NL-08-009, Figure 9.4, Current Unit 1 Activity Isopleths.
From kanterella
(Redirected from ML080320058)
Jump to navigation
Jump to search
ML080320058 | |
Person / Time | |
---|---|
Site: | Indian Point |
Issue date: | 01/04/2008 |
From: | GZA GeoEnvironmental |
To: | Office of Nuclear Reactor Regulation |
References | |
41.0017869.10, FOIA/PA-2010-0209, NL-08-009 | |
Download: ML080320058 (1) | |
Similar Documents at Indian Point | |
---|---|
Category:Drawing
MONTHYEARML20259A2102020-09-14014 September 2020
[Table view]Updated Final Safety Analysis Report, Chapters 3 Through 5, Figures ML20259A2112020-09-14014 September 2020 Updated Final Safety Analysis Report, Chapter 11, Figures ML20259A2082020-09-14014 September 2020 Updated Final Safety Analysis Report, Chapter 1, Figures ML20259A2092020-09-14014 September 2020 Updated Final Safety Analysis Report, Chapter 2, Figures IR 05000247/20160092016-11-21021 November 2016 Davis-Besse Nuclear Power Station, Unit 1, Revision 31 to Updated Final Safety Analysis Report, Drawing E-0058B, Rev 12, Sheet 0015A NL-16-109, Indian Point, Unit 2, Amendment Update to the Updated Final Safety Analysis Report (Ufsar), Revision 26 - Chapter 8, Electrical Systems, Figures2016-09-19019 September 2016 Indian Point, Unit 2, Amendment Update to the Updated Final Safety Analysis Report (Ufsar), Revision 26 - Chapter 8, Electrical Systems, Figures ML16280A1682016-09-19019 September 2016 Amendment Update to the Updated Final Safety Analysis Report (Ufsar), Revision 26 - Chapter 4, Reactor Coolant System, Drawings NL-16-109, Indian Point, Unit 2, Amendment Update to the Updated Final Safety Analysis Report (Ufsar), Revision 26 - Chapter 7, Instrumentation and Control, Drawings2016-09-19019 September 2016 Indian Point, Unit 2, Amendment Update to the Updated Final Safety Analysis Report (Ufsar), Revision 26 - Chapter 7, Instrumentation and Control, Drawings NL-16-109, Indian Point, Unit 2, Amendment Update to the Updated Final Safety Analysis Report (Ufsar), Revision 26 - Chapter 7, Instrumentation and Control, Figures2016-09-19019 September 2016 Indian Point, Unit 2, Amendment Update to the Updated Final Safety Analysis Report (Ufsar), Revision 26 - Chapter 7, Instrumentation and Control, Figures NL-16-109, Indian Point, Unit 2, Amendment Update to the Updated Final Safety Analysis Report (Ufsar), Revision 26 - Chapter 6, Engineered Safety Features, Drawings2016-09-19019 September 2016 Indian Point, Unit 2, Amendment Update to the Updated Final Safety Analysis Report (Ufsar), Revision 26 - Chapter 6, Engineered Safety Features, Drawings NL-16-109, Indian Point, Unit 2, Amendment Update to the Updated Final Safety Analysis Report (Ufsar), Revision 26 - Chapter 6, Engineered Safety Features, Figures2016-09-19019 September 2016 Indian Point, Unit 2, Amendment Update to the Updated Final Safety Analysis Report (Ufsar), Revision 26 - Chapter 6, Engineered Safety Features, Figures NL-16-109, Indian Point, Unit 2, Amendment Update to the Updated Final Safety Analysis Report (Ufsar), Revision 26 - Chapter 5, Containment Systems, Drawing2016-09-19019 September 2016 Indian Point, Unit 2, Amendment Update to the Updated Final Safety Analysis Report (Ufsar), Revision 26 - Chapter 5, Containment Systems, Drawing NL-16-109, Indian Point, Unit 2, Amendment Update to the Updated Final Safety Analysis Report (Ufsar), Revision 26 - Chapter 5, Containment Systems, Figures2016-09-19019 September 2016 Indian Point, Unit 2, Amendment Update to the Updated Final Safety Analysis Report (Ufsar), Revision 26 - Chapter 5, Containment Systems, Figures NL-16-109, Indian