric or flaw) on Code Class 1 & 2 systems since the beginning of the last

refueling outage. This should include the previousSection XI pressure test(s)

conducted during start up and any evaluations associated with the results of the

pressure tests. Also, include in the list the NDE reports with recorded indications

in the RPVH penetration nozzles which have been accepted for continued

service. The list of NDE reports should include a brief description of the SSC

where the recordable indication was identified.

d) A list with a brief description (e.g. system, material, pipe size, weld number, and

NDE performed) of the welds in Code Class 1 and 2 systems which have been

fabricated due to component repair/replacement activities since the beginning of

the last refueling outage, or are planned to be fabricated this refueling outage.

e) If reactor vessel weld examinations required by the ASME Code are scheduled to

occur during the upcoming outage, provide a detailed description of the welds to

be examined, and the extent of the planned examination. Please also provide

reference numbers for applicable procedures that will be used to conduct these

examinations.

f) Copy of any 10 CFR Part 21 reports applicable to your SSCs within the scope of

Section XI of the ASME Code that have been identified since the beginning of the

last refueling outage.

g) A list of any temporary non-code repairs in service (e.g. pinhole leaks).

h) Please provide copies of the most recent self assessments for the ISI, Welding,

and Alloy 600 Programs.

A.2 Reactor Pressure Vessel Head (RPVH)

a) Provide the detailed scope of the planned NDE of the reactor vessel head which

identifies the types of NDE methods to be used on each specific part of the

vessel head to fulfill NRC commitments made in response to NRC Bulletin 2002-

02 and NRC Order EA-03-009. Also, include examination scope expansion

criteria and planned expansion sample sizes if relevant indications are identified.

(If applicable)

-2- Enclosure

b) A list of the standards and/or requirements that will be used to evaluate

indications identified during NDE of the reactor vessel head (e.g. the specific

industry or procedural standards which will be used to evaluate potential leakage

and/or flaw indications).

A.3 Boric Acid Corrosion Control Program (BACCP)

a) Copy of the procedures that govern the scope, equipment and implementation of

the inspections required to identify boric acid leakage and the procedures for

boric acid leakage/corrosion evaluation.

b) Please provide a list of leaks (including code class of the components) that have

been identified since the last refueling outage and associated corrective action

documentation. If during the last cycle, the Unit was shutdown, please provide

documentation of containment walk-down inspections performed as part of the

BACCP.

c) Please provide a copy of the most recent self-assessment performed for the

BACCP.

A.4 Metals Reliability (MRP-139) Program Activities

a) A list and verification that the baseline inspections of all Dissimilar Metal Butt

Welds (DMBWs)have been completed by December 31, 2007.

b) Verification that baseline inspection of hot leg and cold leg temperature DMBWs

have been included in the inspection program and that the schedules for the

baseline inspections are consistent with the baseline schedules in MRP-139.

` c) A list and schedule of all DMBW examinations that will occur in the coming

refueling outage. If none are scheduled, then data from previous examinations

should be available for review.

d) A list and schedule for any welding to be performed on DMBWs in the coming

outage. If no welding will be performed then records of previous welding on

DMBWs and post weld NDE documentation.

e) A list and schedule of any stress improvement (SI) activities planned for the

coming refueling outage. If none are scheduled then have qualification reports

for any SIs previously performed.

f) Documentation and description of how the baseline and inservice inspection

specifications in MRP-139 are satisfied at your facility.

-3- Enclosure

A.5 Additional Information Related To All ISI Activities

a) A list with a brief description of ISI and BACCP related issues (e.g., condition

reports) entered into your corrective action program since the beginning of the

last refueling outage (for the applicable Unit). For example, a list based upon

data base searches using key words related to piping such as: ISI, ASME Code,

Section XI, NDE, cracks, wear, thinning, leakage, rust, corrosion, boric acid, or

errors in piping examinations.

b) Please provide names and phone numbers for the following program leads:

ISI contacts (Examination, planning)

Containment Exams

RPVH Exams

Snubbers and Supports

Repair and Replacement Program Manager

Licensing Contact

Site Welding Engineer

Boric Acid Corrosion Control Program

B. Information To Be Provided Onsite To The Inspector At The Entrance Meeting

(March 17, 2008):

B.1 ISI / Welding Programs and Schedule Information

a) Updated schedules for ISI/NDE activities, planned welding activities, and

schedule showing contingency repair plans, if available.

