ML080420444
| ML080420444 | |
| Person / Time | |
|---|---|
| Site: | Palo Verde |
| Issue date: | 02/05/2008 |
| From: | Radtke T APS, Arizona Public Service Co |
| To: | Document Control Desk, Office of Nuclear Reactor Regulation |
| References | |
| 240-02621-TLR/EAO/LDB 40DP-9ZZ19, Rev 23 | |
| Download: ML080420444 (3) | |
Text
WITHHOLD ENCLOSURES FROM PUBLIC DISCLOSURE PURSUANT TO 10 CFR 2.390(d)1 Z-A4M Terry L. Radtke General Manager, Mail Station 7636 Palo Verde Nuclear Emergency Services &
Tel. 623-393-6928 PO Box 52034 Generating Station Support Fax 623-393-5442 Phoenix, Arizona 85072-2034 10 CFR 50.54(q) 10 CFR 2.390 240-02621 -TLR/EAO/LDB February 5, 2008 ATTN: Document Control Desk U. S. Nuclear Regulatory Commission Washington, DC 20555-0001
Dear Sirs:
Subject:
Palo Verde Nuclear Generating Station (PVNGS)
Units: 1, 2, and 3 Dockets: 50-528, 50-529, and 50-530 Licenses: NPF-41, NPF-51 and NPF-74 Revision of PVNGS Emergency Plan Implementing Procedure Pursuant to 10 CFR 50.54(q), Arizona Public Service Company (APS) is forwarding revision to procedure 40DP-9ZZ19, Revision 23, "Operational Considerations for Fire",
which became effective on January 18, 2008. APS has evaluated the changes incorporated in the revised procedure and has determined the changes do not decrease the effectiveness of the Emergency Plan and the Plan continues to comply with the standards of 10 CFR 50.47(b) and the requirements of Appendix E to 10 CFR 50.
Certain procedures contain information considered private or proprietary (i.e., names and telephone numbers for use during an emergency) which have been redacted in accordance with NRC Generic Letter No. 81-27.
It is Arizona Public Service Company's position that the attached enclosures, while not safeguards information, contain sensitive unclassified information that should be exempt from public disclosure pursuant to 10 CFR 2.390(d)(1). The pages which contain the sensitive unclassified information have been identified in accordance with 10 CFR 2.390(b)(1)(i)(A), "withhold from public disclosure under 10 CFR 2.390."
No commitments are being made to the NRC by this letter.
WITHHOLD ENCLOSURES FROM PUBLIC DISCLOSURE PURSUANT TO 10 CFR 2.390(d)1
WITHHOLD ENCLOSURES FROM PUBLIC DISCLOSURE PURSUANT TO 10 CFR 2.390(d)1 U. S. Nuclear Regulatory Commission PVNGS Emergency Plan Implementing Procedures Page 2 No commitments are being made to the NRC by this letter.
Should you have questions regarding this submittal, please contact Ed O'Neill at (623) 393-6280.
Sincerely, L
Terry L. Radtke TLR/LDB/Idb
Enclosures:
1.
2.
Summary of Changes Procedure 40DP-9ZZ19 cc:
E. E. Collins, Jr.
M. T. Markley G. G. Warnick P. J. Elkmann NRC Region IV Regional Administrator (Two copies)
NRC NRR Project Manager (send electronic and paper)
NRC Senior Resident Inspector for PVNGS NRC Emergency Preparedness Inspector (One copy)
WITHHOLD ENCLOSURES FROM PUBLIC DISCLOSURE PURSUANT TO 10 CFR 2.390(d)1
WITHHOLD ENCLOSURES FROM PUBLIC DISCLOSURE PURSUANT TO 10 CFR 2.390(d)1 U. S. Nuclear Regulatory Commission PVNGS Emergency Plan Implementing Procedures Page 3 NO.
Pages with Redacted Information 40DP-9ZZ19 NA WITHHOLD ENCLOSURES FROM PUBLIC DISCLOSURE PURSUANT TO 10 CFR 2.390(d)1