Point, Unit 2, Amendment Update to the Updated Final Safety Analysis Report (Ufsar), Revision 26 - Chapter 4, Reactor Coolant System, Drawings2016-09-19019 September 2016 Indian Point, Unit 2, Amendment Update to the Updated Final Safety Analysis Report (Ufsar), Revision 26 - Chapter 4, Reactor Coolant System, Drawings NL-16-109, Indian Point, Unit 2, Amendment Update to the Updated Final Safety Analysis Report (Ufsar), Revision 26 - Chapter 4, Reactor Coolant System, Figures2016-09-19019 September 2016 Indian Point, Unit 2, Amendment Update to the Updated Final Safety Analysis Report (Ufsar), Revision 26 - Chapter 4, Reactor Coolant System, Figures NL-16-109, Indian Point, Unit 2, Amendment Update to the Updated Final Safety Analysis Report (Ufsar), Revision 26 - Chapter 4, Reactor Coolant System2016-09-19019 September 2016 Indian Point, Unit 2, Amendment Update to the Updated Final Safety Analysis Report (Ufsar), Revision 26 - Chapter 4, Reactor Coolant System NL-16-109, Indian Point, Unit 2, Amendment Update to the Updated Final Safety Analysis Report (Ufsar), Revision 26 - Chapter 3, Reactor, Figures2016-09-19019 September 2016 Indian Point, Unit 2, Amendment Update to the Updated Final Safety Analysis Report (Ufsar), Revision 26 - Chapter 3, Reactor, Figures NL-16-109, Indian Point, Unit 2, Amendment Update to the Updated Final Safety Analysis Report (Ufsar), Revision 26 - Chapter 1, Introduction and Summary, Figures2016-09-19019 September 2016 Indian Point, Unit 2, Amendment Update to the Updated Final Safety Analysis Report (Ufsar), Revision 26 - Chapter 1, Introduction and Summary, Figures ML16280A1892016-09-19019 September 2016 Amendment Update to the Updated Final Safety Analysis Report (Ufsar), Revision 26 - Chapter 5, Containment Systems, Drawing ML16280A1942016-09-19019 September 2016 Amendment Update to the Updated Final Safety Analysis Report (Ufsar), Revision 26 - Chapter 7, Instrumentation and Control, Figures ML16280A1922016-09-19019 September 2016 Amendment Update to the Updated Final Safety Analysis Report (Ufsar), Revision 26 - Chapter 6, Engineered Safety Features, Drawings ML16280A1952016-09-19019 September 2016 Amendment Update to the Updated Final Safety Analysis Report (Ufsar), Revision 26 - Chapter 7, Instrumentation and Control, Drawings ML16280A1882016-09-19019 September 2016 Amendment Update to the Updated Final Safety Analysis Report (Ufsar), Revision 26 - Chapter 5, Containment Systems, Figures ML16280A1912016-09-19019 September 2016 Amendment Update to the Updated Final Safety Analysis Report (Ufsar), Revision 26 - Chapter 6, Engineered Safety Features, Figures ML16280A1972016-09-19019 September 2016 Amendment Update to the Updated Final Safety Analysis Report (Ufsar), Revision 26 - Chapter 8, Electrical Systems, Figures ML16280A1652016-09-19019 September 2016 Amendment Update to the Updated Final Safety Analysis Report (Ufsar), Revision 26 - Chapter 3, Reactor, Figures ML16280A1672016-09-19019 September 2016 Amendment Update to the Updated Final Safety Analysis Report (Ufsar), Revision 26 - Chapter 4, Reactor Coolant System, Figures ML16280A1602016-09-19019 September 2016 Amendment Update to the Updated Final Safety Analysis Report (Ufsar), Revision 26 - Chapter 1, Introduction and Summary, Figures ML16280A1662016-09-19019 September 2016 Amendment Update to the Updated Final Safety Analysis Report (Ufsar), Revision 26 - Chapter 4, Reactor Coolant System NL-14-121, Indian Point, Unit 2, Updated Final Safety Analysis Report, (Ufsar), Revision 25, Chapter 9, Drawings2014-09-17017 September 2014 Indian Point, Unit 2, Updated