b) For ASME Class 1 and 2 welds selected by the inspector from the lists provided

from section A of this enclosure, please provide copies of the following

documentation for each subject weld:

i) Weld data sheet (traveler)

ii) Weld configuration and system location

iii) Applicable Code Edition and Addenda for weldment

iv) Applicable Code Edition and Addenda for welding procedures

v) Applicable weld procedures (WPS) used to fabricate the welds

vi) Copies of procedure qualification records (PQRs) supporting the WPS

from B.1.b.v

vii) Copies of mechanical test reports identified in the PQRs above

viii) Copies of the nonconformance reports for the selected welds (If

Applicable)

ix) Radiographs of the selected welds and access to equipment to allow

viewing radiographs (If RT was performed)

x) Copies of the preservice examination records for the selected welds.

-4- Enclosure

xi) Copies of welder performance qualifications records applicable to WPS,

including documentation that welder maintained proficiency in the

applicable welding processes specified in the WPS (At least six months

prior to date subject work)

xii) Copies of NDE personnel qualifications (VT, PT, UT, RT) As applicable

c) For the ISI related corrective action issues selected by the inspector from

Section A of this enclosure, provide a copy of the corrective actions and

supporting documentation.

d) For the NDE reports with recordable indications on Code Class 1 & 2 systems

selected by the inspector from section A above, provide a copy of the

examination records, examiner qualification records, and associated corrective

action documents.

e) A copy of (or ready access to) most current revision of the ISI Program Manual

and Plan for the current Interval.

f) For the NDEs selected by the inspector from section A of this enclosure, provide

copy of the NDE procedures used to perform the examinations (including

calibration and flaw characterization/sizing procedures). For ultrasonic

examination procedures qualified in accordance with ASME Code,Section XI,

Appendix VIII, provide documentation supporting the procedure qualification

(e.g., the EPRI performance demonstration qualification summary sheets). Also,

include documentation of the specific equipment to be used (e.g., ultrasonic unit,

cables, and transducers including serial numbers) and NDE personnel

qualification records.

B.2 Reactor Pressure Vessel Head (RPVH)

a) Provide the NDE personnel qualification records for the examiners who will

perform examinations of the RPVH.

b) Provide drawings showing the following: (If a visual examination is planned for

the upcoming refueling outage)

i) RPVH and CRDM nozzle configurations

ii) RPVH insulation configuration

The drawings listed above should include fabrication drawings for the nozzle

attachment welds as applicable.

c) Copy of NDE reports from the last RPVH examination.

-5- Enclosure

d) Copy of evaluation or calculation demonstrating that the scope of the visual

examination of the upper head will meet the 95% minimum coverage required by

NRC Order EA-03-009 (If a visual examination is planned for the upcoming

refueling outage).

e) Provide a copy of the procedures that will be used to identify the source of any

boric acid deposits identified on the RPVH. If no explicit procedures exist which

govern this activity, provide a description of the process to be followed including

personnel responsibilities and expectations.

f) Provide a copy of the updated calculation of effective degradation years (EDY)

for the RPVH susceptibility ranking.

g) Provide copy of the vendor qualification report(s) that demonstrates the detection

capability of the NDE equipment used for the RPVH examinations. Also, identify

any changes in equipment configurations used for the RPVH examinations which

differ from that used in the vendor qualification report(s).

B.3 Boric Acid Corrosion Control Program (BACCP)

a) Please provide boric acid walk down inspection results, an updated list of boric

acid leaks identified so far this outage, associated corrective action

documentation, and overall status of planned boric acid inspections.

b) Please provide any engineering evaluations completed for boric acid leaks

identified since the end of the last refueling outage. Please include a status of

corrective actions to repair and/or clean these boric acid leaks. Please

specifically which known leaks, if any, have remained in service or will remain in

service as active leaks.

B.4 Codes and Standards

a) Ready access to: (i.e. copies provided to the inspector to use for the duration of

the inspection at the on-site inspection location, or room number and location

where available)

b) Applicable editions of the ASME Code (Sections V, IX and XI) for the inservice

inspection program and the repair/replacement program.

Inspector Contact Information:

W. Sifre Sam Graves

Senior Reactor Inspector Reactor Inspector

817-860-8193 817-860-8102

lee1@nrc.gov stg2@nrc.gov

-6- Enclosure

Mailing Address:

US NRC Region IV

Attn: W. Sifre

611 Ryan Plaza Drive, Suite 400

Arlington, TX 76011

-7- Enclosure