ML080170368

From kanterella
Jump to navigation Jump to search
Summary of Telephone Conference Call Held on January 16, 2008, Between the Us Nuclear Regulatory Commission and Southern Nuclear Operating Company, Inc., Concerning Request for Additional Information Pertaining to the Vogtle Units 1 & 2, Li
ML080170368
Person / Time
Site: Vogtle  Southern Nuclear icon.png
Issue date: 01/28/2008
From: Ashley D
NRC/NRR/ADRO/DLR
To:
ASHLEY D NRR/DLR/RLRA 415-3191
References
Download: ML080170368 (8)


Text

January 28, 2008 LICENSEE: Southern Nuclear Operating Company, Inc.

FACILITY: Vogtle Electric Generating Plant, Units 1 and 2

SUBJECT:

SUMMARY

OF TELEPHONE CONFERENCE CALL HELD ON JANUARY 16, 2008, BETWEEN THE U.S. NUCLEAR REGULATORY COMMISSION AND SOUTHERN NUCLEAR OPERATING COMPANY, INC., CONCERNING REQUEST FOR ADDITIONAL INFORMATION PERTAINING TO THE VOGTLE ELECTRIC GENERATING PLANT, UNITS 1 AND 2, LICENSE RENEWAL APPLICATION The U.S. Nuclear Regulatory Commission (NRC or the staff) and representatives of Southern Nuclear Operating Company, Inc., held a telephone conference call on January 16, 2008, to discuss and clarify the staffs request for additional information (RAI) and audit database questions concerning the Vogtle Electric Generating Plant, Units 1 and 2, license renewal application. The telephone conference call was useful in clarifying the intent of the staffs RAIs. provides a listing of the participants and Enclosure 2 contains a summary of the discussions and a listing of the RAIs; and database questions discussed with the applicant, including a brief description on the status of the items.

The applicant had an opportunity to comment on this summary.

/RA/

Donnie J. Ashley, Sr. Project Manager Projects Branch 1 Division of License Renewal Office of Nuclear Reactor Regulation Docket Nos. 50-424 and 50-425

Enclosures:

As stated cc w/encls: See next page

ML080170368 OFFICE LA:DLR PM:RPB1:DLR BC:RPB1:DLR NAME SFigueroa DAshley LLund DATE 1/17/08 1/17/08 1/28/08 TELEPHONE CONFERENCE CALL VOGTLE ELECTRIC GENERATING PLANT, UNITS 1 AND 2 LICENSE RENEWAL APPLICATION LIST OF PARTICIPANTS JANUARY 16, 2008 PARTICIPANTS AFFILIATIONS Donnie Ashley NRR/DLR/RPB1 Kenneth Chang NRR/DLR/RER1 James Medoff NRR/DLR/RER1 Usman Baig NRR/DLR/RER1 Chalmer Myer Southern Company Louis Bohn Southern Company John Hornbuckle Southern Company ENCLOSURE 1

SUMMARY

OF TELEPHONE CONFERENCE VOGTLE ELECTRIC GENERATING PLANT, UNITS 1 AND 2 LICENSE RENEWAL APPLICATION JANUARY 16, 2008 The U.S. Nuclear Regulatory Commission (NRC or the staff) and representatives of Southern Nuclear Operating Company, Inc., held a telephone conference call on January 16, 2008, to discuss and clarify the following request for additional information (RAIs) and audit database questions concerning the Vogtle Electric Generating Plant (VEGP), Units 1 and 2, license renewal application (LRA).

Q&A Database Question 3.4-05 It is our understanding that the Alloy 625 (nickel-chromium-molybdenum-columbium alloy) used in flex connectors is a new material. The staff asked whether these connectors were included in in the scope of the nickel alloy program for non-reactor vessel head components.

Discussion: The applicant indicated that the question is clear. The material is included in the VT-ISI program. The Q&A Database response will be modified to provide a clarification of the program.

Q&A Database Question 3.4-13 The applicants program uses a One-Time Inspection Program to manage loss of material in stainless steel steam generator blowdown processing system flow orifices/elements, piping components, strainer housings, and valve bodies. The Q&A database response indicated that there is VEGP specific operating experience on loss of material of steam generator blowdown piping downstream of the blowdown demineralizers. The staff indicated that the experience documented was for carbon steel and not stainless steel. The staff asked for a justification for crediting a one-time inspection for this piping.

Discussion: Based on the discussion with the applicant, the staff indicated that the response to this audit database question requires clarification. The applicant agreed to clarify their response by removing any reference to carbon steel piping experience since the Aging Management Review (AMR) referred to in the staffs question pertains to loss of material in stainless steel piping rather than carbon steel.

Q&A Database Question 3.4-22 The staff asked for clarification on which steam and power conversion systems (S&PC) are in scope and which are not, and also which S&PC systems were folded into other S&PC systems.

During the AMR audit, the auditors were told that the condensate system is not in scope.

ENCLOSURE 2

This appears to contradict information in Section 2.4 of the LRA. The staff is seeking clarifi-cation as to how the AMR methodology was applied to the S&PC systems.