Final Safety Analysis Report, (Ufsar), Revision 25, Chapter 9, Drawings NL-14-121, Indian Point, Unit 2, Updated Final Safety Analysis Report,(Ufsar), Revision 25, Chapter 10, Figures2014-09-17017 September 2014 Indian Point, Unit 2, Updated Final Safety Analysis Report,(Ufsar), Revision 25, Chapter 10, Figures NL-14-121, Indian Point, Unit 2, Updated Final Safety Analysis Report,(Ufsar), Revision 25, Chapter 10, Drawings2014-09-17017 September 2014 Indian Point, Unit 2, Updated Final Safety Analysis Report,(Ufsar), Revision 25, Chapter 10, Drawings NL-14-121, Indian Point, Unit 2, Updated Final Safety Analysis Report,(Ufsar), Revision 25, Chapter 11, Figures2014-09-17017 September 2014 Indian Point, Unit 2, Updated Final Safety Analysis Report,(Ufsar), Revision 25, Chapter 11, Figures NL-14-121, Indian Point, Unit 2, Updated Final Safety Analysis Report,(Ufsar), Revision 25, Chapter 9, Figures2014-09-17017 September 2014 Indian Point, Unit 2, Updated Final Safety Analysis Report,(Ufsar), Revision 25, Chapter 9, Figures NL-14-121, Indian Point, Unit 2, Updated Final Safety Analysis Report, (Ufsar), Revision 25, Chapter 8, Drawings2014-09-17017 September 2014 Indian Point, Unit 2, Updated Final Safety Analysis Report, (Ufsar), Revision 25, Chapter 8, Drawings NL-14-121, Indian Point, Unit 2, Updated Final Safety Analysis Report, (Ufsar), Revision 25, Chapter 8 - Figures2014-09-17017 September 2014 Indian Point, Unit 2, Updated Final Safety Analysis Report, (Ufsar), Revision 25, Chapter 8 - Figures ML14287A3432014-09-17017 September 2014 Updated Final Safety Analysis Report, (Ufsar), Revision 25, Chapter 8, Drawings ML14287A3562014-09-17017 September 2014 Updated Final Safety Analysis Report,(Ufsar), Revision 25, Chapter 11, Figures ML14287A3512014-09-17017 September 2014 Updated Final Safety Analysis Report,(Ufsar), Revision 25, Chapter 10, Drawings ML14287A3502014-09-17017 September 2014 Updated Final Safety Analysis Report,(Ufsar), Revision 25, Chapter 10, Figures ML14287A3482014-09-17017 September 2014 Updated Final Safety Analysis Report, (Ufsar), Revision 25, Chapter 9, Drawings ML14287A3472014-09-17017 September 2014 Updated Final Safety Analysis Report,(Ufsar), Revision 25, Chapter 9, Figures ML14287A3422014-09-17017 September 2014 Updated Final Safety Analysis Report, (Ufsar), Revision 25, Chapter 8 - Figures ML11236A2262010-10-0606 October 2010 Partially Released Updated Final Safety Analysis Report for Indian Point Unit 2. (Redacted Information: Figures 5.1-2, 5.1-3, 5.1-4, 5.1-5, 5.1-6 & 5.1-7 Are All Plant Drawings). Table of Contents - Chapter 7, Page 18 of 108 ML11236A2272010-10-0606 October 2010 Partially Released Updated Final Safety Analysis Report for Indian Point Unit 2. (Redacted Information: Figures 5.1-2, 5.1-3, 5.1-4, 5.1-5, 5.1-6 & 5.1-7 Are All Plant Drawings). Chapter 7, Page 19 of 108 - Chapter 14 Figure 14.3-129 ML1012603792010-05-0606 May 2010 Drawing No. A205454, Revision 4, Containment Building Restraint & Support Design, Line 351. ML1000402912010-01-0404 January 2010 Chemical and Volume Control System - Sheet 1, Figure 9.2-1 ML11083A0542009-03-0606 March 2009 Lr Hearing - Slides from ACRS Subcommittee Meeting on March 4, 2009 NL-08-074, Amendment 4 to License Renewal Application (LRA) Letter Dated April 30, 2008 from Entergy Nuclear Northeast (NL-08-074)2008-04-30030 April 2008 Amendment 4 to License Renewal Application (LRA) Letter Dated April 30, 2008 from Entergy Nuclear Northeast (NL-08-074) ML0904008952008-02-29029 February 2008 No. 3 Nuclear Power Plant - Electrical Distribution & Transmission System Diagram 2020-09-14 |