ML080390038

From kanterella
Jump to navigation Jump to search

Technical Specifications, Extend Local Power Range Monitor Calibration Interval
ML080390038
Person / Time
Site: Peach Bottom  Constellation icon.png
Issue date: 02/29/2008
From:
NRC/NRR/ADRO/DORL/LPLI-2
To:
Hughey J, NRR/DORL, 301-415-3204
Shared Package
ml080390028 List:
References
TAC MD3717, TAC MD3718
Download: ML080390038 (4)


Text

(5).

Exelon Generation Company, pursuant to the Act and 10 CFR Parts 30 and 70, to possess, but not to separate, such byproduct and special nuclear material as may be produced by operation of the facility.

C.

This renewed license shall be deemed to contain and is subject to the conditions specified in the following Commission regulations in 10 CFR Chapter 1: Part 20, Section 30.34 of Part 30, Section 40.41 of Part 40, Section 50.54 of Part 50, and Section 70.32 of Part 70;.all applicable provisions of the Act and the rules, regulations, and orders of the Commission now or hereafter in effect; and is subject to the additional conditions specified below:

(1)

Maximum Power Level Exelon Generation Company is autho rized to operate the Peach Bottom Atomic Power Station, Unit 2, at steady state reactor-core power levels not in excess of 3514 megawatts thermal.

(2)'

Technical Specifications The Technical Specifications contained in Appendices A and B, as revised through Amendment No. 266

, are hereby incorporated in the license. Exelon Generation Company shall operate the facility in accordance with the Technical Specifications.

(3)

Physical Protection Exelon Generation Company shall fully im plement and maintain in effect all provisions of the Comm ission-ap proved physical security, training and qualification, and safeguards contingency plans, including amendments made pursuant to provisions of the Miscellaneous Amendments and Search Requirements revisions to 10 CFR 73.55 (51 FIR 27817 and 27822) and the authority of 10 CFR 50.90 and 10 CFR 50.54(p). The combined set of plans', submitted by letter dated May 17, 2006, is

-entitled: "Peach Bottom Atomic Power Sta 'tion Security Plan, Training and Qualification Plan, Safeguards Contingency Plan, and Independent Spent Fuel Storage Installation Security Program, Revision 3.". The set

-contains -Safeg uards-lnfo rmation-protected-und er -1 0-C FR-712 11 (4)

Fire Protection The Exelon Generation Company shall implement and maintain in effect all* provisions of the approved fire protection program as described in the Updated Final Safety Analysis Report for the facility, and as approved in the NRC Safety Evaluation Report (SER) dated May 23, 1979, and Supplements dated August 14, September 15, October 10 and November 24, 1980, and in the NRC SERs dated September 16, 1993, and August

-24;, 1-994-1-subject-to-the -following.-provision:

The Exelon Generation Company may make changes to the approved

'The Training and Qualification Plan and Safeguards Contingency Plan are Appendices to the Security Plan.

Renewed License No. DPR-44 Revised by letter dated October 28, 2004 Revisedd by letter dated May 29, 2007 Amendment No266 Page 3

RPS. Instrumentation 3.3 1.

SURVEILLANCEREQUIREMENTS (continued)_________

SURVEILLANCE FREQUENCY SR 3.3.1.1.3 (Not Used.)

SR 3.8.1-.1.4 Perform CHANNEL FUNCTIONAL TEST.

7 days SR 3.3.1.1.5--------------------NOTE ------------------

Not required to be performed when en )tering MODE 2 from MODE 1 until 12 ho'urs after entering MODE 2.

Perform--CHANNEL-FUNC-IONAL-TEST-31-days SR 33.11.6 Perform CHANNEL FUNCTIONAL TEST.

31 days SR 3.3.1.1.7 (Not Used.)

SR 3.3.1.1.8 Cal ibrate the local power range monitors.

2000 MWD/T average core exposure I

(continued)

PBAPS UNIT 2 3.3-4 PBAS NI 23.-4Amendment No. 2-3-266

(5)

Exelon Generation Company, pursuant to the Act and 10 CER Parts 30 and 70, to possess, but not to separate, such byproduct and special nuclear material as may be produced by operation of the facility.

C.

This renewed license shall be deemed to contain and is subject to the conditions specified in the following Commission regulations in 10 CFR Chapter I: Part 20, Section 30.34 of Part 30, Section 40.41 of Part 40, Section 50.54 of Part 50, and Section 70.32 of Part 70; all applicable provisions of the Act and the rules, regulations, and orders of the Commission now or hereafter in effect; and is subject to the additional conditions specified below:

(1)

Maximum Power Level Exelon Generation Company is authorized to operate the Peach Bottom Atomic Power Station, Unit No. 3, at steady state reactor core power levels not in excess of 3514 megawatts thermal.

(2)

Technical Specifications The Technical Specifications contained in Appendices A and B, as revised through Amendment No.270

, are hereby incorporated in the license. Exelon Generation Company shall operate the facility in

,accordance with the Technical Specifications.'

(3)

Physical Protection Exelon Generation Company shall fully implement and maintain in effect all provisions of theC Comm ission-a pp roved physical security, training and qualification, and safeguards contingency plans, including amendments made pursuant to provisions of the Miscellaneous Amendments and Search Requirements revisions to 10 CFR 73.55 (51 FR 278.17 and

.27822) and to the authority of 10 CFR 50.90 and 10 CFR 50.54(p). The combined set of plans2, submitted by letter dated May 17, 2006, is entitled: "Peach Bottom Atomic Power Station Security Plan, Training and Qualification Plan, Safeguards Contingency Plan, and Independent Spent Fuel Storage Installation Security PRroam Revisiorf3." -The-set-

-contains Safeguard rInfration protected under 10 CFR 73.21.

(4)

Fire Protection The Exelon Generation Company shall implement and maintain in effect all provisions of the approved fire protection program as described in the Updated Final Safety Analysis Report for the facility, and as approved in

'Licensed power level was-revised -by Amendment--No;- 250, dated -Novemnber 22, 2002, and wil l be implemented following the 14thl refueling outage currently scheduled for Fall 2003.

2 The Training and Qualification Plan and Safeguards Contingency Plan are Appendices to the Security Plan..

Renewed License No. DPR-56 Revised by letter dated October 28, 2004 Revised by letter dated November 5, 2004 Revised by letter dated May 29, 2007

  • Amiendmkent No.270 Page 3

RPS Instrumentation 3.3.1.1 SURVEILLANCEREQUIREMENTS (conti nued)

SURVEI LLANCE FREQUENCY SR 3.3.1.1.3 (Not Used.)

SR 3.3.1.1.4 Perform CHANNEL FUNCTIONAL TEST.

7 days SR 3.3.1.1.5--------------------NOTE ------- -----------

Not required to be performed when entering MODE 2 from MODE 1 until 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> after entering MODE 2.

Perform--CHANNEL-FUNCTIONAL-TEST-31-days SR 33.11.6 Perform CHANNEL FUNCTIONAL TEST.

31 days SR 3.3.1.1.7 (Not Used.)

SR 3.3.1.1.8 Calibrate the local power range monitors.

.2000 MWDIT average core exposure I

(continued)

PBAPS UNIT 3 3.3-4 PBAP UNI 3 33-4Amendment No.

2-34 270