Discussion: Based on the discussion with the applicant, the staff indicated that the response to this audit database question requires clarification. The applicant agreed to clarify their response by providing additional information on the combined condensate and feedwater system and how those systems were evaluated in accordance with the applicants AMR methodology. This discussion relates to Question 3.4-01 as well.

Q&A Database Question 4.7.2-2 The staff asked for clarification of the Time Limited Aging Analysis (TLAA) for the corrosion allowances of the fuel oil storage tanks and associated fuel oil piping. The staffs understanding is that the applicant is amending the license renewal application (LRA) to commit to and credit a one-time ultrasonic test (UT) of the interior liners of the fuel oil storage tanks. The staff sought clarification on whether this commitment is applicable to the fuel oil piping as well, since the TLAA is applicable to the fuel oil storage tanks and associated fuel oil piping.

Discussion: The applicant indicated that the question is clear and will evaluate the TLAA and will either provide clarification on the programs and commitments used to accept this TLAA in accordance with 10 CFR54.21(c)(1)(iii) or amend the application to accept this TLAA in accordance with 10 CFR54.21(c)(1)(ii).

Q&A Database Question B.3.10-01 and B.3.10-06 The applicants response to database questions B.3.10-01 and B.3.10-06 may contradict each other.

Discussion: Based on the discussion with the applicant, the staff indicated that the response to this database question requires clarification. The applicant indicated that it would review the responses to each questions B.3.10-01 and B.3.10-06 to confirm the consistency of the information and clarify the responses in the database.

RAIQuestion 4.3-4 LRA Section 4.3.1.5 stated that the environmentally-assisted fatigue on the surge line hot leg nozzle, charging nozzle, and safety injection nozzle was evaluated using fatigue monitoring software. Is this correct? It appears that the safety injection nozzle was evaluated using a different method. Please clarify.

Discussion: The applicant indicated that the question is clear and will incorporate information into the RAI response to clarify whether the safety injection nozzles were evaluated for environmentally-assisted fatigue, and if so, describe the methods.

Letter to Southern Nuclear from Donnie Ashley, dated January 28, 2008 DISTRIBUTION:

SUBJECT:

SUMMARY

OF TELEPHONE CONFERENCE CALL HELD ON JANUARY 16, 2008, BETWEEN THE U.S. NUCLEAR REGULATORY COMMISSION AND SOUTHERN NUCLEAR OPERATING COMPANY, INC., CONCERNING REQUEST FOR ADDITIONAL INFORMATION PERTAINING TO THE VOGTLE ELECTRIC GENERATING PLANT, UNITS 1 AND 2, LICENSE RENEWAL APPLICATION HARD COPY DLR RF E-MAIL:

PUBLIC SSmith (srs3)

SDuraiswamy RidsNrrDlr RidsNrrDlrRlra RidsNrrDlrRlrb RidsNrrDlrRlrc RidsNrrDlrReba RidsNrrDlrRebb RidsNrrDciCvib RidsNrrDciCpnb RidsNrrDraAfpb RidsNrrDeEmcb RidsNrrDeEeeb RidsNrrDssSrxb RidsNrrDssSbpb RidsNrrDssScvb RidsOgcMailCenter DAshley JPLeous BSingal CJulian, RII GMcCoy, RII BAnderson, RII

Vogtle Electric Generating Plant, Units 1 and 2 cc:

Mr. Tom E. Tynan Mr. Laurence Bergen Vice President - Vogtle Oglethorpe Power Corporation Vogtle Electric Generating Plant 2100 East Exchange Place 7821 River Road P.O. Box 1349 Waynesboro, GA 30830 Tucker, GA 30085-1349 Mr. N. J. Stringfellow Arthur H. Domby, Esquire Manager, Licensing Troutman Sanders Southern Nuclear Operating Company, Inc. Nations Bank Plaza P.O. Box 1295 600 Peachtree Street, NE Birmingham, AL 35201-1295 Suite 5200 Atlanta, GA 30308-2216 Mr. Jeffrey T. Gasser Executive Vice President Resident Inspector Southern Nuclear Operating Company, Inc. Vogtle Plant P.O. Box 1295 8805 River Road Birmingham, AL 35201-1295 Waynesboro, GA 30830 Mr. Steven M. Jackson Office of the County Commissioner Senior Engineer - Power Supply Burke County Commission Municipal Electric Authority of Georgia Waynesboro, GA 30830 1470 Riveredge Parkway, NW Atlanta, GA 30328-4684 Mr. Stanford M. Blanton, Esq.

Balch & Bingham, LLP Mr. Reece McAlister P.O. Box 306 Executive Secretary Birmingham, AL 35201 Georgia Public Service Commission 244 Washington Street, SW Ms. Moanica M. Caston Atlanta, GA 30334 Vice President and General Counsel Southern Nuclear Operating Company, Inc.

Mr. Harold Reheis, Director 40 Inverness Center Parkway Department of Natural Resources P.O. Box 1295 205 Butler Street, SE, Suite 1252 Birmingham, AL 35201-1295 Atlanta, GA 30334 Chalmer R. Myer Attorney General Southern Nuclear Operating Company, Inc.

Law Department 40 Inverness Center Parkway 132 Judicial Building P.O. Box 1295 Atlanta, GA 30334 Birmingham, AL 35201-1295