ML080010004
| ML080010004 | |
| Person / Time | |
|---|---|
| Site: | Catawba (NPF-035) |
| Issue date: | 01/02/2008 |
| From: | Office of Nuclear Reactor Regulation |
| To: | Duke Power Co |
| Stang, JF, NRR/DLPM/LPD II-1, 415-1345 | |
| Shared Package | |
| ML080010002 | List: |
| References | |
| TAC MD7563 | |
| Download: ML080010004 (3) | |
Text
(2) Technkal The Technicsl So,,licadons contained In Appendix A, as revised tough Amendment No 2 3 9 whbch are attached hereto, we hereby Incop*ated Into his renewed operating license. Duke Power Company LLC Mg operate the fadty In apowance with the Techrical Specincalons.
(3) FrT, =7 7 -, -1, j 7 1 -r: 7%
MT.% ",-M -!
=7 I The Updated Final Safety Analysis Repoit supiement vkmared Pwsai to 10 CFR 54.21(d), as rvsed on December 16, 2002, descbes ceftah future activitis to be completed before die period of extended operton. Duke shel ornplae Ihse aotles no later than December 6, 2024, and WW notify the NRC In wrifi when
-lpeentaLn of these adMte Is complee and can be vered by NRC hinpcwn The Updated FRnal Safety Anatb*~ Report supplement as revised a n December 16,21M described above, shal be Included In ft net sheduled update to te Updatd Final Safety Anays Repot requihd by 10 CFR 50.71(eX4),
low Issuance ofuf renewed operating license. LM that update Is cormlete. Duke any mrake riings to the prugams dueoIbed in such suppleent whut r ior Commidson spro,,.
provided Mt Dlue evaluates each such omongie pursant to Owe cteri set forth I 10 CFR 50,50 an otherwise conpits vA the requirements I that secton.
(4)
Duke Power Comipany LLC shaft cwnt with Mhe antftrust coxdiflon debwnated in Appendix C to thils.rerw peratin license.
(5) FltPmcnProbram (Sction9.I.1,SER, SSER#2,,5SER#3,MSER#4, Duke Power Company LLC edW hImplement and maintain In effect d Provisions of tbe approved fir. proteain progiam as described In the Updated FRna Safety Anatole Report, as amnended, for te ftcldty and as approved In lhe SER though Supplement 5sbject*dlefot ow'ie pv lo The E1cenhee rosy mauke chqage to the apprved fire pmtactin p.Ia utAU~t prior approval of toe Conutislon only Fflies ctIzgesvJol*1 rio adversely affect the abMY to aheve end mnalnt* oe shutmm In te event of a Wire.
- The parentetical notation following the fttl of thi renewed operafti Icense cond~lbn denotes the section of the Safety Evaluation Report endlr b srupplement whierei IlIs renewed loense condition Is discussed.
Renewed Liens No. NPF45 Amendment No. 239
ECCS -
Operating 3.5.2 3.5 EMERGENCY CORE COOLING SYSTEMS (ECCS) 3.5.2 ECCS-Operating LCO 3.5.2 APPLICABILITY:
Two ECCS trains shall be OPERABLE*.
MODES 1, 2, and 3.
-NOTE In MODE 3, both safety injection (SI) pump flow paths may be isolated by closing the isolation valves for up to 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> to perform pressure isolation valve testing per SR 3.4.14.1.
ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A.
One or more trains A.1 Restore train(s) to 72 hour8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />s*
OPERABLE status.
,AND At least 100% of the ECCS flow equivalent to a single OPERABLE ECCS train available.
B.
Required Action and associated Completion Time not met.
B.1 Be in MODE 3.
AND 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />
ý 1:flt Lý',.Jr-B.2 Be in MODE 4.
12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />
- For Unit 1 only, the Completion Time that the 1B ECCS train can be inoperable as specified by Required Action A.1 may be extended beyond the "72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />" up to a total of 240 hours0.00278 days <br />0.0667 hours <br />3.968254e-4 weeks <br />9.132e-5 months <br /> as part of the 1B centrifugal charging pump repair. Upon completion of the repair and restoration, this footnote is no longer applicable and will expire at 0130 on January 10, 2008.
Catawba Units 1 and 2 3.5.2-1 Amendment Nos. 239/233
ABFVES 3.7.12 3.7 PLANT SYSTEMS 3.7.12 Auxiliary Building Filtered Ventilation Exhaust System (ABFVES)
LCO 3.7:12 Two ABFVES trains shall be OPERABLE*.
I
'l IlUr II --------------------------------------------------
The ECCS pump rooms pressure boundary may be opened intermittently under administrative controls.
APPLICABILITY:
MODES 1, 2, 3, and 4.
ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A.
One ABFVES train A.1 Restore ABFVES train to 7 days inoperable.
OPERABLE status.
B.
Two ABFVES trains B.1 Restore ECCS pump 24 hour2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />s*
inoperable due to rooms pressure boundary inoperable ECCS pump to OPERABLE status.
rooms pressure,.-,.;
boundary.
C.
Required Action and C.1 Be in MODE 3.
6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> associated Completion Time of Condition A or B AND not met.
C.2 Be in MODE 5.
36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br /> D.
One or more ABFVES D.1 Restore ABFVES train(s) 7 days train(s) heater heater to OPERABLE inoperable.
status.
OR D.2 Initiate action in 7 days accordance with Specification 5.6.6.
- For Unit 1 only, the Completion Time that two ABFVES trains can be inoperable due to inoperable ECCS pump rooms pressure boundary as specified by Required Action B.1 may be extended beyond the "24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />" up to a total of 240 hours0.00278 days <br />0.0667 hours <br />3.968254e-4 weeks <br />9.132e-5 months <br /> as part of the 1 B centrifugal charging pump repair. Upon completion of the repair and restoration, this footnote is no longer applicable and will expire at 0130 on January 10, 2008.
Catawba Units 1 and 2 3.7.12-1 Amendment Nos. 239/223